Share:

6622C over LITTLE DOG CREEK

This bridge is no longer in the current National Bridge Inventory database, and has likely been demolished or abandoned.

Map

Coordinates:
+36.36667, -95.53667
36°22'00" N, 95°32'12" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:6622C over LITTLE DOG CREEK
Structure number:002020000000000
Location:2.0 MI E OF SH 66
Purpose:Carries highway over waterway
Route classification:Major Collector (Rural) [07]
Length of largest span:60.0 ft. [18.3 m]
Total length:60.0 ft. [18.3 m]
Roadway width between curbs:24.9 ft. [7.6 m]
Deck width edge-to-edge:24.9 ft. [7.6 m]
Owner:County Highway Agency [02]
Year built:1940
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Main span material:Steel [3]
Main span design:Truss - Thru [10]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

Latest Available Inspection: July 2011

Good/Fair/Poor Condition:Poor
Status:Posted for load [P]
Average daily traffic:750 [as of 2010]
Truck traffic:15% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Poor [4 out of 9]
Structural appraisal:Basically intolerable requiring high priority of replacement [2]
Deck geometry appraisal:Meets minimum tolerable limits to be left in place as is [4]
Water adequacy appraisal:Meets minimum tolerable limits to be left in place as is [4]
Roadway alignment appraisal:Meets minimum tolerable limits to be left in place as is [4]
Channel protection:Bank and embankment protection is severely undermined. River control devices have severe damage. Large deposits of debris are in the channel. [4]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Sufficiency rating:26.1
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$393,000

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
July 2011PoorSatisfactoryFairPoor75026.1
October 2009PoorSatisfactoryFairPoor75027.2
July 2007PoorSatisfactoryFairPoor75027.2
October 2006PoorSatisfactoryFairPoor75027.2
May 2005PoorSatisfactoryFairPoor75027.2
July 2004PoorSatisfactoryFairPoor75027.2
April 2003PoorSatisfactoryFairPoor75027.2
February 2002PoorSatisfactoryFairPoor75027.2
February 2001PoorSatisfactoryFairPoor75027.2
September 1996PoorGoodPoorSerious75027.2
March 1994PoorSatisfactoryFairPoor75022.5
March 1993PoorSatisfactoryFairPoor10032.9
February 1992FairSatisfactoryFairFair10043.0