SR1451 over LITTLE CREEK
Map
Coordinates:
+36.49211, -80.2672536°29'32" N, 80°16'02" W
Facts
Source: National Bridge Inventory. Information not verified; use at your own risk.
Name: | SR1451 over LITTLE CREEK |
Structure number: | 000000001690279 |
Old structure number: | 000000000169279 (from 1992 edition) |
Location: | 0.1 MI. E. JCT. SR1497 |
Purpose: | Carries highway over waterway |
Route classification: | Local (Rural) [09] |
Length of largest span: | 40.0 ft. [12.2 m] |
Total length: | 41.0 ft. [12.5 m] |
Roadway width between curbs: | 19.0 ft. [5.8 m] |
Deck width edge-to-edge: | 20.0 ft. [6.1 m] |
Owner: | State Highway Agency [01] |
Year built: | 1974 |
Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
Design load: | M 9 / H 10 [1] |
Main span material: | Steel [3] |
Main span design: | Stringer/Multi-beam or girder [02] |
Deck type: | Wood or Timber [8] |
Wearing surface: | Bituminous [6] |
Latest Available Inspection: January 2017
Good/Fair/Poor Condition: | Fair |
Status: | Posted for load [P] |
Average daily traffic: | 60 [as of 1980] |
Truck traffic: | 6% of total traffic |
Deck condition: | Very Good [8 out of 9] |
Superstructure condition: | Good [7 out of 9] |
Substructure condition: | Fair [5 out of 9] |
Structural appraisal: | Basically intolerable requiring high priority of corrrective action [3] |
Deck geometry appraisal: | Meets minimum tolerable limits to be left in place as is [4] |
Water adequacy appraisal: | Equal to present minimum criteria [6] |
Roadway alignment appraisal: | Equal to present desirable criteria [8] |
Channel protection: | Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6] |
Pier/abutment protection: | Navigation protection not required [1] |
Scour condition: | Bridge with "unknown" foundation that has not been evaluated for scour. [U] |
Sufficiency rating: | 37.4 |
Recommended work: | Bridge rehabilitation because of general structure deterioration or inadequate strength. [35] |
Previous Inspections
Date | Condition | Deck | Superstructure | Substructure | ADT | Suff. Rating |
---|
January 2017 | Fair | Very Good | Good | Fair | 60 | 37.4 |
December 2014 | Fair | Very Good | Good | Fair | 60 | 37.4 |
December 2012 | Fair | Very Good | Good | Fair | 60 | 50.6 |
December 2010 | Fair | Very Good | Very Good | Fair | 60 | 48.2 |
December 2008 | Fair | Very Good | Very Good | Fair | 60 | 48.2 |
December 2006 | Fair | Excellent | Satisfactory | Fair | 60 | 44.1 |
January 2005 | Fair | Excellent | Satisfactory | Fair | 60 | 44.1 |
January 2003 | Fair | Excellent | Satisfactory | Fair | 60 | 44.1 |
January 2001 | Poor | Poor | Satisfactory | Fair | 60 | 49.0 |
November 1998 | Poor | Poor | Satisfactory | Fair | 60 | 49.0 |
November 1996 | Poor | Poor | Satisfactory | Fair | 60 | 49.0 |
November 1994 | Poor | Poor | Satisfactory | Serious | 60 | 34.2 |
November 1992 | Poor | Poor | Satisfactory | Poor | 60 | 36.4 |
November 1990 | Poor | Poor | Fair | Poor | 60 | 35.3 |