Share:

COWAN BLVD. over I-95

Map

Coordinates:
+38.30598, -77.50337
38°18'22" N, 77°30'12" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:COWAN BLVD. over I-95
Structure number:000000000026975
Location:1.2M RTE1-0.3M CDS PKWY
Purpose:Carries highway and pedestrian walkway over highway
Route classification:Minor Arterial (Urban) [16]
Length of largest span:131.9 ft. [40.2 m]
Total length:540.1 ft. [164.6 m]
Roadway width between curbs:57.1 ft. [17.4 m]
Deck width edge-to-edge:76.4 ft. [23.3 m]
Vertical clearance below bridge:16.4 ft. [5.0 m]
Owner:State Highway Agency [01]
Year built:2005
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18+Mod / HS 20+Mod [6]
Number of main spans:5
Main spans material:Steel continuous [4]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]

Latest Available Inspection: August 2017

Good/Fair/Poor Condition:Good
Status:Open, no restriction [A]
Average daily traffic:20,313 [as of 2014]
Truck traffic:1% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Structural appraisal:Better than present minimum criteria [7]
Deck geometry appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Underclearances appraisal:Superior to present desirable criteria [9]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Scour condition:Bridge not over waterway. [N]
Sufficiency rating:99.0

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
August 2017GoodGoodGoodGood2031399.0
August 2015GoodGoodGoodGood2031399.0
August 2013GoodGoodGoodGood100081.0
August 2011GoodGoodGoodGood100081.0
August 2009GoodGoodGoodGood100081.0
August 2007GoodVery GoodVery GoodVery Good-88.5
December 2005GoodExcellentExcellentExcellent-88.5