Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:NFA 1159 (SA 9318) over HICKORY VALLEY BRANCH
Structure number:93S42510005
Location:5MI NORTH OF VAN BUREN CO
Purpose:Carries highway over waterway
Route classification:Minor Collector (Rural) [08]
Length of largest span:15.1 ft. [4.6 m]
Total length:90.9 ft. [27.7 m]
Roadway width between curbs:22.0 ft. [6.7 m]
Deck width edge-to-edge:26.2 ft. [8.0 m]
Skew angle:45°
Owner:County Highway Agency [02]
Year built:1952
Historic significance:Historical significance is not determinable at this time [4]
Design load:MS 18+Mod / HS 20+Mod [6]
Number of main spans:4
Main spans material:Concrete continuous [2]
Main spans design:Culvert [19]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

Latest Available Inspection: February 2018

Good/Fair/Poor Condition:Fair
Status:Open, no restriction [A]
Average daily traffic:500 [as of 2018]
Truck traffic:8% of total traffic
Structural appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck geometry appraisal:Meets minimum tolerable limits to be left in place as is [4]
Water adequacy appraisal:Equal to present minimum criteria [6]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and rush restrict the channel. [5]
Culvert condition:Moderate to major deterioration or disintegration, extensive cracking and leaching or spalls on concrete or masonry walls and slabs. Minor settlement or misalignment. Noticeable scouring or erosion at curtain walls, wingwalls or pipes. Metal culverts have significant distortion and deflection in one section, significant corrosion or deep pitting. [5]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Sufficiency rating:69.4
Recommended work:Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Estimated cost of work:$214,000

Previous Inspections

DateConditionCulvert ConditionADTSuff. Rating
February 2018Fair5 out of 1050069.4
February 2016Fair5 out of 1050062.7
February 2014Fair5 out of 1050062.7
February 2012Fair5 out of 1050062.7
February 2010Fair5 out of 1050062.7
February 2008Fair5 out of 1050062.7
March 2006Fair5 out of 1052062.7
March 2004Poor4 out of 1057049.5
March 2002Fair5 out of 1048062.7
February 2000Fair6 out of 1047073.8
February 1998Fair6 out of 1048073.8
October 1995Fair6 out of 1044072.3
September 1993Fair6 out of 1054072.2
October 1991Fair6 out of 1034079.8