Share:

IH 30 EB over SABINE CREEK RELIEF

Map

Coordinates:
+32.97606, -96.31369
32°58'34" N, 96°18'49" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:IH 30 EB over SABINE CREEK RELIEF
Structure number:181990000912133
Location:0.56 MI E OF FM 35
Purpose:Carries highway over relief for waterway
Route classification:Principal Arterial - Interstate (Rural) [01]
Length of largest span:29.9 ft. [9.1 m]
Total length:121.1 ft. [36.9 m]
Roadway width between curbs:38.1 ft. [11.6 m]
Deck width edge-to-edge:40.0 ft. [12.2 m]
Owner:State Highway Agency [01]
Year built:1956
Year reconstructed:1987
Historic significance:Bridge is possibly eligible for the National Register of Historic Places [3]
Design load:MS 18 / HS 20 [5]
Number of main spans:4
Main spans material:Concrete [1]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

Latest Available Inspection: September 2017

Good/Fair/Poor Condition:Fair
Status:Open, no restriction [A]
Average daily traffic:25,250 [as of 2013]
Truck traffic:13% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Structural appraisal:Equal to present minimum criteria [6]
Deck geometry appraisal:Equal to present minimum criteria [6]
Water adequacy appraisal:Superior to present desirable criteria [9]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Sufficiency rating:95.6

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
September 2017FairGoodSatisfactorySatisfactory2525095.6
September 2015FairGoodSatisfactorySatisfactory2525095.6
September 2013FairGoodSatisfactorySatisfactory2141096.0
November 2011FairGoodSatisfactorySatisfactory2426094.7
February 2010FairGoodSatisfactorySatisfactory2166096.0
February 2008FairGoodSatisfactorySatisfactory2158096.0
March 2006FairGoodSatisfactorySatisfactory1945096.2
February 2004FairSatisfactorySatisfactorySatisfactory1922096.2
February 2002FairSatisfactorySatisfactorySatisfactory1741096.4
March 2000FairGoodSatisfactorySatisfactory1538096.6
March 1998FairGoodSatisfactorySatisfactory1406096.7
February 1996FairGoodSatisfactorySatisfactory1406096.7
February 1994GoodVery GoodGoodGood1319097.0
February 1992GoodVery GoodGoodGood1285097.0
October 1989GoodGoodGoodGood1384097.0

Element Data

Source: National Bridge Elements dataset, 2019 edition. This feature is experimental.
ElementUnitsQuantity1-Good2-Fair3-Poor4-Serious
Superstructure
Reinforced Concrete Girder/Beamlinear ft.1,6801,51915920
Substructure
Reinforced Concrete Columneach93600
Reinforced Concrete Abutmentlinear ft.80443600
Reinforced Concrete Pier Caplinear ft.114991500
Bridge Rail
Reinforced Concrete Bridge Raillinear ft.268264310
Other Material Bridge Raillinear ft.400400000