FAP 14 297767K over IC RR & NONCONNAH CREEK
Map
Coordinates:
+35.07442, -90.0579735°04'28" N, 90°03'29" W
Facts
Source: National Bridge Inventory. Information not verified; use at your own risk.
Name: | FAP 14 297767K over IC RR & NONCONNAH CREEK |
Structure number: | 79SR0140006 |
Location: | 0.3 MI S OF I55 JCT |
Purpose: | Carries highway and pedestrian walkway over railroad and waterway |
Route classification: | Other Principal Arterial (Urban) [14] |
Length of largest span: | 141.7 ft. [43.2 m] |
Total length: | 787.4 ft. [240.0 m] |
Roadway width between curbs: | 40.0 ft. [12.2 m] |
Deck width edge-to-edge: | 52.5 ft. [16.0 m] |
Vertical clearance above deck: | 13.5 ft. [4.1 m] |
Vertical clearance below bridge: | 19.7 ft. [6.0 m] |
Owner: | State Highway Agency [01] |
Year built: | 1929 |
Historic significance: | Historical significance is not determinable at this time [4] |
Design load: | MS 18 / HS 20 [5] |
Main span material: | Steel [3] |
Main span design: | Truss - Thru [10] |
Deck type: | Concrete Cast-in-Place [1] |
Wearing surface: | Bituminous [6] |
Latest Available Inspection: November 2018
Good/Fair/Poor Condition: | Poor |
Status: | Open, no restriction [A] |
Average daily traffic: | 33,930 [as of 2017] |
Truck traffic: | 9% of total traffic |
Deck condition: | Satisfactory [6 out of 9] |
Superstructure condition: | Fair [5 out of 9] |
Substructure condition: | Serious [3 out of 9] |
Structural appraisal: | Basically intolerable requiring high priority of corrrective action [3] |
Deck geometry appraisal: | Basically intolerable requiring high priority of replacement [2] |
Underclearances appraisal: | Somewhat better than minimum adequacy to tolerate being left in place as is [5] |
Water adequacy appraisal: | Somewhat better than minimum adequacy to tolerate being left in place as is [5] |
Roadway alignment appraisal: | Equal to present desirable criteria [8] |
Channel protection: | Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6] |
Scour condition: | Bridge is scour critical; field review indicates that extensive scour has occurred at bridge foundations. [2] |
Sufficiency rating: | 12.6 |
Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
Estimated cost of work: | $15,836,000 |
Previous Inspections
Date | Condition | Deck | Superstructure | Substructure | ADT | Suff. Rating |
---|
November 2018 | Poor | Satisfactory | Fair | Serious | 33930 | 12.6 |
December 2016 | Poor | Satisfactory | Fair | Poor | 35750 | 37.3 |
June 2015 | Poor | Satisfactory | Poor | Fair | 35750 | 37.3 |
June 2013 | Poor | Satisfactory | Poor | Fair | 32650 | 37.8 |
July 2011 | Poor | Satisfactory | Poor | Fair | 40480 | 36.6 |
July 2009 | Fair | Satisfactory | Fair | Fair | 40930 | 48.8 |
July 2007 | Fair | Satisfactory | Fair | Fair | 41780 | 48.7 |
July 2005 | Fair | Satisfactory | Satisfactory | Fair | 44730 | 46.4 |
July 2003 | Poor | Satisfactory | Satisfactory | Poor | 45140 | 36.0 |
August 2001 | Fair | Satisfactory | Satisfactory | Satisfactory | 48870 | 66.2 |
September 1999 | Fair | Satisfactory | Satisfactory | Satisfactory | 51870 | 66.0 |
February 1998 | Fair | Satisfactory | Satisfactory | Satisfactory | 49700 | 71.0 |
October 1995 | Fair | Satisfactory | Satisfactory | Satisfactory | 47150 | 80.2 |
August 1993 | Poor | Fair | Fair | Poor | 40760 | 50.9 |
December 1991 | Poor | Fair | Fair | Poor | 35550 | 51.6 |
Element Data
Source: National Bridge Elements dataset, 2019 edition. This feature is experimental.
Element | Units | Quantity | 1-Good | 2-Fair | 3-Poor | 4-Serious |
---|
Superstructure |
Steel Girder/Beam | linear ft. | 994 | 994 | 0 | 0 | 0 |
Reinforced Concrete Girder/Beam | linear ft. | 5,161 | 5,158 | 3 | 0 | 0 |
Deck |
Reinforced Concrete Deck | sq. ft. | 44,707 | 44,194 | 513 | 0 | 0 |
Wearing Surfaces | sq. ft. | 32,271 | 30,731 | 1,535 | 5 | 0 |
Superstructure |
Steel Truss | linear ft. | 284 | 284 | 0 | 0 | 0 |
Steel Floor Beam | linear ft. | 398 | 398 | 0 | 0 | 0 |
Substructure |
Reinforced Concrete Column | each | 35 | 0 | 35 | 0 | 0 |
Reinforced Concrete Abutment | linear ft. | 114 | 112 | 2 | 0 | 0 |
Reinforced Concrete Pier Cap | linear ft. | 909 | 891 | 10 | 8 | 0 |
Joints |
Strip Seal Joint | linear ft. | 57 | 57 | 0 | 0 | 0 |
Bearings |
Movable Bearing | each | 2 | 2 | 0 | 0 | 0 |
Fixed Bearing | each | 2 | 2 | 0 | 0 | 0 |
Bridge Rail |
Reinforced Concrete Bridge Rail | linear ft. | 1,574 | 1,574 | 0 | 0 | 0 |