Share:

BUCK ROAD over NESHAMINY CREEK

Map

Coordinates:
+40.21182, -74.94769
40°12'43" N, 74°56'52" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:BUCK ROAD over NESHAMINY CREEK
Structure number:000000000007049
Old structure number:090532015000000 (from 1992 edition)
Location:1.2MI.TO LR-09042 36H04
Purpose:Carries highway over waterway
Route classification:Other Principal Arterial (Urban) [14]
Length of largest span:65.0 ft. [19.8 m]
Total length:207.0 ft. [63.1 m]
Roadway width between curbs:30.2 ft. [9.2 m]
Deck width edge-to-edge:33.1 ft. [10.1 m]
Skew angle:30°
Owner:State Highway Agency [01]
Year built:1932
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:M 18 / H 20 [4]
Number of main spans:3
Main spans material:Concrete [1]
Main spans design:Arch - Deck [11]
Deck type:Not applicable [N]

Latest Available Inspection: July 2017

Good/Fair/Poor Condition:Fair
Status:Open, no restriction [A]
Average daily traffic:10,568 [as of 2016]
Truck traffic:1% of total traffic
Superstructure condition:Fair [5 out of 9]
Substructure condition:Fair [5 out of 9]
Structural appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck geometry appraisal:Meets minimum tolerable limits to be left in place as is [4]
Water adequacy appraisal:Equal to present desirable criteria [8]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and rush restrict the channel. [5]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Sufficiency rating:55.0
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$2,608,000

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
July 2017Fair-FairFair1056855.0
July 2015Fair-FairFair1075656.8
July 2013Fair-FairFair1005157.5
July 2011Fair-FairFair1053456.9
July 2009Fair-FairFair1153556.1
July 2007Fair-FairFair1148759.6
July 2005Fair-FairFair1139259.7
July 2003Fair-FairFair1210259.0
July 2001Fair-FairFair1249658.6
October 1998Fair-FairFair1299459.2
September 1996Fair-FairFair1322459.0
September 1994Fair-FairFair1328261.8
November 1992Fair-FairFair1311360.0
December 1990Fair-FairFair1246760.5

Element Data

Source: National Bridge Elements dataset, 2019 edition. This feature is experimental.
ElementUnitsQuantity1-Good2-Fair3-Poor4-Serious
Superstructure
Reinforced Concrete Archlinear ft.19550104410
Substructure
Reinforced Concrete Pier Walllinear ft.102765210
Reinforced Concrete Abutmentlinear ft.1401152050
Bridge Rail
Reinforced Concrete Bridge Raillinear ft.410004100