US 395 over DRY GULCH
Map
Coordinates:
+46.66333, -118.8503646°39'48" N, 118°51'01" W
Facts
Source: National Bridge Inventory. Information not verified; use at your own risk.
Name: | US 395 over DRY GULCH |
Structure number: | 0007847A0000000 |
Location: | 0.9 N JCT SR 260 |
Route classification: | Principal Arterial - Other (Rural) [02] |
Length of largest span: | 42.0 ft. [12.8 m] |
Total length: | 119.1 ft. [36.3 m] |
Roadway width between curbs: | 40.4 ft. [12.3 m] |
Deck width edge-to-edge: | 43.6 ft. [13.3 m] |
Skew angle: | 16° |
Owner: | State Highway Agency [01] |
Year built: | 1966 |
Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
Design load: | MS 18 / HS 20 [5] |
Number of main spans: | 3 |
Main spans material: | Prestressed concrete continuous [6] |
Main spans design: | Stringer/Multi-beam or girder [02] |
Deck type: | Concrete Cast-in-Place [1] |
Wearing surface: | Latex Concrete or similar additive [3] |
Latest Available Inspection: February 2018
Good/Fair/Poor Condition: | Good |
Status: | Open, no restriction [A] |
Average daily traffic: | 4,259 [as of 2016] |
Truck traffic: | 37% of total traffic |
Deck condition: | Good [7 out of 9] |
Superstructure condition: | Good [7 out of 9] |
Substructure condition: | Good [7 out of 9] |
Structural appraisal: | Better than present minimum criteria [7] |
Deck geometry appraisal: | Equal to present minimum criteria [6] |
Roadway alignment appraisal: | Equal to present desirable criteria [8] |
Scour condition: | Bridge not over waterway. [N] |
Sufficiency rating: | 93.1 |
Recommended work: | Bridge rehabilitation because of general structure deterioration or inadequate strength. [35] |
Estimated cost of work: | $2,094,000 |
Previous Inspections
Date | Condition | Deck | Superstructure | Substructure | ADT | Suff. Rating |
---|
February 2018 | Good | Good | Good | Good | 4259 | 93.1 |
February 2014 | Good | Good | Good | Good | 3452 | 93.8 |
February 2010 | Good | Good | Good | Good | 3678 | 93.6 |
February 2008 | Good | Good | Good | Good | 7100 | 89.1 |
March 2006 | Good | Good | Good | Good | 4600 | 92.6 |
April 2002 | Good | Good | Good | Good | 4600 | 92.6 |
March 2000 | Good | Good | Good | Good | 4600 | 92.6 |
April 1998 | Good | Good | Good | Good | 4600 | 92.6 |
November 1996 | Good | Good | Good | Good | 4600 | 92.6 |
June 1994 | Good | Good | Good | Good | 4600 | 85.6 |
March 1992 | Fair | Satisfactory | Good | Good | 4600 | 92.5 |
Element Data
Source: National Bridge Elements dataset, 2019 edition. This feature is experimental.
Element | Units | Quantity | 1-Good | 2-Fair | 3-Poor | 4-Serious |
---|
Superstructure |
Prestressed Concrete Girder/Beam | linear ft. | 952 | 949 | 0 | 3 | 0 |
Deck |
Reinforced Concrete Deck | sq. ft. | 4,819 | 4,819 | 0 | 0 | 0 |
Wearing Surfaces | sq. ft. | 4,819 | 0 | 4,819 | 0 | 0 |
Substructure |
Reinforced Concrete Column | each | 6 | 6 | 0 | 0 | 0 |
Reinforced Concrete Abutment | linear ft. | 120 | 120 | 0 | 0 | 0 |
Reinforced Concrete Pier Cap | linear ft. | 87 | 87 | 0 | 0 | 0 |
Joints |
Pourable Joint | linear ft. | 111 | 0 | 111 | 0 | 0 |
Bearings |
Elastomeric Bearing | each | 16 | 16 | 0 | 0 | 0 |
Bridge Rail |
Steel or Aluminum Bridge Rail | linear ft. | 238 | 237 | 0 | 1 | 0 |
Reinforced Concrete Bridge Rail | linear ft. | 238 | 238 | 0 | 0 | 0 |