Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:PR 1 over CONCEPCION STREET
Structure number:009111
Location:FIRST BGE E INT PR2 & PR1
Purpose:Carries highway over highway
Route classification:Principal Arterial - Other Freeways or Expressways (Urban) [12]
Length of largest span:37.1 ft. [11.3 m]
Total length:134.5 ft. [41.0 m]
Roadway width between curbs:116.1 ft. [35.4 m]
Deck width edge-to-edge:131.2 ft. [40.0 m]
Vertical clearance below bridge:13.1 ft. [4.0 m]
Owner:State Highway Agency [01]
Year built:1971
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:4
Main spans material:Concrete continuous [2]
Main spans design:Slab [01]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

Latest Available Inspection: July 2017

Good/Fair/Poor Condition:Fair
Status:Posted for load [P]
Average daily traffic:43,852 [as of 2007]
Truck traffic:4% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Fair [5 out of 9]
Structural appraisal:Meets minimum tolerable limits to be left in place as is [4]
Deck geometry appraisal:Equal to present minimum criteria [6]
Underclearances appraisal:Meets minimum tolerable limits to be left in place as is [4]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge not over waterway. [N]
Sufficiency rating:55.1
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$408,000

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
July 2017FairSatisfactorySatisfactoryFair4385255.1
July 2015FairSatisfactorySatisfactoryFair4385256.0
July 2014FairSatisfactorySatisfactoryFair8420049.1
July 2013FairSatisfactorySatisfactoryFair8420049.1
August 2012FairSatisfactorySatisfactoryFair8420042.4
September 2010FairFairSatisfactorySatisfactory8420059.6
September 2008FairFairSatisfactorySatisfactory8420059.6
September 2006FairSatisfactoryFairFair8030072.5
August 2004FairSatisfactoryFairSatisfactory8030072.5
January 2002FairSatisfactorySatisfactorySatisfactory6620086.2
October 1999FairSatisfactorySatisfactorySatisfactory6830086.0
August 1997FairSatisfactorySatisfactorySatisfactory6570084.3
March 1996FairSatisfactorySatisfactorySatisfactory11730081.4
June 1993FairSatisfactorySatisfactorySatisfactory10140081.6
July 1991FairSatisfactorySatisfactoryFair9570069.8

Element Data

Source: National Bridge Elements dataset, 2019 edition. This feature is experimental.
ElementUnitsQuantity1-Good2-Fair3-Poor4-Serious
Substructure
Reinforced Concrete Columneach33191400
Reinforced Concrete Abutmentlinear ft.26217062300
Reinforced Concrete Pier Caplinear ft.371230108330
Bridge Rail
Reinforced Concrete Bridge Raillinear ft.53836117700
Deck
Reinforced Concrete Slabsq. ft.17,6427,9006,3513,3910
Wearing Surfacessq. ft.15,62914,682868610