Share:

COUNTY HIGHWAY over TURTLE RIVER

Map

Coordinates:
+48.10658, -97.16795
48°06'24" N, 97°10'05" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:COUNTY HIGHWAY over TURTLE RIVER
Structure number:000000018135060
Location:EAST 2 NORTH MANVEL
Purpose:Carries highway over waterway
Route classification:Local (Rural) [09]
Length of largest span:65.9 ft. [20.1 m]
Total length:71.9 ft. [21.9 m]
Roadway width between curbs:16.7 ft. [5.1 m]
Deck width edge-to-edge:18.0 ft. [5.5 m]
Vertical clearance above deck:13.1 ft. [4.0 m]
Owner:County Highway Agency [02]
Year built:1958
Year reconstructed:2001
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:M 18 / H 20 [4]
Main span material:Steel [3]
Main span design:Truss - Thru [10]
Deck type:Wood or Timber [8]
Wearing surface:Wood or Timber [7]

Latest Available Inspection: October 2017

Good/Fair/Poor Condition:Poor
Status:Posted for load [P]
Average daily traffic:25 [as of 2013]
Deck condition:Good [7 out of 9]
Superstructure condition:Poor [4 out of 9]
Substructure condition:Serious [3 out of 9]
Structural appraisal:Basically intolerable requiring high priority of corrrective action [3]
Deck geometry appraisal:Basically intolerable requiring high priority of replacement [2]
Water adequacy appraisal:Better than present minimum criteria [7]
Roadway alignment appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Channel protection:Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and rush restrict the channel. [5]
Scour condition:Bridge with "unknown" foundation that has not been evaluated for scour. [U]
Sufficiency rating:26.5
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$270,000

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
October 2017PoorGoodPoorSerious2526.5
October 2015PoorGoodPoorPoor2533.6
October 2013PoorGoodPoorPoor2533.6
November 2011PoorGoodPoorPoor2533.6
December 2009PoorGoodPoorPoor2533.6
September 2007PoorVery GoodPoorPoor2533.6
December 2005PoorVery GoodPoorPoor2533.6
December 2003PoorVery GoodPoorPoor2533.6
October 2001PoorExcellentPoorPoor2533.6
November 1999PoorFairPoorPoor2532.6
September 1997PoorSatisfactoryPoorPoor2533.6
December 1995PoorSatisfactoryPoorPoor2533.6
December 1993PoorSatisfactoryPoorPoor2533.6
December 1991PoorFairPoorPoor2532.6

Element Data

Source: National Bridge Elements dataset, 2019 edition. This feature is experimental.
ElementUnitsQuantity1-Good2-Fair3-Poor4-Serious
Superstructure
Steel Stringerlinear ft.784007840
Steel Protective Coatingsq. ft.100000100
Steel Trusslinear ft.144001440
Steel Protective Coatingsq. ft.100000100
Steel Floor Beamlinear ft.7907900
Steel Protective Coatingsq. ft.100000100
Substructure
Steel Columneach40022
Steel Protective Coatingsq. ft.100000100
Reinforced Concrete Abutmentlinear ft.3000300
Steel Pier Caplinear ft.3000300
Steel Protective Coatingsq. ft.100000100
Deck
Timber Decksq. ft.1,2161,216000
Bridge Rail
Steel or Aluminum Bridge Raillinear ft.144001440
Steel Protective Coatingsq. ft.100000100
Timber Bridge Raillinear ft.144144000