Share:

STONEWALL ROAD over MIDDLE SPRING CREEK

Map

Coordinates:
+40.08220, -77.54370
40°04'56" N, 77°32'37" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:STONEWALL ROAD over MIDDLE SPRING CREEK
Structure number:000000000014107
Old structure number:217215031132810 (from 1992 edition)
Location:1.3 N SHIP'BRG/MIDDLE SPR
Purpose:Carries highway over waterway
Route classification:Minor Collector (Rural) [08]
Length of largest span:37.1 ft. [11.3 m]
Total length:38.1 ft. [11.6 m]
Roadway width between curbs:13.5 ft. [4.1 m]
Deck width edge-to-edge:16.4 ft. [5.0 m]
Owner:County Highway Agency [02]
Year built:1925
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Main span material:Concrete [1]
Main span design:Tee beam [04]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

Latest Available Inspection: June 2017

Good/Fair/Poor Condition:Fair
Status:Open, no restriction [A]
Average daily traffic:732 [as of 2017]
Truck traffic:5% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Structural appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck geometry appraisal:Basically intolerable requiring high priority of replacement [2]
Water adequacy appraisal:Better than present minimum criteria [7]
Roadway alignment appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour conditions; field review indicates action is required. [4]
Sufficiency rating:68.5
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$55,000

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
June 2017FairGoodFairSatisfactory73268.5
June 2015FairGoodFairSatisfactory73265.5
June 2013FairGoodSatisfactorySatisfactory73276.6
June 2011FairGoodSatisfactorySatisfactory73276.6
June 2009FairGoodSatisfactorySatisfactory40076.9
June 2007FairGoodGoodSatisfactory40076.9
July 2005FairGoodGoodSatisfactory40076.9
July 2003FairGoodGoodSatisfactory40076.9
July 2001FairGoodSatisfactorySatisfactory20075.9
August 1999FairGoodSatisfactorySatisfactory20075.9
August 1997GoodGoodGoodGood20075.9
August 1995GoodGoodGoodGood20075.9