US 30 WB over SR39C;RMPB;RR;RVR RD;OHR
Map
Coordinates:
+40.62132, -80.5635640°37'17" N, 80°33'49" W
Facts
Source: National Bridge Inventory. Information not verified; use at your own risk.
Name: | US 30 WB over SR39C;RMPB;RR;RVR RD;OHR |
Structure number: | 1502395 |
Location: | AT APPROACH OHIO R.BR. |
Purpose: | Carries highway over highway and waterway |
Route classification: | Principal Arterial - Other (Rural) [02] |
Length of largest span: | 225.7 ft. [68.8 m] |
Total length: | 777.9 ft. [237.1 m] |
Roadway width between curbs: | 29.5 ft. [9.0 m] |
Deck width edge-to-edge: | 32.8 ft. [10.0 m] |
Vertical clearance below bridge: | 82.0 ft. [25.0 m] |
Skew angle: | 99° |
Owner: | State Highway Agency [01] |
Year built: | 1976 |
Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
Design load: | MS 18 / HS 20 [5] |
Main span material: | Steel continuous [4] |
Main span design: | Stringer/Multi-beam or girder [02] |
Deck type: | Concrete Cast-in-Place [1] |
Wearing surface: | Monolithic Concrete (concurrently placed with structural deck) [1] |
Latest Available Inspection: September 2018
Good/Fair/Poor Condition: | Fair |
Status: | Open, no restriction [A] |
Average daily traffic: | 7,280 [as of 2015] |
Truck traffic: | 10% of total traffic |
Deck condition: | Satisfactory [6 out of 9] |
Superstructure condition: | Fair [5 out of 9] |
Substructure condition: | Good [7 out of 9] |
Structural appraisal: | Somewhat better than minimum adequacy to tolerate being left in place as is [5] |
Deck geometry appraisal: | Basically intolerable requiring high priority of corrrective action [3] |
Underclearances appraisal: | Basically intolerable requiring high priority of corrrective action [3] |
Water adequacy appraisal: | Superior to present desirable criteria [9] |
Roadway alignment appraisal: | Equal to present desirable criteria [8] |
Channel protection: | Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6] |
Pier/abutment protection: | Navigation protection not required [1] |
Scour condition: | Bridge foundations determined to be stable for the assessed or calculated scour condition. [8] |
Sufficiency rating: | 51.0 |
Recommended work: | Other structural work, including hydraulic replacements. [38] |
Estimated cost of work: | $721,000,000 |
Previous Inspections
Date | Condition | Deck | Superstructure | Substructure | ADT | Suff. Rating |
---|
September 2018 | Fair | Satisfactory | Fair | Good | 7280 | 51.0 |
May 2017 | Fair | Satisfactory | Fair | Good | 7280 | 51.0 |
March 2016 | Fair | Good | Satisfactory | Satisfactory | 3239 | 96.0 |
May 2015 | Fair | Good | Satisfactory | Satisfactory | 7350 | 96.0 |
May 2014 | Fair | Good | Satisfactory | Satisfactory | 7350 | 96.0 |
October 2013 | Fair | Good | Satisfactory | Satisfactory | 7350 | 96.0 |
January 2012 | Fair | Good | Satisfactory | Satisfactory | 7350 | 94.0 |
August 2010 | Fair | Good | Good | Satisfactory | 7350 | 94.0 |
November 2009 | Fair | Good | Good | Satisfactory | 9068 | 94.0 |
July 2008 | Fair | Good | Good | Satisfactory | 9068 | 94.0 |
July 2007 | Good | Good | Good | Good | 9068 | 94.0 |
September 2006 | Good | Good | Very Good | Good | 9343 | 94.0 |
September 2005 | Good | Good | Very Good | Very Good | 9343 | 94.0 |
December 2004 | Good | Good | Very Good | Very Good | 9343 | 94.0 |
November 2003 | Good | Good | Very Good | Very Good | 6970 | 94.0 |
August 2002 | Good | Good | Very Good | Very Good | 6970 | 94.0 |
January 2000 | Good | Good | Very Good | Very Good | 6970 | 96.0 |
October 1998 | Good | Good | Very Good | Very Good | 6970 | 96.0 |
November 1997 | Good | Very Good | Very Good | Very Good | 7301 | 96.0 |
August 1996 | Good | Good | Good | Very Good | 7301 | 96.0 |
August 1994 | Good | Good | Good | Very Good | 7301 | 96.0 |
August 1993 | Good | Good | Good | Very Good | 7301 | 96.0 |
August 1992 | Good | Good | Good | Very Good | 6270 | 96.0 |
August 1991 | Good | Good | Good | Very Good | 6270 | 96.0 |
Element Data
Source: National Bridge Elements dataset, 2019 edition. This feature is experimental.
Element | Units | Quantity | 1-Good | 2-Fair | 3-Poor | 4-Serious |
---|
Superstructure |
Steel Girder/Beam | linear ft. | 2,920 | 2,920 | 0 | 0 | 0 |
Steel Protective Coating | sq. ft. | 230,328 | 230,328 | 0 | 0 | 0 |
Deck |
Reinforced Concrete Deck | sq. ft. | 25,512 | 25,462 | 0 | 50 | 0 |
Wearing Surfaces | sq. ft. | 22,945 | 0 | 22,945 | 0 | 0 |
Superstructure |
Steel Pin or Pin & Hangar Assembly | each | 5 | 0 | 4 | 1 | 0 |
Substructure |
Reinforced Concrete Column | each | 12 | 12 | 0 | 0 | 0 |
Reinforced Concrete Abutment | linear ft. | 87 | 0 | 87 | 0 | 0 |
Steel Pier Cap | linear ft. | 173 | 173 | 0 | 0 | 0 |
Joints |
Assembly without Seal Joint | linear ft. | 84 | 84 | 0 | 0 | 0 |
Bearings |
Pot Bearing | each | 30 | 0 | 28 | 2 | 0 |
Bridge Rail |
Reinforced Concrete Bridge Rail | linear ft. | 1,556 | 1 | 1,555 | 0 | 0 |