OR 47 (HWY 102) over Beaver Creek
Map
Coordinates:
+45.83887, -123.2194745°50'20" N, 123°13'10" W
Facts
Source: National Bridge Inventory. Information not verified; use at your own risk.
Name: | OR 47 (HWY 102) over Beaver Creek |
Structure number: | 02301 102 06460 |
Location: | 1.5 MI S VERNONIA |
Purpose: | Carries highway over waterway |
Route classification: | Major Collector (Rural) [07] |
Length of largest span: | 28.9 ft. [8.8 m] |
Total length: | 86.9 ft. [26.5 m] |
Roadway width between curbs: | 25.9 ft. [7.9 m] |
Deck width edge-to-edge: | 29.5 ft. [9.0 m] |
Skew angle: | 30° |
Owner: | State Highway Agency [01] |
Year built: | 1936 |
Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
Design load: | M 13.5 / H 15 [2] |
Number of main spans: | 3 |
Main spans material: | Wood or timber [7] |
Main spans design: | Stringer/Multi-beam or girder [02] |
Deck type: | Concrete Cast-in-Place [1] |
Wearing surface: | Bituminous [6] |
Latest Available Inspection: May 2018
Good/Fair/Poor Condition: | Fair |
Status: | Open, no restriction [A] |
Average daily traffic: | 2,800 [as of 2017] |
Truck traffic: | 13% of total traffic |
Deck condition: | Satisfactory [6 out of 9] |
Superstructure condition: | Satisfactory [6 out of 9] |
Substructure condition: | Fair [5 out of 9] |
Structural appraisal: | Somewhat better than minimum adequacy to tolerate being left in place as is [5] |
Deck geometry appraisal: | Basically intolerable requiring high priority of corrrective action [3] |
Water adequacy appraisal: | Equal to present minimum criteria [6] |
Roadway alignment appraisal: | Equal to present desirable criteria [8] |
Channel protection: | Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and rush restrict the channel. [5] |
Scour condition: | Bridge is scour critical; bridge foundations determined to be unstable. [3] |
Sufficiency rating: | 62.4 |
Recommended work: | Widening of existing bridge or other major structure without deck rehabilitation or replacement [33] |
Estimated cost of work: | $461,000 |
Previous Inspections
Date | Condition | Deck | Superstructure | Substructure | ADT | Suff. Rating |
---|
May 2018 | Fair | Satisfactory | Satisfactory | Fair | 2800 | 62.4 |
May 2016 | Fair | Good | Good | Fair | 2600 | 66.6 |
May 2014 | Fair | Good | Good | Fair | 3400 | 61.6 |
May 2012 | Fair | Good | Good | Fair | 3400 | 61.6 |
August 2011 | Fair | Good | Good | Fair | 3400 | 61.6 |
May 2010 | Fair | Good | Good | Fair | 2600 | 66.6 |
May 2008 | Fair | Good | Good | Fair | 2600 | 66.6 |
May 2007 | Fair | Satisfactory | Good | Fair | 2500 | 67.3 |
May 2005 | Poor | Good | Good | Poor | 2500 | 52.3 |
May 2004 | Poor | Good | Good | Poor | 3100 | 47.1 |
February 2003 | Poor | Good | Good | Poor | 3000 | 47.2 |
May 2000 | Good | Very Good | Very Good | Good | 2900 | 76.2 |
May 1998 | Good | Very Good | Very Good | Very Good | 2900 | 76.2 |
May 1996 | Good | Very Good | Very Good | Very Good | 2100 | 80.8 |
May 1994 | Good | Very Good | Very Good | Very Good | 1800 | 80.0 |
May 1992 | Good | Very Good | Very Good | Very Good | 1800 | 68.5 |
May 1990 | Fair | Very Good | Very Good | Satisfactory | 1300 | 66.0 |
Element Data
Source: National Bridge Elements dataset, 2019 edition. This feature is experimental.
Element | Units | Quantity | 1-Good | 2-Fair | 3-Poor | 4-Serious |
---|
Superstructure |
Timber Girder/Beam | linear ft. | 957 | 857 | 90 | 10 | 0 |
Deck |
Reinforced Concrete Deck | sq. ft. | 2,581 | 2,326 | 131 | 124 | 0 |
Wearing Surfaces | sq. ft. | 2,340 | 2,340 | 0 | 0 | 0 |
Substructure |
Steel Abutment | linear ft. | 68 | 0 | 60 | 8 | 0 |
Steel Pile | each | 31 | 5 | 19 | 7 | 0 |
Steel Pier Cap | linear ft. | 46 | 0 | 28 | 18 | 0 |
Timber Pier Cap | linear ft. | 68 | 27 | 27 | 14 | 0 |
Joints |
Other Joint | linear ft. | 103 | 103 | 0 | 0 | 0 |
Bridge Rail |
Steel or Aluminum Bridge Rail | linear ft. | 174 | 174 | 0 | 0 | 0 |
Steel Protective Coating | sq. ft. | 419 | 419 | 0 | 0 | 0 |