Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:I-40 BUS. over NORTH FORK OF RED RIVER
Structure number:142130000000000
Location:1.4 MI N JCT U.S. 283
Purpose:Carries highway and pedestrian walkway over waterway
Route classification:Minor Arterial (Urban) [16]
Length of largest span:100.1 ft. [30.5 m]
Total length:1306.2 ft. [398.1 m]
Roadway width between curbs:54.1 ft. [16.5 m]
Deck width edge-to-edge:60.0 ft. [18.3 m]
Owner:State Highway Agency [01]
Year built:1958
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:12
Main spans material:Steel continuous [4]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

Latest Available Inspection: March 2017

Good/Fair/Poor Condition:Fair
Status:Open, no restriction [A]
Average daily traffic:2,400 [as of 2016]
Truck traffic:15% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Fair [5 out of 9]
Structural appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck geometry appraisal:Meets minimum tolerable limits to be left in place as is [4]
Water adequacy appraisal:Better than present minimum criteria [7]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Sufficiency rating:67.0
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$9,133,000

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
March 2017FairFairFairFair240067.0
March 2015FairFairFairFair240067.0
March 2013FairFairFairFair240067.0
March 2011FairFairFairFair230067.0
March 2009FairFairFairFair230067.0
March 2007FairFairFairFair240049.5
February 2005FairSatisfactorySatisfactorySatisfactory240064.6
January 2003FairFairSatisfactorySatisfactory229076.1
March 2001FairFairSatisfactoryFair220078.2
December 1998FairFairVery GoodFair220078.2
January 1997FairFairVery GoodFair212078.2
January 1995FairSatisfactoryFairFair360078.7
November 1992FairFairSatisfactorySatisfactory360088.8
November 1990FairFairSatisfactorySatisfactory350088.9