Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:SHERROW AVENUE over Tripps Run
Structure number:000000000030146
Location:0.2 Mi. N. of So.VA Ave.
Purpose:Carries highway and pedestrian walkway over waterway
Route classification:Local (Rural) [09]
Length of largest span:7.9 ft. [2.4 m]
Total length:36.1 ft. [11.0 m]
Roadway width between curbs:30.5 ft. [9.3 m]
Deck width edge-to-edge:40.4 ft. [12.3 m]
Owner:City or Municipal Highway Agency [04]
Year built:1980
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:4
Main spans material:Steel [3]
Main spans design:Culvert [19]
Deck type:Not applicable [N]
Wearing surface:Bituminous [6]

Latest Available Inspection: January 2018

Good/Fair/Poor Condition:Poor
Status:Open, no restriction [A]
Average daily traffic:1,000 [as of 2013]
Truck traffic:3% of total traffic
Structural appraisal:Meets minimum tolerable limits to be left in place as is [4]
Deck geometry appraisal:Equal to present minimum criteria [6]
Water adequacy appraisal:Better than present minimum criteria [7]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Culvert condition:Large spalls, heavy scaling, wide cracks, considerable efflorescence or opened construction joint permitting loss of backfill. Considerable settlement or misalignment. Considerable scouring or erosion at curtain walls, wingwalls or pipes. Metal culverts have significant distortion and deflection throughout, extensive corrosion or deep pitting. [4]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Sufficiency rating:67.4
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$3,000

Previous Inspections

DateConditionCulvert ConditionADTSuff. Rating
January 2018Poor4 out of 10100067.4
January 2016Fair5 out of 10100083.4
January 2015Poor4 out of 10100067.4
January 2014Poor4 out of 10100067.4