FOREST ROAD over PEDLAR RIVER
Map
Coordinates:
+37.74973, -79.2645537°44'59" N, 79°15'52" W
Facts
Source: National Bridge Inventory. Information not verified; use at your own risk.
Name: | FOREST ROAD over PEDLAR RIVER |
Structure number: | 080805000003192 |
Location: | BETWEEN SR 605 AND PARKWA |
Purpose: | Carries highway over waterway |
Route classification: | Local (Rural) [09] |
Length of largest span: | 66.6 ft. [20.3 m] |
Total length: | 68.9 ft. [21.0 m] |
Roadway width between curbs: | 13.1 ft. [4.0 m] |
Deck width edge-to-edge: | 15.7 ft. [4.8 m] |
Owner: | U.S. Forest Service [64] |
Year built: | 1927 |
Year reconstructed: | 1986 |
Historic significance: | Historical significance is not determinable at this time [4] |
Main span material: | Steel [3] |
Main span design: | Truss - Thru [10] |
Deck type: | Concrete Cast-in-Place [1] |
Wearing surface: | Latex Concrete or similar additive [3] |
Latest Available Inspection: August 2018
Good/Fair/Poor Condition: | Fair |
Status: | Posted for load [P] |
Average daily traffic: | 75 [as of 1998] |
Deck condition: | Satisfactory [6 out of 9] |
Superstructure condition: | Fair [5 out of 9] |
Substructure condition: | Satisfactory [6 out of 9] |
Structural appraisal: | Basically intolerable requiring high priority of corrrective action [3] |
Deck geometry appraisal: | Somewhat better than minimum adequacy to tolerate being left in place as is [5] |
Water adequacy appraisal: | Better than present minimum criteria [7] |
Roadway alignment appraisal: | Equal to present desirable criteria [8] |
Channel protection: | Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6] |
Pier/abutment protection: | Navigation protection not required [1] |
Scour condition: | Bridge foundations determined to be stable for assessed or calculated scour conditions; field review indicates action is required. [4] |
Sufficiency rating: | 30.8 |
Recommended work: | Other structural work, including hydraulic replacements. [38] |
Estimated cost of work: | $1,280,000 |
Previous Inspections
Date | Condition | Deck | Superstructure | Substructure | ADT | Suff. Rating |
---|
August 2018 | Fair | Satisfactory | Fair | Satisfactory | 75 | 30.8 |
August 2016 | Fair | Satisfactory | Fair | Satisfactory | 75 | 20.3 |
January 2015 | Fair | Satisfactory | Fair | Satisfactory | 75 | 20.3 |
August 2012 | Fair | Satisfactory | Fair | Satisfactory | 75 | 44.8 |
July 2010 | Fair | Satisfactory | Fair | Satisfactory | 75 | 44.8 |
July 2008 | Fair | Satisfactory | Fair | Satisfactory | 75 | 44.8 |
July 2004 | Fair | Satisfactory | Satisfactory | Satisfactory | 75 | 61.8 |
May 2002 | Good | Good | Good | Good | 75 | 52.7 |