U.S. 59 over CACHE CREEK
This bridge is no longer in the current National Bridge Inventory database, and has likely been demolished or abandoned.
Map
Coordinates:
+35.28640, -94.7614235°17'11" N, 94°45'41" W
Facts
Source: National Bridge Inventory. Information not verified; use at your own risk.
Name: | U.S. 59 over CACHE CREEK |
Structure number: | 130630000000000 |
Location: | 2.0 mi N jct SH-9 |
Purpose: | Carries highway over waterway |
Route classification: | Principal Arterial - Other (Rural) [02] |
Length of largest span: | 44.9 ft. [13.7 m] |
Total length: | 137.1 ft. [41.8 m] |
Roadway width between curbs: | 27.9 ft. [8.5 m] |
Deck width edge-to-edge: | 33.1 ft. [10.1 m] |
Skew angle: | 30° |
Owner: | State Highway Agency [01] |
Year built: | 1953 |
Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
Design load: | M 18 / H 20 [4] |
Number of main spans: | 3 |
Main spans material: | Steel [3] |
Main spans design: | Stringer/Multi-beam or girder [02] |
Deck type: | Concrete Cast-in-Place [1] |
Wearing surface: | Bituminous [6] |
Latest Available Inspection: May 2008
Good/Fair/Poor Condition: | Fair |
Status: | Open, no restriction [A] |
Average daily traffic: | 3,600 [as of 2008] |
Truck traffic: | 16% of total traffic |
Deck condition: | Satisfactory [6 out of 9] |
Superstructure condition: | Fair [5 out of 9] |
Substructure condition: | Fair [5 out of 9] |
Structural appraisal: | Somewhat better than minimum adequacy to tolerate being left in place as is [5] |
Deck geometry appraisal: | Meets minimum tolerable limits to be left in place as is [4] |
Water adequacy appraisal: | Superior to present desirable criteria [9] |
Roadway alignment appraisal: | Equal to present desirable criteria [8] |
Channel protection: | Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8] |
Pier/abutment protection: | Navigation protection not required [1] |
Scour condition: | Bridge foundations determined to be stable for the assessed or calculated scour condition. [8] |
Sufficiency rating: | 45.3 |
Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
Estimated cost of work: | $1,722,000 |
Previous Inspections
Date | Condition | Deck | Superstructure | Substructure | ADT | Suff. Rating |
---|
May 2008 | Fair | Satisfactory | Fair | Fair | 3600 | 45.3 |
April 2000 | Fair | Satisfactory | Satisfactory | Good | 6160 | 51.6 |