Share:

COUNTY RD 2025 over TRIB OF CLEAR CR

Map

Coordinates:
+37.73056, -94.27086
37°43'50" N, 94°16'15" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:COUNTY RD 2025 over TRIB OF CLEAR CR
Structure number:34761
Location:S 6 T 34 N R 30 W
Purpose:Carries highway over waterway
Route classification:Local (Rural) [09]
Length of largest span:39.0 ft. [11.9 m]
Total length:40.7 ft. [12.4 m]
Roadway width between curbs:22.0 ft. [6.7 m]
Deck width edge-to-edge:22.6 ft. [6.9 m]
Owner:County Highway Agency [02]
Year built:2014
Historic significance:Historical significance is not determinable at this time [4]
Design load:MS 18 / HS 20 [5]
Main span material:Steel [3]
Main span design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

Latest Available Inspection: February 2018

Good/Fair/Poor Condition:Good
Status:Open, no restriction [A]
Average daily traffic:1 [as of 2016]
Truck traffic:10% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Excellent [9 out of 9]
Structural appraisal:Better than present minimum criteria [7]
Deck geometry appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Water adequacy appraisal:Equal to present desirable criteria [8]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Sufficiency rating:99.0

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
February 2018GoodGoodGoodExcellent199.0
February 2016GoodExcellentGoodExcellent199.0
March 2014GoodExcellentExcellentExcellent199.0