SCHAEFFER ROAD over WILLOW CREEK

This bridge is no longer in the current National Bridge Inventory database, and has likely been demolished or abandoned.

Map

Coordinates:
+40.45110, -75.87740
40°27'04" N, 75°52'39" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:SCHAEFFER ROAD over WILLOW CREEK
Structure number:000000000005393
Old structure number:067222075795310 (from 1992 edition)
Location:BLANDON BRIDGE
Purpose:Carries highway over waterway
Route classification:Local (Rural) [09]
Length of largest span:33.1 ft. [10.1 m]
Total length:67.9 ft. [20.7 m]
Roadway width between curbs:18.0 ft. [5.5 m]
Deck width edge-to-edge:21.0 ft. [6.4 m]
Skew angle:48°
Owner:County Highway Agency [02]
Year built:1919
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Number of main spans:2
Main spans material:Concrete [1]
Main spans design:Tee beam [04]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

Latest Available Inspection: July 2016

Good/Fair/Poor Condition:Poor
Status:Posted for load [P]
Average daily traffic:3,084 [as of 2014]
Truck traffic:1% of total traffic
Deck condition:Serious [3 out of 9]
Superstructure condition:Serious [3 out of 9]
Substructure condition:Poor [4 out of 9]
Structural appraisal:Basically intolerable requiring high priority of corrrective action [3]
Deck geometry appraisal:Basically intolerable requiring high priority of replacement [2]
Water adequacy appraisal:Equal to present minimum criteria [6]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Bank and embankment protection is severely undermined. River control devices have severe damage. Large deposits of debris are in the channel. [4]
Scour condition:Bridge is scour critical; bridge foundations determined to be unstable. [3]
Sufficiency rating:17.0
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$606,000

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
July 2016PoorSeriousSeriousPoor308417.0
September 2014PoorSeriousSeriousPoor308416.8
September 2013PoorPoorPoorPoor347239.6
September 2012PoorSeriousPoorPoor347237.9
September 2011PoorPoorPoorPoor347239.6
September 2009PoorPoorPoorCritical37617.9
September 2008PoorFairPoorCritical37620.3
September 2005PoorFairPoorCritical37620.3
September 2004PoorFairFairCritical37620.3
September 2003PoorFairFairCritical37620.3
September 2002PoorFairFairCritical37619.1