RTE 345 over GRASSE RIVER
Map
Coordinates:
+44.74688, -75.1304044°44'49" N, 75°07'49" W
Facts
Source: National Bridge Inventory. Information not verified; use at your own risk.
Name: | RTE 345 over GRASSE RIVER |
Structure number: | 000000001027310 |
Location: | IN MADRID |
Purpose: | Carries highway and pedestrian walkway over waterway |
Route classification: | Major Collector (Rural) [07] |
Length of largest span: | 44.9 ft. [13.7 m] |
Total length: | 402.9 ft. [122.8 m] |
Roadway width between curbs: | 22.0 ft. [6.7 m] |
Deck width edge-to-edge: | 27.9 ft. [8.5 m] |
Owner: | State Highway Agency [01] |
Year built: | 1882 |
Year reconstructed: | 2009 |
Historic significance: | Bridge is eligible for the National Register of Historic Places [2] |
Design load: | MS 22.5 / HS 25 [9] |
Number of main spans: | 9 |
Main spans material: | Masonry [8] |
Main spans design: | Arch - Deck [11] |
Deck type: | Concrete Cast-in-Place [1] |
Wearing surface: | Integral Concrete (separate non-modified layer of concrete added to structural deck) [2] |
Latest Available Inspection: October 2017
Good/Fair/Poor Condition: | Good |
Status: | Open, no restriction [A] |
Average daily traffic: | 3,522 [as of 2016] |
Truck traffic: | 6% of total traffic |
Superstructure condition: | Very Good [8 out of 9] |
Substructure condition: | Very Good [8 out of 9] |
Structural appraisal: | Equal to present desirable criteria [8] |
Deck geometry appraisal: | Basically intolerable requiring high priority of replacement [2] |
Water adequacy appraisal: | Equal to present minimum criteria [6] |
Roadway alignment appraisal: | Equal to present desirable criteria [8] |
Channel protection: | Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8] |
Scour condition: | Bridge foundations determined to be stable for assessed or calculated scour condition. [5] |
Sufficiency rating: | 76.4 |
Recommended work: | Widening of existing bridge with deck rehabilitation or replacement. [34] |
Estimated cost of work: | $6,947,000 |
Previous Inspections
Date | Condition | Deck | Superstructure | Substructure | ADT | Suff. Rating |
---|
October 2017 | Good | - | Very Good | Very Good | 3522 | 76.4 |
October 2015 | Good | - | Very Good | Very Good | 2229 | 77.7 |
October 2013 | Good | - | Very Good | Very Good | 2229 | 77.7 |
September 2011 | Good | - | Very Good | Excellent | 2700 | 77.2 |
December 2009 | Good | - | Excellent | Excellent | 3273 | 76.6 |
October 2008 | Poor | - | Imminent Failure | Good | 3273 | 7.0 |
October 2007 | Poor | - | Poor | Good | 3273 | 7.0 |
September 2006 | Poor | - | Poor | Good | 3288 | 7.0 |
August 2005 | Poor | - | Poor | Good | 1897 | 7.0 |
August 2003 | Fair | - | Fair | Good | 1897 | 53.3 |
August 2001 | Good | Good | Good | Good | 1820 | 66.8 |
June 1999 | Good | Good | Good | Good | 1803 | 66.8 |
July 1997 | Fair | - | Fair | Satisfactory | 1864 | 55.2 |
August 1995 | Poor | - | Poor | Fair | 1855 | 42.6 |
October 1993 | Fair | - | Fair | Fair | 3245 | 57.0 |
August 1991 | Poor | - | Poor | Fair | 1694 | 44.2 |
Element Data
Source: National Bridge Elements dataset, 2019 edition. This feature is experimental.
Element | Units | Quantity | 1-Good | 2-Fair | 3-Poor | 4-Serious |
---|
Wearing Surfaces | sq. ft. | 9,672 | 2,418 | 2,418 | 4,836 | 0 |
Superstructure |
Reinforced Concrete Arch | linear ft. | 403 | 403 | 0 | 0 | 0 |
Substructure |
Reinforced Concrete Pier Wall | linear ft. | 240 | 160 | 80 | 0 | 0 |
Bridge Rail |
Steel or Aluminum Bridge Rail | linear ft. | 806 | 806 | 0 | 0 | 0 |
Steel Protective Coating | sq. ft. | 4,465 | 4,465 | 0 | 0 | 0 |