Share:

SR 3015 Guitner rd over CONOCOCHEAQUE CREEK

Map

Coordinates:
+39.84763, -77.73314
39°50'51" N, 77°43'59" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:SR 3015 Guitner rd over CONOCOCHEAQUE CREEK
Structure number:000000000017559
Old structure number:283015006003560 (from 1992 edition)
Location:1 MI SW OF MARION
Purpose:Carries highway over waterway
Route classification:Local (Rural) [09]
Length of largest span:39.0 ft. [11.9 m]
Total length:117.1 ft. [35.7 m]
Roadway width between curbs:25.9 ft. [7.9 m]
Deck width edge-to-edge:27.6 ft. [8.4 m]
Owner:State Highway Agency [01]
Year built:1954
Year reconstructed:2010
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:M 18 / H 20 [4]
Number of main spans:3
Main spans material:Prestressed concrete continuous [6]
Main spans design:Box Beam or girders - Single or Spread [06]
Deck type:Not applicable [N]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

Latest Available Inspection: May 2018

Good/Fair/Poor Condition:Fair
Status:Open, no restriction [A]
Average daily traffic:384 [as of 2018]
Truck traffic:3% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Structural appraisal:Equal to present minimum criteria [6]
Deck geometry appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Water adequacy appraisal:Better than present minimum criteria [7]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour conditions; field review indicates action is required. [4]
Sufficiency rating:94.3
Estimated cost of work:$1,361,000

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
May 2018FairGoodVery GoodSatisfactory38494.3
May 2016FairGoodVery GoodSatisfactory38694.3
May 2014GoodGoodExcellentGood38694.3
May 2012GoodVery GoodExcellentGood49394.2
May 2010GoodExcellentExcellentGood48094.2
March 2008PoorFairSeriousFair47248.9
April 2006PoorFairPoorFair54063.0
May 2004FairFairFairFair51778.2
May 2002FairFairFairFair50978.2
May 2000FairFairFairFair67078.1
April 1998FairFairFairFair65479.1
February 1996FairFairFairSatisfactory61477.3
November 1993PoorFairPoorFair58861.2
February 1992PoorFairPoorFair58861.2

Element Data

Source: National Bridge Elements dataset, 2019 edition. This feature is experimental.
ElementUnitsQuantity1-Good2-Fair3-Poor4-Serious
Superstructure
Prestressed Concrete Closed Web/Box Girderlinear ft.464464000
Deck
Reinforced Concrete Decksq. ft.3,17103,17100
Substructure
Reinforced Concrete Pier Walllinear ft.6767000
Reinforced Concrete Abutmentlinear ft.111111000
Bearings
Elastomeric Bearingeach4848000
Bridge Rail
Reinforced Concrete Bridge Raillinear ft.2962474900