Share:

SR 346-PA 346 over FOSTER BROOK

This bridge is no longer in the current National Bridge Inventory database, and has likely been demolished or abandoned.

Map

Coordinates:
+41.97176, -78.58407
41°58'18" N, 78°35'03" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:SR 346-PA 346 over FOSTER BROOK
Structure number:000000000025418
Old structure number:420346041016170 (from 1992 edition)
Location:3 MI E BRADFORD
Purpose:Carries highway over waterway
Route classification:Collector (Urban) [17]
Length of largest span:24.0 ft. [7.3 m]
Total length:50.9 ft. [15.5 m]
Roadway width between curbs:33.5 ft. [10.2 m]
Deck width edge-to-edge:37.1 ft. [11.3 m]
Skew angle:45°
Owner:State Highway Agency [01]
Year built:1924
Year reconstructed:1952
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:M 13.5 / H 15 [2]
Number of main spans:2
Main spans material:Concrete [1]
Main spans design:Tee beam [04]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

Latest Available Inspection: October 2015

Good/Fair/Poor Condition:Poor
Status:Open, no restriction [A]
Average daily traffic:3,545 [as of 2015]
Truck traffic:2% of total traffic
Deck condition:Poor [4 out of 9]
Superstructure condition:Poor [4 out of 9]
Substructure condition:Poor [4 out of 9]
Structural appraisal:Meets minimum tolerable limits to be left in place as is [4]
Deck geometry appraisal:Meets minimum tolerable limits to be left in place as is [4]
Water adequacy appraisal:Equal to present desirable criteria [8]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Sufficiency rating:61.9
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$1,000

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
October 2015PoorPoorPoorPoor354561.9
October 2013PoorPoorPoorPoor362761.7
October 2011PoorPoorPoorPoor369661.6
October 2009PoorPoorPoorPoor416360.8
November 2007PoorPoorPoorPoor416360.8
June 2006PoorPoorPoorPoor413856.4
June 2004PoorPoorPoorPoor351856.3
August 2002PoorPoorPoorPoor343857.5
October 2000PoorPoorPoorPoor574953.1
August 1999PoorPoorPoorPoor563653.4
November 1998PoorPoorPoorPoor552553.6
November 1996PoorPoorPoorPoor533153.9
November 1994PoorPoorPoorPoor419956.3
June 1992PoorPoorPoorPoor414956.5
July 1990PoorPoorPoorPoor399956.8