Share:

PR 115 over UNKNOWN CREEK

Map

Coordinates:
+18.28333, -67.16833
18°16'60" N, 67°10'06" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:PR 115 over UNKNOWN CREEK
Structure number:014861
Location:3 KMS WEST OF A¥ASCO
Purpose:Carries highway over waterway
Route classification:Minor Arterial (Rural) [06]
Length of largest span:3.0 ft. [0.9 m]
Total length:23.6 ft. [7.2 m]
Roadway width between curbs:20.3 ft. [6.2 m]
Deck width edge-to-edge:22.3 ft. [6.8 m]
Owner:State Highway Agency [01]
Year built:1976
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:6
Main spans material:Steel [3]
Main spans design:Culvert [19]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

Latest Available Inspection: 2031

Good/Fair/Poor Condition:Poor
Average daily traffic:880 [as of 200]
Structural appraisal:Basically intolerable requiring high priority of replacement [2]
Deck geometry appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Underclearances appraisal:Basically intolerable requiring high priority of replacement [2]
Water adequacy appraisal:Meets minimum tolerable limits to be left in place as is [4]
Roadway alignment appraisal:Basically intolerable requiring high priority of replacement [2]
Culvert condition:Large spalls, heavy scaling, wide cracks, considerable efflorescence or opened construction joint permitting loss of backfill. Considerable settlement or misalignment. Considerable scouring or erosion at curtain walls, wingwalls or pipes. Metal culverts have significant distortion and deflection throughout, extensive corrosion or deep pitting. [4]
Sufficiency rating:441.0
Estimated cost of work:$700,041,000

Previous Inspections

DateConditionCulvert ConditionADTSuff. Rating
2031Poor4 out of 10880441.0
March 2017Fair5 out of 10880044.1
March 2015Fair5 out of 10880050.4
March 2013Fair5 out of 10880050.4
March 2011Fair5 out of 10880055.2
March 2009Fair5 out of 10880055.2
May 2007Fair5 out of 10800054.9
September 2005Fair5 out of 10800054.9
October 2003Fair5 out of 10800054.9
September 2001Fair5 out of 10800055.9
August 1999Fair5 out of 101000053.8
August 1997Fair5 out of 10780056.1
February 1996Fair5 out of 10480059.2
May 1993Fair5 out of 10460058.3
September 1991Fair5 out of 10460058.3

Element Data

Source: National Bridge Elements dataset, 2019 edition. This feature is experimental.
ElementUnitsQuantity1-Good2-Fair3-Poor4-Serious
Culvert
Steel Culvertlinear ft.3300330
Bridge Rail
Steel or Aluminum Bridge Raillinear ft.46023230