Share:

6144C over WILDHORSE CREEK

This bridge is no longer in the current National Bridge Inventory database, and has likely been demolished or abandoned.

Map

Coordinates:
+34.73845, -95.75382
34°44'18" N, 95°45'14" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:6144C over WILDHORSE CREEK
Structure number:013470000000000
Old structure number:61E1570N4080003 (from 1992 edition)
Location:1. S 1. E OF BLANCO
Purpose:Carries highway over waterway
Route classification:Major Collector (Rural) [07]
Length of largest span:80.1 ft. [24.4 m]
Total length:149.0 ft. [45.4 m]
Roadway width between curbs:17.1 ft. [5.2 m]
Deck width edge-to-edge:18.0 ft. [5.5 m]
Owner:County Highway Agency [02]
Year built:1923
Historic significance:Bridge is eligible for the National Register of Historic Places [2]
Design load:M 13.5 / H 15 [2]
Main span material:Steel [3]
Main span design:Truss - Thru [10]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

Latest Available Inspection: October 2013

Good/Fair/Poor Condition:Poor
Status:Posted for load [P]
Average daily traffic:100 [as of 2013]
Truck traffic:15% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Poor [4 out of 9]
Substructure condition:Poor [4 out of 9]
Structural appraisal:Meets minimum tolerable limits to be left in place as is [4]
Deck geometry appraisal:Basically intolerable requiring high priority of corrrective action [3]
Water adequacy appraisal:Equal to present minimum criteria [6]
Roadway alignment appraisal:Meets minimum tolerable limits to be left in place as is [4]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Sufficiency rating:41.6
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$670,000

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
October 2013PoorFairPoorPoor10041.6
November 2011PoorFairPoorPoor10026.8
December 2009FairFairFairGood10041.9
October 2007FairFairFairGood10041.9
August 2005FairFairFairGood10031.9
October 2003FairFairFairGood10044.9
January 2002FairFairFairGood10044.9
January 2000FairFairSatisfactoryGood10046.6
January 1998FairFairSatisfactoryGood10052.6
January 1996FairSatisfactorySatisfactorySatisfactory10061.0
March 1994FairSatisfactorySatisfactorySatisfactory10061.0
March 1992FairFairSatisfactorySatisfactory10063.8