Facts
Source: National Bridge Inventory. Information not verified; use at your own risk.
Name: | SR 25 over SPOKANE RIVER |
Structure number: | 0002658A0000000 |
Location: | 23.4 N JCT US 2 |
Purpose: | Carries highway and pedestrian walkway over waterway |
Route classification: | Minor Arterial (Rural) [06] |
Length of largest span: | 432.1 ft. [131.7 m] |
Total length: | 958.1 ft. [292.0 m] |
Roadway width between curbs: | 24.0 ft. [7.3 m] |
Deck width edge-to-edge: | 26.2 ft. [8.0 m] |
Vertical clearance above deck: | 14.8 ft. [4.5 m] |
Vertical clearance below bridge: | 32.8 ft. [10.0 m] |
Owner: | State Highway Agency [01] |
Year built: | 1941 |
Historic significance: | Bridge is on the National Register of Historic Places [1] |
Design load: | M 13.5 / H 15 [2] |
Number of main spans: | 3 |
Main spans material: | Steel [3] |
Main spans design: | Truss - Thru [10] |
Deck type: | Concrete Cast-in-Place [1] |
Wearing surface: | Bituminous [6] |
Latest Available Inspection: September 2018
Good/Fair/Poor Condition: | Fair |
Status: | Open, no restriction [A] |
Average daily traffic: | 727 [as of 2012] |
Truck traffic: | 23% of total traffic |
Deck condition: | Satisfactory [6 out of 9] |
Superstructure condition: | Satisfactory [6 out of 9] |
Substructure condition: | Satisfactory [6 out of 9] |
Structural appraisal: | Somewhat better than minimum adequacy to tolerate being left in place as is [5] |
Deck geometry appraisal: | Meets minimum tolerable limits to be left in place as is [4] |
Water adequacy appraisal: | Equal to present desirable criteria [8] |
Roadway alignment appraisal: | Equal to present desirable criteria [8] |
Channel protection: | Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8] |
Pier/abutment protection: | Navigation protection not required [1] |
Scour condition: | Bridge foundations determined to be stable for assessed or calculated scour condition. [5] |
Sufficiency rating: | 50.2 |
Recommended work: | Bridge rehabilitation because of general structure deterioration or inadequate strength. [35] |
Estimated cost of work: | $11,879,000 |
Previous Inspections
Date | Condition | Deck | Superstructure | Substructure | ADT | Suff. Rating |
---|
September 2018 | Fair | Satisfactory | Satisfactory | Satisfactory | 727 | 50.2 |
September 2016 | Fair | Satisfactory | Satisfactory | Satisfactory | 727 | 47.7 |
September 2014 | Fair | Satisfactory | Satisfactory | Satisfactory | 727 | 47.7 |
September 2012 | Fair | Satisfactory | Satisfactory | Satisfactory | 750 | 47.3 |
October 2010 | Fair | Satisfactory | Satisfactory | Satisfactory | 1173 | 42.5 |
November 2008 | Fair | Satisfactory | Satisfactory | Satisfactory | 1173 | 42.5 |
September 2006 | Fair | Satisfactory | Satisfactory | Good | 1000 | 40.5 |
October 2004 | Fair | Satisfactory | Satisfactory | Good | 1000 | 40.5 |
October 2002 | Fair | Satisfactory | Satisfactory | Good | 1000 | 40.5 |
October 2000 | Fair | Fair | Satisfactory | Good | 507 | 42.4 |
September 1998 | Poor | Poor | Fair | Good | 507 | 40.4 |
July 1996 | Poor | Poor | Fair | Good | 507 | 40.2 |
June 1994 | Poor | Poor | Fair | Good | 507 | 39.0 |
September 1992 | Poor | Poor | Fair | Good | 405 | 42.1 |