Share:

PR 102 over LAGUNA CHANNEL

Map

Coordinates:
+18.11667, -67.18333
18°07'00" N, 67°10'60" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:PR 102 over LAGUNA CHANNEL
Structure number:027401
Location:5 KM N W OF CABO ROJO
Purpose:Carries highway and pedestrian walkway over waterway
Route classification:Major Collector (Rural) [07]
Length of largest span:46.6 ft. [14.2 m]
Total length:50.2 ft. [15.3 m]
Roadway width between curbs:24.0 ft. [7.3 m]
Deck width edge-to-edge:37.7 ft. [11.5 m]
Skew angle:22°
Owner:State Highway Agency [01]
Year built:2003
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Main span material:Prestressed concrete [5]
Main span design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Precast Panels [2]
Wearing surface:Bituminous [6]

Latest Available Inspection: December 2018

Good/Fair/Poor Condition:Fair
Status:Posted for load [P]
Average daily traffic:5,900 [as of 2005]
Truck traffic:2% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Structural appraisal:Equal to present minimum criteria [6]
Deck geometry appraisal:Basically intolerable requiring high priority of replacement [2]
Water adequacy appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Sufficiency rating:69.5
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$336,000

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
December 2018FairSatisfactoryGoodGood590069.5
December 2016FairSatisfactoryGoodGood590069.5
November 2014FairSatisfactoryGoodGood590070.2
November 2012FairSatisfactoryGoodGood590065.2
December 2010FairSatisfactoryGoodGood590069.5
November 2008GoodGoodGoodGood590069.5
June 2007GoodGoodGoodGood590069.5
September 2005GoodVery GoodVery GoodVery Good590075.9
December 2003PoorPoorPoorPoor590048.0

Element Data

Source: National Bridge Elements dataset, 2019 edition. This feature is experimental.
ElementUnitsQuantity1-Good2-Fair3-Poor4-Serious
Superstructure
Prestressed Concrete Girder/Beamlinear ft.351351000
Deck
Reinforced Concrete Decksq. ft.1,20685135500
Substructure
Reinforced Concrete Abutmentlinear ft.8275700
Joints
Compression Jointlinear ft.49391000
Bearings
Elastomeric Bearingeach1412200
Bridge Rail
Reinforced Concrete Bridge Raillinear ft.102102000