HELLER HILL ROAD over SCRANTON BRNCH (NS-ABAN)
Map
Coordinates:
+40.96810, -74.9655040°58'05" N, 74°57'56" W
Facts
Source: National Bridge Inventory. Information not verified; use at your own risk.
Name: | HELLER HILL ROAD over SCRANTON BRNCH (NS-ABAN) |
Structure number: | 2153162 |
Location: | 1.0 mi south of CR 521/94 |
Route classification: | Local (Rural) [09] |
Length of largest span: | 65.0 ft. [19.8 m] |
Total length: | 65.0 ft. [19.8 m] |
Roadway width between curbs: | 24.3 ft. [7.4 m] |
Deck width edge-to-edge: | 28.9 ft. [8.8 m] |
Skew angle: | 30° |
Owner: | Unknown [80] |
Year built: | 1910 |
Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
Main span material: | Concrete [1] |
Main span design: | Arch - Deck [11] |
Deck type: | Not applicable [N] |
Latest Available Inspection: November 2018
Good/Fair/Poor Condition: | Fair |
Status: | Open, no restriction [A] |
Average daily traffic: | 515 [as of 2016] |
Truck traffic: | 3% of total traffic |
Superstructure condition: | Fair [5 out of 9] |
Substructure condition: | Fair [5 out of 9] |
Structural appraisal: | Somewhat better than minimum adequacy to tolerate being left in place as is [5] |
Deck geometry appraisal: | Meets minimum tolerable limits to be left in place as is [4] |
Roadway alignment appraisal: | Equal to present desirable criteria [8] |
Scour condition: | Bridge not over waterway. [N] |
Sufficiency rating: | 74.8 |
Previous Inspections
Date | Condition | Deck | Superstructure | Substructure | ADT | Suff. Rating |
---|
November 2018 | Fair | - | Fair | Fair | 515 | 74.8 |
November 2016 | Fair | - | Fair | Fair | 515 | 74.8 |
January 2015 | Fair | - | Fair | Fair | 500 | 74.8 |
February 2013 | Fair | - | Fair | Fair | 449 | 74.9 |
December 2010 | Fair | - | Fair | Fair | 449 | 74.9 |
November 2008 | Fair | - | Fair | Fair | 436 | 74.9 |
December 2006 | Fair | - | Fair | Fair | 420 | 74.9 |
October 2004 | Fair | - | Fair | Fair | 420 | 74.9 |
August 2002 | Fair | - | Fair | Fair | 410 | 74.9 |
October 2000 | Fair | - | Fair | Fair | 400 | 75.9 |
September 1998 | Fair | - | Fair | Fair | 400 | 75.9 |
June 1996 | Fair | - | Fair | Fair | 400 | 75.9 |
May 1994 | Fair | - | Fair | Fair | 370 | 74.9 |
June 1992 | Fair | - | Fair | Fair | 310 | 64.8 |
Element Data
Source: National Bridge Elements dataset, 2019 edition. This feature is experimental.
Element | Units | Quantity | 1-Good | 2-Fair | 3-Poor | 4-Serious |
---|
Superstructure |
Reinforced Concrete Arch | linear ft. | 65 | 0 | 25 | 40 | 0 |
Substructure |
Reinforced Concrete Abutment | linear ft. | 58 | 0 | 45 | 13 | 0 |
Bridge Rail |
Reinforced Concrete Bridge Rail | linear ft. | 130 | 0 | 0 | 130 | 0 |