Share:

ANAMOSA REFORM over BUFFALO CREEK (SDB)

This bridge is no longer in the current National Bridge Inventory database, and has likely been demolished or abandoned.

Map

Coordinates:
+42.10999, -91.29542
42°06'36" N, 91°17'44" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:ANAMOSA REFORM over BUFFALO CREEK (SDB)
Structure number:000000000699785
Location:IN QUARRY @ STATE REF.
Purpose:Carries highway over waterway
Route classification:Local (Urban) [19]
Length of largest span:100.1 ft. [30.5 m]
Total length:102.0 ft. [31.1 m]
Roadway width between curbs:15.4 ft. [4.7 m]
Deck width edge-to-edge:16.1 ft. [4.9 m]
Vertical clearance above deck:15.4 ft. [4.7 m]
Owner:Other State Agencies [21]
Year reconstructed:2000
Historic significance:Historical significance is not determinable at this time [4]
Main span material:Steel [3]
Main span design:Truss - Thru [10]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

Latest Available Inspection: May 2011

Good/Fair/Poor Condition:Fair
Status:Posted for load [P]
Average daily traffic:10
Deck condition:Fair [5 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Fair [5 out of 9]
Structural appraisal:Meets minimum tolerable limits to be left in place as is [4]
Deck geometry appraisal:Equal to present minimum criteria [6]
Water adequacy appraisal:Equal to present desirable criteria [8]
Roadway alignment appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Channel protection:Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and rush restrict the channel. [5]
Scour condition:Bridge is scour critical; bridge foundations determined to be unstable. [3]
Sufficiency rating:48.8

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
May 2011FairFairFairFair1048.8
April 2009FairFairFairFair1048.5
April 2007FairFairFairFair1048.9
April 2005FairSatisfactoryFairFair1049.9
April 2004FairSatisfactoryFairFair1037.1
July 2002FairSatisfactoryFairFair1037.1
May 2001FairSatisfactoryFairFair1037.3
January 1999PoorSatisfactoryCriticalFair1029.5
June 1997PoorSatisfactoryCriticalFair1023.1
November 1996PoorSatisfactoryCriticalFair1023.1