BUSH ROAD over SCHOHARIE CREEK

This bridge is no longer in the current National Bridge Inventory database, and has likely been demolished or abandoned.

Map

Coordinates:
+42.23852, -74.33985
42°14'19" N, 74°20'23" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:BUSH ROAD over SCHOHARIE CREEK
Structure number:000000003201210
Location:1.5 MI EAST OF LEXINGTON
Purpose:Carries highway over waterway
Route classification:Local (Rural) [09]
Length of largest span:128.9 ft. [39.3 m]
Total length:129.9 ft. [39.6 m]
Roadway width between curbs:12.1 ft. [3.7 m]
Deck width edge-to-edge:18.4 ft. [5.6 m]
Owner:County Highway Agency [02]
Year built:1935
Year reconstructed:2005
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18+Mod / HS 20+Mod [6]
Main span material:Steel [3]
Main span design:Truss - Thru [10]
Deck type:Steel plate (includes orthotropic) [5]
Wearing surface:Bituminous [6]

Latest Available Inspection: September 2009

Good/Fair/Poor Condition:Fair
Status:Open, no restriction [A]
Average daily traffic:20 [as of 2009]
Truck traffic:8% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Fair [5 out of 9]
Structural appraisal:Basically intolerable requiring high priority of corrrective action [3]
Deck geometry appraisal:Meets minimum tolerable limits to be left in place as is [4]
Water adequacy appraisal:Meets minimum tolerable limits to be left in place as is [4]
Roadway alignment appraisal:Meets minimum tolerable limits to be left in place as is [4]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Sufficiency rating:24.9
Recommended work:Widening of existing bridge with deck rehabilitation or replacement. [34]
Estimated cost of work:$284,000

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
September 2009FairSatisfactoryGoodFair2024.9
November 1999PoorSatisfactorySeriousSerious2012.7
October 1991PoorVery GoodFairSerious2015.8