PERRY ROAD over COASTERS HARBOR
Map
Coordinates:
+41.51420, -71.3238041°30'51" N, 71°19'26" W
Facts
Source: National Bridge Inventory. Information not verified; use at your own risk.
Name: | PERRY ROAD over COASTERS HARBOR |
Structure number: | 1RI1400 |
Location: | 0.3KM N OF MEYER KORD AVE |
Purpose: | Carries highway and pedestrian walkway over waterway |
Route classification: | Local (Urban) [19] |
Length of largest span: | 90.2 ft. [27.5 m] |
Total length: | 936.7 ft. [285.5 m] |
Roadway width between curbs: | 27.9 ft. [8.5 m] |
Deck width edge-to-edge: | 36.7 ft. [11.2 m] |
Owner: | Navy/Marines [73] |
Year built: | 2010 |
Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
Design load: | MS 22.5 / HS 25 [9] |
Number of main spans: | 11 |
Main spans material: | Prestressed concrete [5] |
Main spans design: | Box beam or girders - Multiple [05] |
Deck type: | Concrete Cast-in-Place [1] |
Wearing surface: | Bituminous [6] |
Latest Available Inspection: August 2017
Good/Fair/Poor Condition: | Fair |
Status: | Open, no restriction [A] |
Average daily traffic: | 2,000 [as of 2011] |
Truck traffic: | 5% of total traffic |
Deck condition: | Good [7 out of 9] |
Superstructure condition: | Good [7 out of 9] |
Substructure condition: | Satisfactory [6 out of 9] |
Structural appraisal: | Equal to present minimum criteria [6] |
Deck geometry appraisal: | Somewhat better than minimum adequacy to tolerate being left in place as is [5] |
Water adequacy appraisal: | Equal to present desirable criteria [8] |
Roadway alignment appraisal: | Equal to present desirable criteria [8] |
Channel protection: | Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7] |
Pier/abutment protection: | Navigation protection not required [1] |
Scour condition: | Bridge foundations determined to be stable for assessed or calculated scour condition. [5] |
Sufficiency rating: | 91.3 |
Recommended work: | Other structural work, including hydraulic replacements. [38] |
Estimated cost of work: | $96,000 |
Previous Inspections
Date | Condition | Deck | Superstructure | Substructure | ADT | Suff. Rating |
---|
August 2017 | Fair | Good | Good | Satisfactory | 2000 | 91.3 |
August 2015 | Fair | Good | Good | Satisfactory | 2000 | 91.3 |
August 2013 | Good | Good | Good | Good | 2000 | 91.3 |