E0480 over CAMP CREEK
Map
Coordinates:
+36.31874, -96.7076236°19'07" N, 96°42'27" W
Facts
Source: National Bridge Inventory. Information not verified; use at your own risk.
Name: | E0480 over CAMP CREEK |
Structure number: | 246510000000000 |
Location: | .2S .7E 4S .9W OF SKEDEE |
Purpose: | Carries highway over waterway |
Route classification: | Local (Rural) [09] |
Length of largest span: | 105.0 ft. [32.0 m] |
Total length: | 147.6 ft. [45.0 m] |
Roadway width between curbs: | 26.6 ft. [8.1 m] |
Deck width edge-to-edge: | 28.5 ft. [8.7 m] |
Owner: | County Highway Agency [02] |
Year built: | 1995 |
Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
Design load: | MS 18 / HS 20 [5] |
Number of main spans: | 2 |
Main spans material: | Prestressed concrete [5] |
Main spans design: | Stringer/Multi-beam or girder [02] |
Deck type: | Concrete Cast-in-Place [1] |
Wearing surface: | Monolithic Concrete (concurrently placed with structural deck) [1] |
Latest Available Inspection: July 2017
Good/Fair/Poor Condition: | Good |
Status: | Open, no restriction [A] |
Average daily traffic: | 100 [as of 2016] |
Truck traffic: | 10% of total traffic |
Deck condition: | Good [7 out of 9] |
Superstructure condition: | Very Good [8 out of 9] |
Substructure condition: | Good [7 out of 9] |
Structural appraisal: | Better than present minimum criteria [7] |
Deck geometry appraisal: | Equal to present minimum criteria [6] |
Water adequacy appraisal: | Equal to present minimum criteria [6] |
Roadway alignment appraisal: | Equal to present desirable criteria [8] |
Channel protection: | Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8] |
Pier/abutment protection: | Navigation protection not required [1] |
Scour condition: | Bridge foundations determined to be stable for the assessed or calculated scour condition. [8] |
Sufficiency rating: | 97.0 |
Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
Estimated cost of work: | $668,000 |
Previous Inspections
Date | Condition | Deck | Superstructure | Substructure | ADT | Suff. Rating |
---|
July 2017 | Good | Good | Very Good | Good | 100 | 97.0 |
July 2015 | Fair | Good | Very Good | Satisfactory | 100 | 97.0 |
August 2013 | Fair | Good | Very Good | Satisfactory | 100 | 97.0 |
August 2011 | Fair | Good | Very Good | Satisfactory | 100 | 97.0 |
November 2009 | Fair | Good | Very Good | Satisfactory | 100 | 100.0 |
October 2007 | Good | Good | Very Good | Good | 100 | 100.0 |
July 2005 | Good | Good | Very Good | Good | 100 | 100.0 |
May 2003 | Good | Good | Very Good | Good | 100 | 100.0 |
June 2001 | Good | Good | Very Good | Good | 100 | 100.0 |
August 1999 | Good | Good | Excellent | Good | 100 | 100.0 |
January 1997 | Good | Good | Excellent | Good | 100 | 100.0 |
May 1995 | Fair | Fair | Satisfactory | Satisfactory | 100 | 32.9 |