West Virginia 180 over Point Pleasant Creek
Map
Coordinates:
+39.57463, -80.8931339°34'29" N, 80°53'35" W
Facts
Source: National Bridge Inventory. Information not verified; use at your own risk.
Name: | West Virginia 180 over Point Pleasant Creek |
Structure number: | 00000000048A041 |
Location: | 0.25 mi. South jct CR1 |
Purpose: | Carries highway over waterway |
Route classification: | Major Collector (Rural) [07] |
Length of largest span: | 42.0 ft. [12.8 m] |
Total length: | 86.9 ft. [26.5 m] |
Roadway width between curbs: | 36.1 ft. [11.0 m] |
Deck width edge-to-edge: | 39.4 ft. [12.0 m] |
Owner: | State Highway Agency [01] |
Year built: | 1996 |
Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
Design load: | MS 22.5 / HS 25 [9] |
Number of main spans: | 2 |
Main spans material: | Steel continuous [4] |
Main spans design: | Stringer/Multi-beam or girder [02] |
Deck type: | Concrete Cast-in-Place [1] |
Wearing surface: | Monolithic Concrete (concurrently placed with structural deck) [1] |
Latest Available Inspection: June 2016
Good/Fair/Poor Condition: | Fair |
Status: | Open, no restriction [A] |
Average daily traffic: | 3,263 [as of 2014] |
Truck traffic: | 9% of total traffic |
Deck condition: | Satisfactory [6 out of 9] |
Superstructure condition: | Good [7 out of 9] |
Substructure condition: | Good [7 out of 9] |
Structural appraisal: | Better than present minimum criteria [7] |
Deck geometry appraisal: | Somewhat better than minimum adequacy to tolerate being left in place as is [5] |
Water adequacy appraisal: | Equal to present minimum criteria [6] |
Roadway alignment appraisal: | Equal to present desirable criteria [8] |
Channel protection: | Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6] |
Scour condition: | Bridge foundations determined to be stable for the assessed or calculated scour condition. [8] |
Sufficiency rating: | 95.4 |
Recommended work: | Bridge deck rehabilitation with only incidental widening. [36] |
Estimated cost of work: | $97,000 |
Previous Inspections
Date | Condition | Deck | Superstructure | Substructure | ADT | Suff. Rating |
---|
June 2016 | Fair | Satisfactory | Good | Good | 3263 | 95.4 |
June 2012 | Good | Very Good | Very Good | Good | 3100 | 95.6 |
June 2008 | Good | Very Good | Very Good | Very Good | 3600 | 95.1 |
June 2004 | Good | Very Good | Very Good | Very Good | 3700 | 95.0 |
June 2000 | Good | Excellent | Excellent | Excellent | 3200 | 95.5 |
June 1998 | Good | Excellent | Excellent | Excellent | 3400 | 95.3 |
June 1996 | Good | Excellent | Excellent | Excellent | 2500 | 95.3 |
April 1995 | Poor | Serious | Serious | Serious | 2500 | 13.9 |
April 1993 | Poor | Poor | Poor | Poor | 2300 | 40.5 |
April 1991 | Poor | Poor | Poor | Poor | 2300 | 40.5 |