Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:ROUTE 0060 over S FORK_CHALK MINE_RUN
Structure number:000000000020067
Location:0039ECL BU VI0340AMHER CO
Purpose:Carries highway over waterway
Route classification:Minor Arterial (Urban) [16]
Length of largest span:23.0 ft. [7.0 m]
Total length:23.0 ft. [7.0 m]
Roadway width between curbs:22.6 ft. [6.9 m]
Deck width edge-to-edge:25.6 ft. [7.8 m]
Owner:City or Municipal Highway Agency [04]
Year built:1932
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:M 13.5 / H 15 [2]
Main span material:Concrete [1]
Main span design:Slab [01]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

Latest Available Inspection: February 2017

Good/Fair/Poor Condition:Fair
Status:Open, no restriction [A]
Average daily traffic:4,839 [as of 2014]
Truck traffic:7% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Good [7 out of 9]
Structural appraisal:Equal to present minimum criteria [6]
Deck geometry appraisal:Basically intolerable requiring high priority of replacement [2]
Water adequacy appraisal:Better than present minimum criteria [7]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Countermeasures have been installed to mitigate an existing problem with scour. [7]
Sufficiency rating:58.9
Recommended work:Widening of existing bridge with deck rehabilitation or replacement. [34]
Estimated cost of work:$74,000

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
February 2017FairSatisfactorySatisfactoryGood483958.9
February 2015FairSatisfactorySatisfactoryGood483966.5
February 2013FairSatisfactorySatisfactoryGood619962.2
February 2011FairSatisfactorySatisfactoryGood619962.2
February 2009GoodGoodGoodGood619962.2
March 2007GoodGoodGoodGood619963.2
May 2005GoodGoodGoodGood619973.9
April 2003GoodGoodVery GoodGood619973.9
April 2001GoodGoodVery GoodGood619974.9
April 1999GoodGoodVery GoodVery Good619974.9
July 1997GoodVery GoodVery GoodGood619974.9
August 1995GoodGoodVery GoodVery Good86076.9
June 1994GoodGoodVery GoodVery Good86076.9
May 1993GoodGoodVery GoodVery Good86076.9
June 1989GoodGoodVery GoodGood86076.9