MARTY RD over NORTH FORK MOREAU RV
Map
Coordinates:
+45.25616, -103.1513345°15'22" N, 103°09'05" W
Facts
Source: National Bridge Inventory. Information not verified; use at your own risk.
Name: | MARTY RD over NORTH FORK MOREAU RV |
Structure number: | 000000032446480 |
Location: | 19.6E 1.0S OF REDIG |
Purpose: | Carries highway over waterway |
Route classification: | Local (Rural) [09] |
Length of largest span: | 79.1 ft. [24.1 m] |
Total length: | 79.1 ft. [24.1 m] |
Roadway width between curbs: | 20.0 ft. [6.1 m] |
Deck width edge-to-edge: | 20.0 ft. [6.1 m] |
Owner: | County Highway Agency [02] |
Year built: | 1986 |
Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
Design load: | MS 18 / HS 20 [5] |
Main span material: | Steel [3] |
Main span design: | Stringer/Multi-beam or girder [02] |
Deck type: | Wood or Timber [8] |
Wearing surface: | Wood or Timber [7] |
Latest Available Inspection: May 2018
Good/Fair/Poor Condition: | Fair |
Status: | Posted for load [P] |
Average daily traffic: | 31 [as of 2016] |
Truck traffic: | 2% of total traffic |
Deck condition: | Good [7 out of 9] |
Superstructure condition: | Fair [5 out of 9] |
Substructure condition: | Satisfactory [6 out of 9] |
Structural appraisal: | Meets minimum tolerable limits to be left in place as is [4] |
Deck geometry appraisal: | Somewhat better than minimum adequacy to tolerate being left in place as is [5] |
Water adequacy appraisal: | Equal to present desirable criteria [8] |
Roadway alignment appraisal: | Somewhat better than minimum adequacy to tolerate being left in place as is [5] |
Channel protection: | Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7] |
Scour condition: | Bridge with "unknown" foundation that has not been evaluated for scour. [U] |
Sufficiency rating: | 56.8 |
Recommended work: | Other structural work, including hydraulic replacements. [38] |
Estimated cost of work: | $30,000 |
Previous Inspections
Date | Condition | Deck | Superstructure | Substructure | ADT | Suff. Rating |
---|
May 2018 | Fair | Good | Fair | Satisfactory | 31 | 56.8 |
June 2016 | Fair | Satisfactory | Fair | Satisfactory | 31 | 56.8 |
June 2014 | Fair | Satisfactory | Satisfactory | Fair | 31 | 56.8 |
June 2012 | Fair | Satisfactory | Satisfactory | Fair | 31 | 70.3 |
June 2010 | Fair | Satisfactory | Satisfactory | Fair | 31 | 70.3 |
October 2008 | Fair | Satisfactory | Satisfactory | Fair | 31 | 70.3 |
September 2006 | Fair | Good | Satisfactory | Very Good | 31 | 87.7 |
July 2004 | Fair | Good | Satisfactory | Very Good | 31 | 87.7 |
May 2002 | Fair | Good | Satisfactory | Very Good | 31 | 87.7 |
May 2000 | Fair | Good | Satisfactory | Very Good | 31 | 87.7 |
June 1998 | Fair | Good | Satisfactory | Very Good | 31 | 87.7 |
August 1996 | Good | Good | Very Good | Good | 31 | 87.7 |
October 1994 | Good | Good | Very Good | Good | 31 | 94.2 |
October 1992 | Good | Very Good | Very Good | Good | 31 | 86.2 |
September 1990 | Good | Very Good | Very Good | Good | 31 | 86.2 |