E0695 over CREEK
This bridge is no longer in the current National Bridge Inventory database, and has likely been demolished or abandoned.
Map
Coordinates:
+36.01500, -98.3700036°00'54" N, 98°22'12" W
Facts
Source: National Bridge Inventory. Information not verified; use at your own risk.
Name: | E0695 over CREEK |
Structure number: | 120570000000000 |
Location: | 2.5N 1.5W OF HITCHCOCK |
Purpose: | Carries highway over waterway |
Route classification: | Local (Rural) [09] |
Length of largest span: | 40.0 ft. [12.2 m] |
Total length: | 40.0 ft. [12.2 m] |
Roadway width between curbs: | 16.1 ft. [4.9 m] |
Deck width edge-to-edge: | 16.1 ft. [4.9 m] |
Owner: | County Highway Agency [02] |
Year built: | 1920 |
Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
Main span material: | Steel [3] |
Main span design: | Truss - Thru [10] |
Deck type: | Wood or Timber [8] |
Latest Available Inspection: March 2010
Good/Fair/Poor Condition: | Poor |
Status: | Posted for load [P] |
Average daily traffic: | 100 [as of 2008] |
Truck traffic: | 10% of total traffic |
Deck condition: | Fair [5 out of 9] |
Superstructure condition: | Critical [2 out of 9] |
Substructure condition: | Poor [4 out of 9] |
Structural appraisal: | Basically intolerable requiring high priority of replacement [2] |
Deck geometry appraisal: | Basically intolerable requiring high priority of corrrective action [3] |
Water adequacy appraisal: | Equal to present minimum criteria [6] |
Roadway alignment appraisal: | Basically intolerable requiring high priority of corrrective action [3] |
Channel protection: | Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6] |
Pier/abutment protection: | Navigation protection not required [1] |
Scour condition: | Bridge foundations determined to be stable for the assessed or calculated scour condition. [8] |
Sufficiency rating: | 19.0 |
Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
Estimated cost of work: | $225,000 |
Previous Inspections
Date | Condition | Deck | Superstructure | Substructure | ADT | Suff. Rating |
---|
March 2010 | Poor | Fair | Critical | Poor | 100 | 19.0 |
March 1999 | Poor | Poor | Critical | Fair | 100 | 19.8 |