Share:

I-76 over I-676 SB, I-95 & DEL RIV

Map

Coordinates:
+39.90523, -75.12950
39°54'19" N, 75°07'46" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:I-76 over I-676 SB, I-95 & DEL RIV
Structure number:000000000039190
Location:GLOUCESTER CITY
Purpose:Carries highway over highway, waterway, and railroad
Route classification:Principal Arterial - Interstate (Urban) [11]
Tolls:Yes [1]
Length of largest span:2000.1 ft. [609.6 m]
Total length:11693.5 ft. [3564.0 m]
Roadway width between curbs:79.1 ft. [24.1 m]
Deck width edge-to-edge:86.9 ft. [26.5 m]
Vertical clearance above deck:15.7 ft. [4.8 m]
Vertical clearance below bridge:98.4 ft. [30.0 m]
Owner:Local Toll Authority [32]
Year built:1957
Year reconstructed:2009
Historic significance:Bridge is eligible for the National Register of Historic Places [2]
Design load:MS 18 / HS 20 [5]
Number of main spans:3
Main spans material:Steel [3]
Main spans design:Suspension [13]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

Latest Available Inspection: May 2018

Good/Fair/Poor Condition:Fair
Status:Open, no restriction [A]
Average daily traffic:110,000 [as of 2018]
Truck traffic:9% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Good [7 out of 9]
Structural appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck geometry appraisal:Basically intolerable requiring high priority of replacement [2]
Underclearances appraisal:Basically intolerable requiring high priority of corrrective action [3]
Water adequacy appraisal:Superior to present desirable criteria [9]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:There are no noticeable or noteworthy deficiencies which affect the condition of the channel. [9]
Pier/abutment protection:In place and functioning [2]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Sufficiency rating:44.8
Recommended work:Widening of existing bridge with deck rehabilitation or replacement. [34]
Estimated cost of work:$134,050,000

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
May 2018FairGoodSatisfactoryGood11000044.8
June 2016FairGoodSatisfactoryGood11000015.0