SR 4 over CNTRY RD, KLINTS SLOUGH
Map
Coordinates:
+46.35837, -123.5644746°21'30" N, 123°33'52" W
Facts
Source: National Bridge Inventory. Information not verified; use at your own risk.
Name: | SR 4 over CNTRY RD, KLINTS SLOUGH |
Structure number: | 0002331C0000000 |
Location: | 14.7 E JCT SR 401 |
Purpose: | Carries highway and pedestrian walkway over highway and waterway |
Route classification: | Principal Arterial - Other (Rural) [02] |
Length of largest span: | 17.1 ft. [5.2 m] |
Total length: | 154.9 ft. [47.2 m] |
Roadway width between curbs: | 24.0 ft. [7.3 m] |
Deck width edge-to-edge: | 30.5 ft. [9.3 m] |
Vertical clearance below bridge: | 6.6 ft. [2.0 m] |
Owner: | State Highway Agency [01] |
Year built: | 1938 |
Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
Design load: | M 13.5 / H 15 [2] |
Number of main spans: | 9 |
Main spans material: | Wood or timber [7] |
Main spans design: | Stringer/Multi-beam or girder [02] |
Deck type: | Concrete Cast-in-Place [1] |
Wearing surface: | Monolithic Concrete (concurrently placed with structural deck) [1] |
Latest Available Inspection: August 2017
Good/Fair/Poor Condition: | Fair |
Status: | Open, no restriction [A] |
Average daily traffic: | 1,198 [as of 2016] |
Truck traffic: | 15% of total traffic |
Deck condition: | Satisfactory [6 out of 9] |
Superstructure condition: | Fair [5 out of 9] |
Substructure condition: | Fair [5 out of 9] |
Structural appraisal: | Somewhat better than minimum adequacy to tolerate being left in place as is [5] |
Deck geometry appraisal: | Meets minimum tolerable limits to be left in place as is [4] |
Underclearances appraisal: | Basically intolerable requiring high priority of corrrective action [3] |
Water adequacy appraisal: | Equal to present minimum criteria [6] |
Roadway alignment appraisal: | Equal to present desirable criteria [8] |
Channel protection: | Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8] |
Scour condition: | Bridge foundations determined to be stable for assessed or calculated scour condition. [5] |
Sufficiency rating: | 46.1 |
Recommended work: | Bridge rehabilitation because of general structure deterioration or inadequate strength. [35] |
Estimated cost of work: | $1,860,000 |
Previous Inspections
Date | Condition | Deck | Superstructure | Substructure | ADT | Suff. Rating |
---|
August 2017 | Fair | Satisfactory | Fair | Fair | 1198 | 46.1 |
August 2015 | Fair | Satisfactory | Fair | Fair | 1145 | 45.8 |
August 2013 | Fair | Good | Fair | Fair | 1145 | 45.8 |
August 2011 | Fair | Good | Fair | Fair | 1147 | 45.8 |
August 2009 | Fair | Good | Fair | Fair | 1641 | 45.8 |
August 2007 | Fair | Good | Fair | Fair | 1428 | 45.8 |
November 2005 | Fair | Good | Fair | Fair | 1428 | 48.8 |
September 2003 | Fair | Good | Fair | Fair | 1428 | 49.8 |
September 2002 | Fair | Good | Fair | Fair | 1428 | 49.8 |
July 2001 | Fair | Good | Satisfactory | Fair | 1428 | 47.8 |
August 2000 | Fair | Good | Satisfactory | Satisfactory | 1428 | 54.8 |
July 1997 | Fair | Good | Satisfactory | Satisfactory | 1765 | 55.9 |
November 1995 | Fair | Good | Satisfactory | Good | 1765 | 51.5 |
November 1993 | Fair | Good | Satisfactory | Satisfactory | 1675 | 55.5 |
July 1991 | Fair | Good | Satisfactory | Satisfactory | 1675 | 46.5 |
Element Data
Source: National Bridge Elements dataset, 2019 edition. This feature is experimental.
Element | Units | Quantity | 1-Good | 2-Fair | 3-Poor | 4-Serious |
---|
Superstructure |
Timber Girder/Beam | linear ft. | 2,325 | 2,319 | 0 | 6 | 0 |
Deck |
Reinforced Concrete Deck | sq. ft. | 3,720 | 3,694 | 1 | 0 | 25 |
Substructure |
Reinforced Concrete Abutment | linear ft. | 82 | 82 | 0 | 0 | 0 |
Timber Pile | each | 50 | 48 | 1 | 1 | 0 |
Timber Pier Cap | linear ft. | 320 | 320 | 0 | 0 | 0 |
Joints |
Pourable Joint | linear ft. | 48 | 0 | 48 | 0 | 0 |
Open Joint | linear ft. | 240 | 0 | 168 | 72 | 0 |
Bridge Rail |
Steel or Aluminum Bridge Rail | linear ft. | 310 | 310 | 0 | 0 | 0 |
Reinforced Concrete Bridge Rail | linear ft. | 310 | 310 | 0 | 0 | 0 |