SECOND STREET over SOUTH RIVER
Map
Coordinates:
+38.07883, -78.8761438°04'44" N, 78°52'34" W
Facts
Source: National Bridge Inventory. Information not verified; use at your own risk.
Name: | SECOND STREET over SOUTH RIVER |
Structure number: | 000000000022292 |
Location: | 0002AUG AVE 0037ASH ST |
Purpose: | Carries highway over waterway |
Route classification: | Collector (Urban) [17] |
Length of largest span: | 59.1 ft. [18.0 m] |
Total length: | 117.1 ft. [35.7 m] |
Roadway width between curbs: | 34.1 ft. [10.4 m] |
Deck width edge-to-edge: | 45.9 ft. [14.0 m] |
Skew angle: | 20° |
Owner: | City or Municipal Highway Agency [04] |
Year built: | 1969 |
Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
Design load: | MS 18+Mod / HS 20+Mod [6] |
Number of main spans: | 2 |
Main spans material: | Steel [3] |
Main spans design: | Stringer/Multi-beam or girder [02] |
Deck type: | Concrete Cast-in-Place [1] |
Wearing surface: | Monolithic Concrete (concurrently placed with structural deck) [1] |
Latest Available Inspection: February 2017
Good/Fair/Poor Condition: | Fair |
Status: | Open, no restriction [A] |
Average daily traffic: | 3,671 [as of 2014] |
Deck condition: | Satisfactory [6 out of 9] |
Superstructure condition: | Fair [5 out of 9] |
Substructure condition: | Satisfactory [6 out of 9] |
Structural appraisal: | Somewhat better than minimum adequacy to tolerate being left in place as is [5] |
Deck geometry appraisal: | Basically intolerable requiring high priority of replacement [2] |
Water adequacy appraisal: | Equal to present desirable criteria [8] |
Roadway alignment appraisal: | Equal to present desirable criteria [8] |
Channel protection: | Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7] |
Scour condition: | Bridge foundations determined to be stable for the assessed or calculated scour condition. [8] |
Sufficiency rating: | 65.9 |
Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
Estimated cost of work: | $95,000 |
Previous Inspections
Date | Condition | Deck | Superstructure | Substructure | ADT | Suff. Rating |
---|
February 2017 | Fair | Satisfactory | Fair | Satisfactory | 3671 | 65.9 |
February 2015 | Fair | Satisfactory | Fair | Satisfactory | 3671 | 65.9 |
February 2013 | Fair | Satisfactory | Fair | Satisfactory | 5544 | 64.8 |
February 2011 | Fair | Satisfactory | Fair | Satisfactory | 5544 | 64.8 |
February 2009 | Fair | Satisfactory | Satisfactory | Satisfactory | 5544 | 76.3 |
March 2007 | Fair | Satisfactory | Satisfactory | Satisfactory | 5544 | 76.3 |
November 2005 | Good | Good | Good | Good | 5544 | 78.3 |
July 2003 | Good | Good | Good | Good | 5544 | 78.3 |
December 2001 | Good | Good | Good | Good | 5544 | 78.3 |
November 1999 | Good | Good | Good | Good | 5544 | 78.3 |
September 1997 | Good | Good | Good | Good | 5544 | 78.3 |
October 1995 | Good | Good | Good | Good | 2000 | 80.0 |
September 1994 | Good | Good | Good | Good | 2000 | 80.0 |
October 1991 | Good | Good | Good | Good | 2000 | 80.0 |
September 1989 | Good | Good | Good | Good | 2000 | 80.0 |