Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:S.H. 31 over CLEAR BOGGY CREEK O'FLOW
Structure number:217030000000000
Old structure number:1508 0276 X (from 1992 edition)
Location:2.8 MI E SH48
Purpose:Carries highway over relief for waterway
Route classification:Major Collector (Rural) [07]
Length of largest span:55.1 ft. [16.8 m]
Total length:220.2 ft. [67.1 m]
Roadway width between curbs:30.8 ft. [9.4 m]
Deck width edge-to-edge:33.1 ft. [10.1 m]
Owner:State Highway Agency [01]
Year built:1987
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:4
Main spans material:Prestressed concrete [5]
Main spans design:Tee beam [04]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

Latest Available Inspection: September 2018

Good/Fair/Poor Condition:Good
Status:Open, no restriction [A]
Average daily traffic:620 [as of 2016]
Truck traffic:15% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Structural appraisal:Better than present minimum criteria [7]
Deck geometry appraisal:Equal to present minimum criteria [6]
Water adequacy appraisal:Equal to present desirable criteria [8]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Sufficiency rating:99.1
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$2,137,000

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
September 2018GoodGoodGoodGood62099.1
September 2016GoodGoodGoodGood62099.1
September 2014GoodGoodGoodGood62099.1
September 2012GoodGoodGoodGood62099.1
September 2010GoodGoodGoodGood120094.6
September 2008GoodGoodGoodGood120094.6
May 2006GoodGoodVery GoodGood57099.1
March 2004FairSatisfactoryVery GoodGood52099.2
May 2002GoodGoodVery GoodGood72098.9
April 2000GoodGoodExcellentGood74098.9
February 1996FairSatisfactoryVery GoodSatisfactory50099.2
November 1993GoodGoodGoodGood50099.2
November 1991GoodGoodGoodGood45094.3