Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:FOMBELL RD over CAMP RUN
Structure number:000000000003653
Old structure number:041009006006160 (from 1992 edition)
Location:INTER W/ TWP RD 660
Purpose:Carries highway over waterway
Route classification:Minor Collector (Rural) [08]
Length of largest span:49.9 ft. [15.2 m]
Total length:54.1 ft. [16.5 m]
Roadway width between curbs:25.6 ft. [7.8 m]
Deck width edge-to-edge:34.5 ft. [10.5 m]
Skew angle:30°
Owner:State Highway Agency [01]
Year built:1961
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Main span material:Prestressed concrete [5]
Main span design:Box beam or girders - Multiple [05]
Deck type:Other [9]
Wearing surface:Bituminous [6]

Latest Available Inspection: April 2018

Good/Fair/Poor Condition:Poor
Status:Posted for load [P]
Average daily traffic:474 [as of 2018]
Truck traffic:5% of total traffic
Deck condition:Poor [4 out of 9]
Superstructure condition:Serious [3 out of 9]
Substructure condition:Fair [5 out of 9]
Structural appraisal:Basically intolerable requiring high priority of corrrective action [3]
Deck geometry appraisal:Meets minimum tolerable limits to be left in place as is [4]
Water adequacy appraisal:Better than present minimum criteria [7]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Sufficiency rating:25.0
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$107,000

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
April 2018PoorPoorSeriousFair47425.0
April 2016PoorPoorSeriousFair49523.0
April 2015PoorPoorSeriousFair50423.0
April 2014PoorPoorSeriousFair50423.7
April 2012PoorPoorSeriousSatisfactory40438.1
April 2010PoorPoorSeriousSatisfactory40649.6
April 2008PoorPoorSeriousSatisfactory40649.6
April 2006FairFairFairSatisfactory44582.7
March 2004FairFairFairSatisfactory44084.8
March 2002FairFairFairSatisfactory83785.5
March 2000FairFairFairSatisfactory81384.6
March 1998FairFairFairSatisfactory79782.6
March 1996FairFairFairSatisfactory75182.6
March 1994FairFairFairFair73284.6
March 1992Fair-FairSatisfactory79385.6

Element Data

Source: National Bridge Elements dataset, 2019 edition. This feature is experimental.
ElementUnitsQuantity1-Good2-Fair3-Poor4-Serious
Superstructure
Prestressed Concrete Closed Web/Box Girderlinear ft.57246052258
Deck
Reinforced Concrete Decksq. ft.1,7761,6878900
Wearing Surfacessq. ft.1,6961,6118500
Substructure
Reinforced Concrete Abutmentlinear ft.118109810
Bearings
Enclosed/Concealed Bearingeach2222000
Bridge Rail
Steel or Aluminum Bridge Raillinear ft.106000106
Steel Protective Coatingsq. ft.10,75310,753000