Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:FAP 85 over ZOLLICOFFER CREEK
Structure number:67SR0850003
Location:1.5 MI W OF LIVINGSTON
Purpose:Carries highway over waterway
Route classification:Minor Arterial (Rural) [06]
Length of largest span:9.8 ft. [3.0 m]
Total length:23.0 ft. [7.0 m]
Roadway width between curbs:30.2 ft. [9.2 m]
Deck width edge-to-edge:33.5 ft. [10.2 m]
Skew angle:30°
Owner:State Highway Agency [01]
Year built:1931
Historic significance:Historical significance is not determinable at this time [4]
Design load:M 13.5 / H 15 [2]
Number of main spans:2
Main spans material:Concrete continuous [2]
Main spans design:Culvert [19]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

Latest Available Inspection: November 2018

Good/Fair/Poor Condition:Good
Status:Open, no restriction [A]
Average daily traffic:4,040 [as of 2017]
Truck traffic:6% of total traffic
Structural appraisal:Equal to present minimum criteria [6]
Deck geometry appraisal:Meets minimum tolerable limits to be left in place as is [4]
Water adequacy appraisal:Equal to present desirable criteria [8]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Culvert condition:Shrinkage cracks, light scaling and insignificant spalling which does not expose reinforcing steel. Insignificant damage caused by drift with no misalignment and not requiring corrective action. Some minor scouring has occured near curtain walls, wingwalls or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting. [7]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Sufficiency rating:57.6
Recommended work:Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Estimated cost of work:$98,000

Previous Inspections

DateConditionCulvert ConditionADTSuff. Rating
November 2018Good7 out of 10404057.6
November 2016Good7 out of 10388057.6
July 2015Good7 out of 10388057.6
July 2013Good7 out of 10400060.2
July 2011Good7 out of 10380057.2
July 2009Good7 out of 10386057.2
July 2007Good7 out of 10393057.2
June 2005Good7 out of 10403057.2
August 2003Good7 out of 10400057.2
June 2001Good7 out of 10386057.2
July 1999Good7 out of 10405057.2
January 1998Good7 out of 10383057.2
January 1996Good7 out of 10349059.5
January 1994Good7 out of 10340059.5
September 1992Good7 out of 10318068.4