COUNTY ROUTE 40 over MILLIGAN CREEK
Map
Coordinates:
+37.83255, -80.5046837°49'57" N, 80°30'17" W
Facts
Source: National Bridge Inventory. Information not verified; use at your own risk.
Name: | COUNTY ROUTE 40 over MILLIGAN CREEK |
Structure number: | 00000000013A237 |
Location: | 0.90 Miles S. of CR 60/11 |
Purpose: | Carries highway over waterway |
Route classification: | Local (Rural) [09] |
Length of largest span: | 53.5 ft. [16.3 m] |
Total length: | 58.7 ft. [17.9 m] |
Roadway width between curbs: | 8.9 ft. [2.7 m] |
Deck width edge-to-edge: | 10.2 ft. [3.1 m] |
Vertical clearance above deck: | 10.5 ft. [3.2 m] |
Owner: | State Highway Agency [01] |
Year built: | 1884 |
Year reconstructed: | 2000 |
Historic significance: | Bridge is on the National Register of Historic Places [1] |
Main span material: | Steel [3] |
Main span design: | Stringer/Multi-beam or girder [02] |
Deck type: | Wood or Timber [8] |
Wearing surface: | Wood or Timber [7] |
Latest Available Inspection: July 2018
Good/Fair/Poor Condition: | Good |
Status: | Open, no restriction [A] |
Average daily traffic: | 155 [as of 2016] |
Truck traffic: | 10% of total traffic |
Deck condition: | Good [7 out of 9] |
Superstructure condition: | Good [7 out of 9] |
Substructure condition: | Good [7 out of 9] |
Structural appraisal: | Better than present minimum criteria [7] |
Deck geometry appraisal: | Basically intolerable requiring high priority of replacement [2] |
Water adequacy appraisal: | Superior to present desirable criteria [9] |
Roadway alignment appraisal: | Basically intolerable requiring high priority of corrrective action [3] |
Channel protection: | Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7] |
Scour condition: | Bridge foundations determined to be stable for the assessed or calculated scour condition. [8] |
Sufficiency rating: | 71.9 |
Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
Estimated cost of work: | $514,000 |
Previous Inspections
Date | Condition | Deck | Superstructure | Substructure | ADT | Suff. Rating |
---|
July 2018 | Good | Good | Good | Good | 155 | 71.9 |
July 2016 | Good | Good | Good | Good | 163 | 71.9 |
July 2014 | Good | Good | Good | Good | 150 | 71.9 |
July 2012 | Good | Very Good | Very Good | Very Good | 150 | 71.9 |
July 2010 | Good | Good | Good | Very Good | 8250 | 71.9 |
July 2008 | Good | Very Good | Very Good | Very Good | 150 | 71.9 |
January 2008 | Good | Very Good | Very Good | Very Good | 150 | 71.9 |
January 2007 | Good | Very Good | Very Good | Very Good | 150 | 71.9 |
August 2005 | Good | Very Good | Very Good | Very Good | 150 | 71.9 |
August 2003 | Good | Very Good | Very Good | Very Good | 250 | 71.8 |
August 2001 | Good | Very Good | Very Good | Very Good | 250 | 71.8 |