COUNTY HIGHWAY over PASCO PUMP LATERAL
Map
Coordinates:
+46.32929, -119.2362846°19'45" N, 119°14'11" W
Facts
Source: National Bridge Inventory. Information not verified; use at your own risk.
Name: | COUNTY HIGHWAY over PASCO PUMP LATERAL |
Structure number: | 082581000000000 |
Location: | 0.49 W JCT 1000 |
Purpose: | Carries highway over waterway |
Route classification: | Local (Rural) [09] |
Length of largest span: | 23.0 ft. [7.0 m] |
Total length: | 23.0 ft. [7.0 m] |
Roadway width between curbs: | 23.0 ft. [7.0 m] |
Deck width edge-to-edge: | 24.0 ft. [7.3 m] |
Owner: | County Highway Agency [02] |
Year built: | 1954 |
Year reconstructed: | 1961 |
Historic significance: | Historical significance is not determinable at this time [4] |
Design load: | MS 18 / HS 20 [5] |
Main span material: | Steel [3] |
Main span design: | Stringer/Multi-beam or girder [02] |
Deck type: | Concrete Precast Panels [2] |
Wearing surface: | Bituminous [6] |
Latest Available Inspection: December 2018
Good/Fair/Poor Condition: | Poor |
Status: | Posted for load [P] |
Average daily traffic: | 372 [as of 2018] |
Truck traffic: | 5% of total traffic |
Deck condition: | Serious [3 out of 9] |
Superstructure condition: | Poor [4 out of 9] |
Substructure condition: | Satisfactory [6 out of 9] |
Structural appraisal: | Meets minimum tolerable limits to be left in place as is [4] |
Deck geometry appraisal: | Meets minimum tolerable limits to be left in place as is [4] |
Water adequacy appraisal: | Equal to present desirable criteria [8] |
Roadway alignment appraisal: | Equal to present desirable criteria [8] |
Channel protection: | Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8] |
Scour condition: | Bridge foundations (including piles) on dry land well above flood water elevations. [9] |
Sufficiency rating: | 25.9 |
Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
Estimated cost of work: | $146,000 |
Previous Inspections
Date | Condition | Deck | Superstructure | Substructure | ADT | Suff. Rating |
---|
December 2018 | Poor | Serious | Poor | Satisfactory | 372 | 25.9 |
December 2017 | Poor | Serious | Poor | Satisfactory | 372 | 25.9 |
December 2016 | Poor | Serious | Poor | Satisfactory | 372 | 25.9 |
December 2015 | Poor | Poor | Fair | Satisfactory | 372 | 68.9 |
December 2014 | Poor | Poor | Fair | Satisfactory | 372 | 68.9 |
December 2012 | Fair | Fair | Fair | Satisfactory | 267 | 70.9 |
January 2011 | Fair | Fair | Fair | Satisfactory | 267 | 70.9 |
March 2009 | Fair | Fair | Fair | Satisfactory | 267 | 70.9 |
January 2007 | Fair | Fair | Fair | Satisfactory | 299 | 70.9 |
December 2004 | Fair | Fair | Fair | Satisfactory | 299 | 70.9 |
March 2003 | Fair | Fair | Good | Good | 170 | 84.5 |
January 2001 | Fair | Fair | Good | Good | 170 | 84.5 |
January 1999 | Good | Good | Very Good | Good | 170 | 85.5 |
January 1997 | Good | Good | Very Good | Good | 170 | 85.5 |
February 1995 | Good | Good | Very Good | Good | 170 | 73.9 |
January 1993 | Good | Good | Very Good | Good | 285 | 62.4 |
December 1990 | Fair | Satisfactory | Very Good | Good | 110 | 66.5 |