U.S. 75 over MUDDY BOGGY CREEK

Map

Coordinates:
+34.74034, -96.26442
34°44'25" N, 96°15'52" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:U.S. 75 over MUDDY BOGGY CREEK
Structure number:237770000000000
Location:11.9 MI N SH3
Purpose:Carries highway over waterway
Route classification:Minor Arterial (Rural) [06]
Length of largest span:95.1 ft. [29.0 m]
Total length:381.9 ft. [116.4 m]
Roadway width between curbs:40.0 ft. [12.2 m]
Deck width edge-to-edge:42.0 ft. [12.8 m]
Owner:State Highway Agency [01]
Year built:1994
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:4
Main spans material:Prestressed concrete [5]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

Latest Available Inspection: September 2018

Good/Fair/Poor Condition:Good
Status:Open, no restriction [A]
Average daily traffic:1,800 [as of 2016]
Truck traffic:16% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Good [7 out of 9]
Structural appraisal:Better than present minimum criteria [7]
Deck geometry appraisal:Better than present minimum criteria [7]
Water adequacy appraisal:Equal to present desirable criteria [8]
Roadway alignment appraisal:Better than present minimum criteria [7]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Sufficiency rating:94.1
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$2,747,000

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
September 2018GoodGoodVery GoodGood180094.1
September 2016GoodGoodVery GoodGood180094.1
September 2014GoodGoodVery GoodGood180094.1
September 2012GoodGoodVery GoodGood180094.1
September 2010GoodGoodVery GoodGood190093.8
September 2008GoodGoodVery GoodGood190093.8
April 2006GoodGoodVery GoodGood45098.4
March 2004FairSatisfactoryVery GoodGood44098.4
May 2002FairSatisfactoryVery GoodGood42098.5
April 2000FairSatisfactoryExcellentGood42098.5
February 1996FairSatisfactoryVery GoodSatisfactory50098.3
September 1994GoodVery GoodVery GoodVery Good50098.3