Carries | Crosses | Location | Design | Status | Year Built | Year Recon. | Span Len. | Total Len. | Condition | Suff. Rating | ID | |
---|---|---|---|---|---|---|---|---|---|---|---|---|
NBI report Bridgehunter | MISSION CANYON RD | MISSION CREEK | 0.15 MI N ALAMEDA PDRE SE | Masonry Arch - Deck | NR eligible | 1891 | -- | 24.0 | 24.0 | Good | 55.0 | 51C0051 |
NBI report | UP RR & AMTRAK | S101-LOS PATOS OFF | 05-SB-101-11.65-SB | Steel Stringer/Multi-beam or girder | -- | 1901 | -- | 56.1 | -- | -- | -- | 51 0235 |
NBI report | US HIGHWAY 101 SB | ARROYO PARIDA | 05-SB-101-R5.63 | Steel Stringer/Multi-beam or girder | -- | 1907 | 1927 | 29.9 | 38.7 | Fair | 72.4 | 51 0049L |
NBI report Bridgehunter | PARK ROAD | GAVIOTA CREEK | GAVIOTA STATE PARK | Steel Truss - Thru | -- | 1909 | -- | 71.9 | 73.2 | Fair | 49.6 | 51P0007 |
NBI report | DE LA GUERRA ST | MISSION CREEK | BTWN CASTILLO & BATH ST | Concrete Tee beam | -- | 1914 | -- | 30.8 | 35.1 | Fair | 62.5 | 51C0301 |
NBI report | MONTECITO ST | MISSION CREEK | 0.05 MI W CHAPALA ST | Concrete Tee beam | -- | 1915 | -- | 39.0 | 41.0 | Poor | 62.7 | 51C0249 |
NBI report Bridgehunter | RINCON HILL RD | RINCON CREEK | 0.45 MI N OF SR 150 | Concrete Arch - Deck | NR eligible | 1915 | -- | 85.0 | 125.0 | Fair | 47.3 | 51C0039 |
NBI report | US HIGHWAY 101 | ROMERO CREEK | 05-SB-101-9.34 | Concrete Tee beam | -- | 1915 | 1926 | 29.9 | 32.2 | Fair | 41.7 | 51 0053 |
NBI report | US HIGHWAY 101 | SAN YSIDRO CREEK | 05-SB-101-9.56 | Concrete Tee beam | -- | 1915 | 1959 | 27.9 | 32.2 | Fair | 62.8 | 51 0047 |
NBI report | DE LA VINA ST | MISSION CREEK | 0.1 MI N ALAMAR AVE | Concrete Tee beam | -- | 1916 | 1926 | 29.9 | 33.1 | Poor | 32.6 | 51C0244 |
NBI report | US HIGHWAY 101 NB | SAN ANTONIO CREEK | 05-SB-101-67.09 | Concrete Tee beam | -- | 1916 | 1931 | 26.9 | 27.9 | Fair | 60.8 | 51 0009R |
NBI report | U.S. HIGHWAY 101 | SAN ANTONIO CREEK | 05-SB-101-67.41 | Concrete Girder and floorbeam system | -- | 1916 | 1954 | 27.9 | 28.9 | Good | 81.2 | 51 0008 |
NBI report | UP RR & AMTRAK | CABRILLO BLVD | 0.1 MI SOUTH OF HWY 101 | Steel Stringer/Multi-beam or girder | -- | 1917 | -- | 43.0 | -- | -- | -- | 51C0329 |
NBI report Bridgehunter | US HIGHWAY 101 SB | ARROYO QUEMADA | 05-SB-101-39.75 | Concrete Arch - Deck (2 spans) | NR eligible | 1917 | 1997 | 108.9 | 341.2 | Good | 74.1 | 51 0028L |
NBI report Bridgehunter | ASHLEY RD | MONTECITO CREEK | 0.57 MI N/E VALLEY RD | Masonry Arch - Deck | NR eligible | 1918 | -- | 24.9 | 26.9 | Poor | 14.5 | 51C0043 |
NBI report Bridgehunter | LAS CANOAS RD | RATTLESNAKE CANYON | 1.2 MI N/E MISSION CYN RD | Masonry Arch - Deck | NR eligible | 1919 | -- | 24.9 | 26.9 | Fair | 44.6 | 51C0054 |
NBI report Bridgehunter | STATE ROUTE 192 | SYCAMORE CANYON CREEK | 05-SB-192-5.98-SB | Masonry Arch - Deck | NR eligible | 1921 | -- | 21.0 | 35.1 | Good | 63.7 | 51 0106 |
NBI report | NO DATA ENTERED | MIRANDA PINE CREEK | NO DATA ENTERED | Concrete Stringer/Multi-beam or girder (3 spans) | -- | 1923 | -- | 120.1 | 122.1 | Fair | 82.5 | 050753000003009 |
NBI report | CARPENTERIA ST | SYCAMORE CREEK | BTWN SOLEDAD & CANADA ST | Wood Stringer/Multi-beam or girder (3 spans) | -- | 1925 | 1940 | 17.1 | 51.2 | Fair | 54.9 | 51C0294 |
NBI report | ANAPAMU STREET | OLD MISSION CREEK | 100YRDS NE OF SAN ANDREAS | Concrete Tee beam | -- | 1926 | -- | 38.1 | 39.0 | Fair | 43.9 | 51C0314 |
NBI report | GUTIERREZ ST | MISSION CREEK | DE LA VINA ST/CHAPALA ST | Concrete Tee beam | -- | 1926 | -- | 37.1 | 38.1 | Fair | 46.4 | 51C0132 |
NBI report | PEDREGOSA STREET | MISSION CREEK | SOUTH OF CASTILLO ST | Concrete Tee beam | -- | 1926 | -- | 36.1 | 38.1 | Fair | 44.8 | 51C0306 |
NBI report | STATE ROUTE 150 | RINCON CREEK | 05-SB-150-2.19 | Concrete Tee beam | -- | 1927 | -- | 60.0 | 62.0 | Poor | 13.8 | 51 0142 |
NBI report | STATE ROUTE 192 | TORO CREEK | 05-SB-192-12.14 | Concrete Tee beam | -- | 1928 | -- | 28.9 | 30.8 | Good | 76.8 | 51 0111 |
NBI report | STATE ROUTE 192 | SANTA MONICA CANYON | 05-SB-192-16.57 | Concrete Tee beam | -- | 1928 | -- | 28.9 | 30.8 | Fair | 46.8 | 51 0114 |
NBI report | STATE ROUTE 192 | MISSION CREEK | 05-SB-192-3.36 | Concrete Stringer/Multi-beam or girder | -- | 1929 | -- | 40.0 | 42.0 | Fair | 50.6 | 51 0105 |
NBI report | U.S. HIGHWAY 101 | WINCHESTER CREEK | 05-SB-101-27.16 | Concrete Culvert (2 spans) | -- | 1929 | 1961 | 20.0 | 25.9 | Good | 71.4 | 51 0149 |
NBI report | STATE ROUTE 1 | SALSIPUEDES CREEK | 05-SB-001-15.61 | Concrete Tee beam (3 spans) | -- | 1929 | 1980 | 39.0 | 123.0 | Fair | 70.8 | 51 0095 |
NBI report | HOLLISTER AVENUE | TECOLOTITO CREEK | 0.1 MI E LOS CARNEROS RD | Concrete Tee beam (2 spans) | -- | 1929 | 1984 | 29.9 | 66.9 | Poor | 52.1 | 51C0128 |
NBI report | QUINIENTOS ST | SYCAMORE CREEK | SOLEDAD ST AND CANADA ST | Concrete Tee beam | -- | 1930 | -- | 36.1 | 38.1 | Fair | 44.0 | 51C0285 |
NBI report | US HIGHWAY 101 NB | NOJOQUI CREEK | 05-SB-101-56.00 | Concrete Tee beam (4 spans) | -- | 1930 | -- | 42.7 | 170.0 | Fair | 52.7 | 51 0018R |
NBI report | ALAMAR AVE | MISSION CREEK | SOUTH OF STATE ST | Concrete Tee beam | -- | 1930 | 1979 | 40.0 | 46.6 | Fair | 83.3 | 51C0243 |
NBI report | UP RR & AMTRAK | HOLLISTER AVENUE | EAST MODOC RD | Steel Girder and floorbeam system | -- | 1931 | -- | 107.9 | -- | -- | -- | 51C0018 |
NBI report Bridgehunter | US HIGHWAY 101 SB | GAVIOTA CREEK | 05-SB-101-47.23 | Concrete Arch - Deck | -- | 1931 | -- | 100.1 | 107.9 | Good | 85.3 | 51 0024L |
NBI report | US HIGHWAY 101 SB | CABRILLO BLVD | 05-SB-101-11.43-SB | Concrete Slab (5 spans) | -- | 1934 | -- | 55.1 | 147.0 | Good | 94.0 | 51 0086L |
NBI report | STATE ROUTE 154 | BRANCH COTA CREEK | 05-SB-154-R6.94 | Concrete Culvert (3 spans) | -- | 1936 | 1971 | 7.9 | 26.9 | Good | 76.4 | 51 0267 |
NBI report | CARPINTERIA RD | CARPINTERIA CREEK | 0.2 MI S OF CASITAS PASS | Concrete Tee beam (5 spans) | -- | 1937 | -- | 51.8 | 191.9 | Fair | 61.1 | 51C0172 |
NBI report | US HIGHWAY 101 NB | NOJOQUI CREEK | 05-SB-101-55.66 | Concrete Tee beam (3 spans) | -- | 1938 | -- | 45.9 | 120.1 | Fair | 44.7 | 51 0019R |
NBI report | STATE ROUTE 246 | SANTA YNEZ RIVER | 05-SB-246-9.82 | Steel Stringer/Multi-beam or girder (7 spans) | -- | 1939 | -- | 81.0 | 446.9 | Fair | 68.9 | 51 0128 |
NBI report | SAN LEANDRO LN | SAN YSIDRO CREEK | 0.3 MI E OF SANTA ROSA LN | Concrete Tee beam | -- | 1940 | -- | 26.9 | 28.9 | Fair | 53.2 | 51C0047 |
NBI report | JALAMA ROAD | SALSIPUEDES CREEK | WEST OF SR 1 | Steel Girder and floorbeam system | -- | 1941 | 2016 | 59.1 | 63.0 | Fair | 56.8 | 51C0013 |
NBI report | JALAMA RD | SALSIPUEDES CREEK | 2.1 MI S OF S.H. 1 | Steel Stringer/Multi-beam or girder (3 spans) | -- | 1942 | 1983 | 40.0 | 101.1 | Fair | 50.9 | 51C0090 |
NBI report | BLACK ROAD | UP RR & AMTRAK | 2.0 MI N ASSOCIATED RD | Steel Stringer/Multi-beam or girder | -- | 1943 | -- | 70.9 | 228.7 | Fair | 57.6 | 51C0035 |
NBI report | LOMPOC CASMALIA RD | UP RR & AMTRAK | 0.4 MI S/O POINT SAL RD | Steel Stringer/Multi-beam or girder | -- | 1943 | -- | 65.3 | 279.2 | Fair | 63.7 | 51C0036 |
NBI report | STATE ROUTE 166 | BRANCH CANYON | 05-SB-166-64.19 | Concrete Slab (3 spans) | -- | 1943 | 2008 | 19.0 | 56.1 | Good | 64.6 | 51 0036 |
NBI report | STATE ROUTE 166 | SALISBURY CANYON | 05-SB-166-64.76 | Concrete Culvert (2 spans) | -- | 1943 | 2008 | 12.8 | 25.6 | Fair | 80.0 | 51 0065 |
NBI report Bridgehunter | STATE ROUTE 1 NB | SANTA YNEZ RIVER | 05-SB-001-22.52 | Steel Truss - Thru | -- | 1944 | 1953 | 120.1 | 684.7 | Good | 60.7 | 51 0097R |
NBI report | U.S. HIGHWAY 101 | CARNEROS CREEK | 05-SB-101-23.56 | Concrete Culvert (2 spans) | -- | 1945 | 1968 | 18.0 | 21.7 | Good | 72.6 | 51 0169 |
NBI report | E MASON STREET | SYCAMORE CANYON CREEK | 0.6 MI N JCT. W/ RTE. 101 | Steel Arch - Deck | -- | 1946 | -- | 25.9 | 25.9 | Fair | 46.9 | 51C0345 |
NBI report | U.S. HIGHWAY 101 | GLEN ANNIE CREEK | 05-SB-101-24.41 | Concrete Culvert (2 spans) | -- | 1946 | 1961 | 12.1 | 25.9 | Good | 64.2 | 51 0171 |
NBI report | US HIGHWAY 101 SB | SAN JOSE CREEK | 05-SB-101-21.62 | Concrete Slab (3 spans) | -- | 1946 | 1989 | 29.9 | 92.9 | Poor | 54.0 | 51 0163L |
NBI report | ALAMO PINTADO AV | ALAMO PINTADO CREEK | 0.2 MI W OF GRAND AV | Steel Stringer/Multi-beam or girder (2 spans) | -- | 1948 | -- | 28.9 | 62.0 | Fair | 70.6 | 51C0081 |
NBI report | AVE OF THE FLAGS | ZACA CREEK | 0.1 MI S OF SH 246 | Concrete Culvert (2 spans) | -- | 1948 | -- | 11.2 | 24.0 | Good | 61.0 | 51C0175 |
NBI report | JALAMA RD | JALAMA CREEK | 12.13 MI WEST S.H. 1 | Steel Stringer/Multi-beam or girder (3 spans) | -- | 1948 | -- | 28.9 | 59.1 | Fair | 55.1 | 51C0019 |
NBI report | NO DATA ENTERED | BLUE CANYON CREEK | NO DATA ENTERED | Steel Truss - Deck | -- | 1948 | -- | 29.9 | 34.1 | Fair | 82.4 | 050754000003006 |
NBI report | STATE ROUTE 1 | UP RR & AMTRAK | 05-SB-001-46.45 | Steel Stringer/Multi-beam or girder (3 spans) | -- | 1948 | -- | 51.8 | 136.2 | Good | 80.1 | 51 0102 |
NBI report | TEPUSQUET ROAD | TEPUSQUET CREEK | 1.72 MI N FOXEN CANYON RD | Concrete Tee beam | -- | 1948 | -- | 24.9 | 27.9 | Good | 76.5 | 51C0097 |
NBI report | AVE OF THE FLAGS | SANTA YNEZ RIVER | 0.6 MI SOUTH OF SR 246 | Steel Stringer/Multi-beam or girder (10 spans) | -- | 1949 | -- | 100.1 | 1002.0 | Poor | 63.3 | 51C0174 |
NBI report | STATE ST | MISSION CREEK | SE OF ALAMAR AVE | Concrete Tee beam | -- | 1950 | -- | 29.9 | 32.2 | Fair | 71.8 | 51C0133 |
NBI report | US HIGHWAY 101 | ARROYO HONDO | 05-SB-101-40.98 | Concrete Culvert | -- | 1950 | 1984 | 16.1 | 20.0 | Good | 96.5 | 51 0027 |
NBI report | KINEVAN RD | SAN JOSE CREEK | 0.1 MI WEST OF SR 154 | Steel Stringer/Multi-beam or girder | -- | 1950 | 1988 | 23.0 | 24.0 | Fair | 86.0 | 51C0215 |
NBI report | JALAMA ROAD | RAMAJAL CREEK | 7.7 MI WEST OF SR 1 | Steel Stringer/Multi-beam or girder (3 spans) | -- | 1951 | 1986 | 25.9 | 66.3 | Fair | 67.1 | 51C0016 |
NBI report | HAPPY CANYON ROAD | SANTA AQUEDA CREEK | 2.8 MI E SR 154 | Steel Stringer/Multi-beam or girder | -- | 1952 | -- | 49.9 | 53.2 | Good | 77.0 | 51C0075 |
NBI report | TEPUSQUET ROAD | COLSON CREEK | @ COLSON CANYON ROAD | Concrete Stringer/Multi-beam or girder | -- | 1952 | -- | 30.8 | 33.1 | Good | 75.0 | 51C0101 |
NBI report | US HIGHWAY 101 NB | TORO CREEK | 05-SB-101-R6.79 | Concrete Slab | -- | 1952 | -- | 28.9 | 30.8 | Fair | 80.9 | 51 0054R |
NBI report | VIA REAL | ARROYO PARIDA | 05-SB-101-R5.63 | Concrete Slab | -- | 1952 | -- | 32.2 | 35.8 | Good | 69.0 | 51 0049Y |
NBI report | US HIGHWAY 101 NB | ARROYO PARIDA | 05-SB-101-R5.63 | Concrete Slab | -- | 1952 | 1968 | 38.1 | 38.1 | Good | 88.2 | 51 0049R |
NBI report | VIA REAL | SANTA MONICA CREEK | 0.1 MI W SANTA YNEZ AVE | Concrete Slab (3 spans) | -- | 1953 | -- | 18.0 | 56.4 | Fair | 75.2 | 51C0386 |
NBI report | STATE ROUTE 33 | BALLINGER CANYON | 05-SB-033-7.05 | Concrete Slab (2 spans) | -- | 1953 | 2004 | 20.0 | 42.0 | Good | 89.1 | 51 0145 |
NBI report | STATE ROUTE 33 | QUATAL CANYON | 05-SB-033-1.84 | Concrete Slab (6 spans) | -- | 1953 | 2005 | 20.0 | 122.1 | Good | 87.8 | 51 0144 |
NBI report | ONTARE ROAD | SAN ROQUE CREEK | 0.45 MI S SR 192 | Concrete Slab | -- | 1954 | -- | 22.0 | 24.0 | Fair | 59.0 | 51C0056 |
NBI report | SEVENTH ST | US HIGHWAY 101 | 05-SB-101-3.65-CARP | Concrete Box beam or girders - Multiple (2 spans) | -- | 1954 | -- | 68.9 | 125.3 | Fair | 73.3 | 51 0178 |
NBI report | US HIGHWAY 101 NB | FRANKLIN CREEK | 05-SB-101-3.30-CARP | Concrete Slab (4 spans) | -- | 1954 | -- | 18.0 | 74.5 | Fair | 76.3 | 51 0051R |
NBI report | US HIGHWAY 101 SB | FRANKLIN CREEK | 05-SB-101-3.30-CARP | Concrete Slab (4 spans) | -- | 1954 | -- | 18.0 | 74.5 | Fair | 76.3 | 51 0051L |
NBI report | US HIGHWAY 101 NB | SANTA MONICA CREEK | 05-SB-101-3.77-CARP | Concrete Slab (3 spans) | -- | 1954 | 1968 | 18.0 | 56.4 | Good | 88.9 | 51 0050R |
NBI report | STATE ROUTE 246 | ALAMO PINTADO CREEK | 05-SB-246-30.32 | Concrete Slab (3 spans) | -- | 1954 | 1972 | 37.1 | 115.2 | Fair | 66.5 | 51 0130 |
NBI report | US HIGHWAY 101 NB | NOJOQUI CREEK | 05-SB-101-54.71 | Concrete Tee beam (4 spans) | -- | 1955 | -- | 54.1 | 195.9 | Good | 64.4 | 51 0020R |
NBI report | US HIGHWAY 101 SB | NOJOQUI CREEK | 05-SB-101-56.00 | Concrete Tee beam (4 spans) | -- | 1955 | -- | 42.7 | 169.0 | Good | 66.2 | 51 0018L |
NBI report | US HIGHWAY 101 SB | NOJOQUI CREEK | 05-SB-101-55.66 | Concrete Tee beam (3 spans) | -- | 1955 | -- | 51.8 | 131.9 | Good | 56.1 | 51 0019L |
NBI report | US HIGHWAY 101 SB | NOJOQUI CREEK | 05-SB-101-54.71 | Concrete Tee beam (3 spans) | -- | 1955 | -- | 69.9 | 175.9 | Good | 65.0 | 51 0020L |
NBI report | US HIGHWAY 101 SB | SANTA MONICA CREEK | 05-SB-101-3.77-CARP | Concrete Slab (3 spans) | -- | 1955 | -- | 18.0 | 56.4 | Good | 85.8 | 51 0050L |
NBI report | OLIVE MILL ROAD | U.S. HIGHWAY 101 | 05-SB-101-10.54-SB | Concrete Box beam or girders - Multiple (2 spans) | -- | 1956 | -- | 66.9 | 139.4 | Fair | 60.0 | 51 0031 |
NBI report | OLIVE MILL-S101 ON | US HIGHWAY 101 | 05-SB-101-10.49 | Concrete Box beam or girders - Multiple (2 spans) | -- | 1956 | -- | 77.1 | 147.0 | Fair | 77.3 | 51 0186K |
NBI report | PRIVATE DRIVE | NOJOQUI CREEK | 05-SB-101-54.40 | Concrete Tee beam (3 spans) | -- | 1956 | -- | 34.1 | 94.2 | Good | 73.9 | 51 0002Z |
NBI report | SAN MARCOS RD | MARIA YGNACIA CREEK | 0.5 MI N CATHEDRAL OAKS | Steel Stringer/Multi-beam or girder (3 spans) | -- | 1956 | -- | 60.0 | 131.2 | Fair | 49.7 | 51C0002 |
NBI report | SAN YSIDRO ROAD | US HIGHWAY 101 | 05-SB-101-10.02 | Concrete Slab (2 spans) | -- | 1956 | -- | 58.1 | 116.1 | Good | 72.6 | 51 0185 |
NBI report | U.S. HIGHWAY 101 | MONTECITO CREEK | 05-SB-101-10.18 | Concrete Slab | -- | 1956 | -- | 29.9 | 34.5 | Good | 87.9 | 51 0187 |
NBI report | US HIGHWAY 101 NB | NOJOQUI CREEK | 05-SB-101-54.85 | Concrete Tee beam (3 spans) | -- | 1956 | -- | 62.0 | 162.1 | Good | 48.8 | 51 0074R |
NBI report | US HIGHWAY 101 NB | NOJOQUI CREEK | 05-SB-101-55.00 | Concrete Tee beam (5 spans) | -- | 1956 | -- | 61.0 | 280.9 | Fair | 39.7 | 51 0075R |
NBI report | US HIGHWAY 101 NB | CABRILLO BLVD | 05-SB-101-11.43-SB | Concrete Box beam or girders - Multiple (3 spans) | -- | 1956 | -- | 100.1 | 220.2 | Good | 81.1 | 51 0086R |
NBI report | US HIGHWAY 101 SB | NOJOQUI CREEK | 05-SB-101-54.85 | Concrete Tee beam (3 spans) | -- | 1956 | -- | 62.0 | 162.1 | Good | 48.8 | 51 0074L |
NBI report | US HIGHWAY 101 SB | NOJOQUI CREEK | 05-SB-101-55.00 | Concrete Tee beam (5 spans) | -- | 1956 | -- | 57.1 | 264.1 | Good | 24.3 | 51 0075L |
NBI report | US HIGHWAY 101 NB | SOLOMON SUMMIT UC | 05-SB-101-78.69 | Concrete Slab | -- | 1956 | 1995 | 27.9 | 30.8 | Good | 80.0 | 51 0191R |
NBI report | US HIGHWAY 101 SB | SOLOMON SUMMIT UC | 05-SB-101-78.69 | Concrete Slab | -- | 1956 | 1995 | 27.9 | 30.8 | Good | 79.0 | 51 0191L |
NBI report | PEDESTRIAN WALKWAY | U.S. HIGHWAY 101, UP RR | 05-SB-101-16.23-SB | Prestressed Stringer/Multi-beam or girder | -- | 1957 | -- | 80.1 | -- | -- | -- | 51 0180 |
NBI report | STATE ST (EB) | US HIGHWAY 101 | 05-SB-101-18.11-SB | Concrete Box beam or girders - Multiple (4 spans) | -- | 1957 | -- | 95.1 | 296.9 | Good | 72.1 | 51 0183 |
NBI report | STATE ST (WB) | US HIGHWAY 101 | 05-SB-101-18.12-SB | Concrete Box beam or girders - Multiple (4 spans) | -- | 1957 | -- | 95.1 | 296.9 | Good | 72.1 | 51 0170 |
NBI report | TEPUSQUET RD | BUCKHORN CREEK | 13.8 MI N FOXEN CANYON RD | Steel Stringer/Multi-beam or girder | -- | 1957 | -- | 40.0 | 42.0 | Fair | 95.4 | 51C0125 |
NBI report | STATE ROUTE 225 | US HIGHWAY 101 | 05-SB-225-0.01-SB | Concrete Box beam or girders - Multiple (2 spans) | -- | 1957 | 1984 | 90.2 | 175.5 | Good | 88.6 | 51 0190 |
NBI report | JALAMA RD | SALSIPUEDES CREEK | 1.69 MI SOUTH OF SR 1 | Steel Stringer/Multi-beam or girder (3 spans) | -- | 1958 | -- | 40.0 | 102.0 | Fair | 61.1 | 51C0014 |
NBI report | PUEBLO ST | MISSION CREEK | 0.1 MI W OAK PARK LANE | Prestressed Slab | -- | 1958 | -- | 26.9 | 29.9 | Fair | 57.0 | 51C0245 |
NBI report | STATE ROUTE 1 | EL JARO CREEK | 05-SB-001-11.40 | Concrete Tee beam (3 spans) | -- | 1958 | -- | 49.9 | 131.6 | Good | 79.3 | 51 0093 |
NBI report | U.S. HIGHWAY 101 | SAN ANTONIO CREEK | 05-SB-101-70.99 | Concrete Culvert (3 spans) | -- | 1958 | -- | 9.8 | 34.1 | Fair | 76.7 | 51 0067 |
NBI report | US HIGHWAY 101 NB | STATE ROUTE 135 | 05-SB-101-70.91 | Concrete Tee beam (3 spans) | -- | 1958 | -- | 60.0 | 125.0 | Poor | 95.0 | 51 0073R |
NBI report | US HIGHWAY 101 NB | LAS LLAGAS UC | 05-SB-101-32.84 | Concrete Slab | -- | 1958 | -- | 27.9 | 30.8 | Good | 80.9 | 51 0196R |
NBI report | US HIGHWAY 101 NB | EL CAPITAN STATE BEACH | 05-SB-101-33.85 | Concrete Tee beam (3 spans) | -- | 1958 | -- | 50.9 | 129.6 | Good | 84.4 | 51 0197R |
NBI report | US HIGHWAY 101 SB | STATE ROUTE 135 | 05-SB-101-70.91 | Concrete Tee beam (3 spans) | -- | 1958 | -- | 60.0 | 125.0 | Poor | 95.0 | 51 0073L |
NBI report | US HIGHWAY 101 SB | LAS LLAGAS UC | 05-SB-101-32.84 | Concrete Slab | -- | 1958 | -- | 27.9 | 30.8 | Good | 79.4 | 51 0196L |
NBI report | US HIGHWAY 101 SB | EL CAPITAN STATE BEACH | 05-SB-101-33.85 | Concrete Tee beam (3 spans) | -- | 1958 | -- | 50.9 | 129.6 | Good | 84.4 | 51 0197L |
NBI report | US HIGHWAY 101 NB | DOS PUEBLOS CRK & CYN RD | 05-SB-101-30.06 | Concrete Tee beam (3 spans) | -- | 1958 | 1993 | 81.7 | 223.4 | Fair | 83.2 | 51 0033R |
NBI report | CLIFF DRIVE | ARROYO BURRO CREEK | 0.05 MI W OF S.H. 225 | Prestressed Slab | -- | 1959 | -- | 36.1 | 38.1 | Good | 93.4 | 51C0057 |
NBI report | FERNALD PT LN | ROMERO CREEK | S OF US 101 AT MONTECITO | Concrete Slab | -- | 1959 | -- | 36.1 | 41.0 | Poor | 24.2 | 51C0137 |
NBI report | FERNALD PT LN | SAN YSIDRO CREEK | S OF US 101 AT MONTECITO | Concrete Slab | -- | 1959 | -- | 27.9 | 31.5 | Fair | 67.7 | 51C0138 |
NBI report | SOUTH REFUGIO ROAD | QUIOTA CREEK | 2.7 MI S SANTA YNEZ RIVER | Steel Stringer/Multi-beam or girder | -- | 1959 | -- | 39.4 | 39.4 | Fair | 65.8 | 51C0377 |
NBI report | STATE ROUTE 1 | EL JARO CREEK | 05-SB-001-13.34 | Steel Stringer/Multi-beam or girder (3 spans) | -- | 1959 | -- | 80.1 | 243.1 | Good | 67.1 | 51 0094 |
NBI report | TANGAIR ROAD | UNION PACIFIC RAILROAD | FROM MAIN GATE: TAKE CALI | Concrete Tee beam (3 spans) | -- | 1959 | -- | 62.7 | 125.0 | Fair | 81.4 | AFCAXUMU01600 |
NBI report | US HIGHWAY 101 NB | SHEFFIELD DRIVE | 05-SB-101-9.00 | Concrete Tee beam (3 spans) | -- | 1959 | -- | 44.0 | 104.3 | Fair | 55.5 | 51 0189R |
NBI report | REFUGIO ROAD | REFUGIO CREEK | 0.3 MI N OF SR 101 | Steel Stringer/Multi-beam or girder | -- | 1959 | 1969 | 32.2 | 35.1 | Fair | 76.4 | 51C0218 |
NBI report | BETTERAVIA RD | BRADLEY CANYON CHANNEL | 1 MI E PHILBRIC RD | Concrete Tee beam (5 spans) | -- | 1960 | -- | 62.0 | 273.0 | Poor | 55.4 | 51C0313 |
NBI report | CALLE REAL RD | LAS VEGAS CREEK | 0.2 MI W FAIRVIEW AVE | Concrete Culvert (2 spans) | -- | 1961 | -- | 14.1 | 28.9 | Fair | 87.5 | 51C0212 |
NBI report | CATHEDRAL OAK RD | MARIA YGNACIO CREEK | 0.4 MI E PATTERSON AVE | Concrete Culvert (2 spans) | -- | 1961 | -- | 12.1 | 26.9 | Poor | 66.8 | 51C0063 |
NBI report | EL RANCHO ROAD | UNION PACIFIC RAILROAD | 10.1 MILES FROM MAIN GATE | Prestressed Box beam or girders - Multiple | -- | 1961 | -- | 61.0 | 150.9 | Fair | 44.9 | AFCAXUMU01910 |
NBI report | PUENTE DRIVE | ATASCADERO CREEK | 0.36 MI S HOLLSTER AVE | Wood Slab | -- | 1961 | -- | 27.9 | 30.8 | Good | 94.6 | 51C0058 |
NBI report | VAREDA GALERIA | TECOLOTE CREEK | 0.15 MI N VEREDA DEL PAD | Prestressed Slab | -- | 1961 | -- | 39.0 | 41.0 | Good | 98.0 | 51C0221 |
NBI report | VAREDA LEYENDA | TECOLOTE CREEK | 0.15 MI N VEREDA GALERIA | Prestressed Slab | -- | 1961 | -- | 43.0 | 44.9 | Fair | 85.0 | 51C0222 |
NBI report | VERDE DEL PADRE | TECOLOTE CREEK | WEST OF LEYENDA | Prestressed Slab | -- | 1961 | -- | 39.0 | 41.0 | Good | 98.0 | 51C0220 |
NBI report | TURNPIKE ROAD | UP RR & AMTRAK | S SR 101 | Prestressed Stringer/Multi-beam or girder | -- | 1961 | 1975 | 67.9 | 164.1 | Fair | 48.9 | 51C0154 |
NBI report | US HIGHWAY 101 NB | MARIA YGNACIO CREEK | 05-SB-101-20.95 | Concrete Tee beam (3 spans) | -- | 1961 | 1989 | 71.9 | 145.0 | Poor | 60.4 | 51 0162R |
NBI report | US HIGHWAY 101 NB | SAN JOSE CREEK | 05-SB-101-21.62 | Concrete Slab (3 spans) | -- | 1961 | 1989 | 37.1 | 103.4 | Poor | 57.3 | 51 0163R |
NBI report | AUGUSTA ST | SAN ANTONIO CREEK | 0.2 MI N OF SH 135 | Wood Slab | -- | 1962 | -- | 28.9 | 29.5 | Good | 47.1 | 51C0223 |
NBI report | CENTRAL AVE | RODEO SAN PASQUAL CHAN | WEST DOUGLAS AVENUE | Prestressed Box beam or girders - Multiple | -- | 1962 | -- | 67.9 | 68.9 | Good | 95.6 | 51C0224 |
NBI report | N135-N101,N101-S13 | US HWY 101 (@PM 90.75) | 05-SB-135-17.78-SMRA | Concrete Tee beam (4 spans) | -- | 1962 | -- | 62.0 | 198.8 | Fair | 57.4 | 51 0203E |
NBI report | STATE ROUTE 1 | SOLOMON CANYON CREEK | 05-SB-001-47.91 | Concrete Slab (3 spans) | -- | 1962 | -- | 29.9 | 77.1 | Good | 86.8 | 51 0103 |
NBI report | STATE STREET | SAN ROQUE CREEK | 0.15 W OF ONTARE RD | Concrete Culvert (2 spans) | -- | 1962 | -- | 9.8 | 22.0 | Fair | 68.2 | 51C0242 |
NBI report | US HIGHWAY 101 SB | SANTA MARIA WAY | 05-SB-101-84.34 | Concrete Tee beam (3 spans) | -- | 1962 | -- | 60.0 | 165.4 | Fair | 82.0 | 51 0071L |
NBI report | WEST OCEAN AVE | RODEO SAN PASQUAL CHAN | 0.2 MI E OF DEWOLF | Concrete Tee beam | -- | 1962 | -- | 57.1 | 57.1 | Fair | 99.4 | 51C0312 |
NBI report | MAIN STREET | BRADLEY CHANNEL | 05-SB-166-8.92-SMRA | Concrete Culvert (3 spans) | -- | 1962 | 1983 | 7.9 | 25.9 | Good | 58.0 | 51 0324Y |
NBI report | U.S. HIGHWAY 101 | JONES STREET | 05-SB-101-88.10-SMRA | Concrete Tee beam (4 spans) | -- | 1962 | 2008 | 76.1 | 210.0 | Fair | 80.5 | 51 0200 |
NBI report | U.S. HIGHWAY 101 | STATE ROUTE 166 | 05-SB-101-88.60-SMRA | Concrete Tee beam (3 spans) | -- | 1962 | 2008 | 75.1 | 145.0 | Fair | 93.0 | 51 0201 |
NBI report | US HIGHWAY 101 NB | SANTA MARIA WAY | 05-SB-101-84.34 | Concrete Tee beam (3 spans) | -- | 1962 | 2008 | 60.0 | 166.3 | Fair | 82.0 | 51 0071R |
NBI report | ARRELLAGA STREET | MISSION CREEK | AT CASTILLO ST | Concrete Tee beam (3 spans) | -- | 1963 | -- | 49.9 | 102.0 | Poor | 63.7 | 51C0149 |
NBI report | BAILARD AVENUE | US HIGHWAY 101 | 05-SB-101-1.62-CARP | Prestressed Stringer/Multi-beam or girder (2 spans) | -- | 1963 | -- | 65.6 | 188.0 | Poor | 67.7 | 51 0224 |
NBI report | CASTILLO STREET | MISSION CREEK | AT CANON PERDIDO | Concrete Tee beam | -- | 1963 | -- | 29.9 | 85.0 | Good | 96.7 | 51C0145 |
NBI report | E217-S101 CONNECTR | UP RR,AMTRAK,S101-OFFRMP | 05-SB-217-2.67-SB | Concrete Box beam or girders - Multiple (6 spans) | -- | 1963 | -- | 107.0 | 482.0 | Good | 95.8 | 51 0297G |
NBI report | HWY 101 NB RT LANE | MISSION CREEK | 05-SB-101-R14.96-SB | Concrete Tee beam | -- | 1963 | -- | 29.9 | 33.1 | Good | 86.8 | 51 0208M |
NBI report | N101-W217 CONNECTR | UP RR, AMTRAK, U.S. 101 | 05-SB-101-21.41-SB | Prestressed Stringer/Multi-beam or girder (4 spans) | -- | 1963 | -- | 126.0 | 659.5 | Fair | 88.9 | 51 0166G |
NBI report | PEDESTRIAN WALKWAY | U.S. HIGHWAY 101, UP RR | 05-SB-101-R14.96-SB | Steel Stringer/Multi-beam or girder | -- | 1963 | -- | 75.1 | -- | -- | -- | 51 0207 |
NBI report Bridgehunter | STATE ROUTE 154 | COLD SPRING CANYON | 05-SB-154-22.96 | Steel Arch - Deck (11 spans) | NR eligible | 1963 | -- | 700.2 | 1217.9 | Fair | 54.9 | 51 0037 |
NBI report | STATE ROUTE 217 | HOLLISTER AVE | 05-SB-217-2.23-SB | Prestressed Stringer/Multi-beam or girder | -- | 1963 | -- | 87.9 | 152.9 | Fair | 86.6 | 51 0160 |
NBI report | STATE ROUTE 217 | GOLETA SLOUGH | 05-SB-217-0.72-SB | Concrete Tee beam (6 spans) | -- | 1963 | -- | 44.9 | 258.5 | Fair | 80.0 | 51 0161 |
NBI report | STATE ROUTE 217 | SAN JOSE CREEK | 05-SB-217-1.02-SB | Concrete Slab (7 spans) | -- | 1963 | -- | 29.9 | 191.9 | Poor | 64.5 | 51 0217 |
NBI report | UP RR & AMTRAK | STATE ROUTE 225 | 05-SB-225-R4.61-SB | Steel Girder and floorbeam system | -- | 1963 | -- | 75.1 | -- | -- | -- | 51 0299 |
NBI report | UP RR & AMTRAK | CARRILLO STREET | JUST SW SR 101 | Steel Girder and floorbeam system | -- | 1963 | -- | 83.0 | -- | -- | -- | 51C0146 |
NBI report | UP RR & AMTRAK | MISSION STREET | 0.1 MI NE MODOC RD | Steel Girder and floorbeam system | -- | 1963 | -- | 74.2 | -- | -- | -- | 51C0150 |
NBI report | WEST OCEAN AVE | SAN MIGUELITO CREEK | 1.6 MI W ARGUELLO BLVD | Concrete Tee beam (3 spans) | -- | 1963 | -- | 49.9 | 122.1 | Fair | 94.7 | 51C0311 |
NBI report | MISSION ST | MISSION CREEK | WEST OF CASTILLO ST | Concrete Tee beam | -- | 1963 | 1988 | 30.8 | 32.2 | Good | 73.6 | 51C0151 |
NBI report | CARRILLO ST | MISSION CREEK | WEST OF CASTILLO ST | Concrete Tee beam | -- | 1963 | 1989 | 30.8 | 32.2 | Good | 93.2 | 51C0147 |
NBI report | US HIGHWAY 101 NB | CASTILLO STREET | 05-SB-101-R14.19-SB | Concrete Box beam or girders - Multiple | -- | 1963 | 1989 | 73.2 | 128.9 | Poor | 60.1 | 51 0204R |
NBI report | US HIGHWAY 101 NB | CARRILLO STREET | 05-SB-101-R14.76-SB | Concrete Box beam or girders - Multiple | -- | 1963 | 1989 | 82.0 | 141.1 | Fair | 76.2 | 51 0206R |
NBI report | US HIGHWAY 101 NB | MISSION STREET | 05-SB-101-R15.73-SB | Concrete Box beam or girders - Multiple | -- | 1963 | 1989 | 71.9 | 126.6 | Good | 90.2 | 51 0210R |
NBI report | US HIGHWAY 101 SB | CASTILLO STREET | 05-SB-101-R14.19-SB | Concrete Box beam or girders - Multiple | -- | 1963 | 1989 | 74.2 | 138.8 | Fair | 83.0 | 51 0204L |
NBI report | US HIGHWAY 101 SB | CARRILLO STREET | 05-SB-101-R14.76-SB | Concrete Box beam or girders - Multiple | -- | 1963 | 1989 | 82.0 | 142.1 | Fair | 76.2 | 51 0206L |
NBI report | US HIGHWAY 101 SB | MISSION STREET | 05-SB-101-R15.73-SB | Concrete Box beam or girders - Multiple | -- | 1963 | 1989 | 71.9 | 128.6 | Good | 90.2 | 51 0210L |
NBI report | STATE ROUTE 154 | VEHICLE & CATTLE ACCESS | 05-SB-154-18.83 | Concrete Slab | -- | 1963 | 2001 | 22.0 | 24.0 | Good | 62.7 | 51 0107 |
NBI report | CATHEDRAL OAKS RD | SAN JOSE CREEK | EAST OF KELLOG AVE | Concrete Tee beam (3 spans) | -- | 1964 | -- | 77.8 | 167.0 | Good | 93.7 | 51C0194 |
NBI report | HOLLISTER AVE | SAN JOSE CREEK | 0.1 MI EAST KELLOG AVE | Prestressed Slab | -- | 1964 | -- | 42.0 | 44.0 | Poor | 48.3 | 51C0027 |
NBI report | MOUNTAIN DR | SAN YSIDRO CREEK | 0.25 MI W OF PARK LN | Prestressed Box beam or girders - Multiple | -- | 1964 | -- | 47.9 | 49.9 | Fair | 78.9 | 51C0202 |
NBI report | NINOS DR | SYCAMORE CREEK | N ENTR TO EL ESCORIAL | Concrete Culvert (3 spans) | -- | 1964 | -- | 7.9 | 27.9 | Fair | 80.9 | 51C0292 |
NBI report | POR LAMAR DR | SYCAMORE CREEK | S ENTR TO EL ESCORIAL | Concrete Culvert (3 spans) | -- | 1964 | -- | 7.9 | 27.9 | Fair | 80.9 | 51C0291 |
NBI report | STATE ROUTE 135 | SAN ANTONIO CREEK | 05-SB-135-R7.22 | Concrete Box beam or girders - Multiple (3 spans) | -- | 1964 | -- | 55.1 | 141.4 | Good | 90.0 | 51 0006 |
NBI report | HOLLISTER AVE | MARIA YGNACIO CREEK | 0.12 MI E PATTERSON AVE | Prestressed Slab | -- | 1964 | 1981 | 63.0 | 64.0 | Good | 97.2 | 51C0026 |
NBI report | GLEN ANNIE ROAD | GLEN ANNIE CREEK | 0.29 MI S HOLLISTER AVE | Concrete Culvert (2 spans) | -- | 1964 | 1999 | 13.1 | 25.9 | Fair | 75.9 | 51C0007 |
NBI report | ALISOS DR | BUENA VISTA CREEK | BET OAK DR AND LILAC DR | Concrete Slab | -- | 1965 | -- | 20.0 | 25.9 | Good | 96.0 | 51C0236 |
NBI report | CATHEDRAL OAKS RD | GLEN ANNIE CREEK | 0.04 MI W GLEN ANNIE RD | Concrete Culvert (2 spans) | -- | 1965 | -- | 12.1 | 24.9 | Fair | 91.0 | 51C0209 |
NBI report | CLARK AVE | GRACIOSA CANYON CREEK | 0.02 MI W BLOSSER RD | Concrete Culvert (2 spans) | -- | 1965 | -- | 10.8 | 22.3 | Good | 99.4 | 51C0234 |
NBI report | DAMASSA ST | US HIGHWAY 101 | 05-SB-101-R57.55 | Concrete Box beam or girders - Multiple (4 spans) | -- | 1965 | -- | 59.1 | 171.9 | Good | 82.9 | 51 0225 |
NBI report | HOLLISTER AVE | CARNEROS CREEK | 0.05 MI E OF AERO CAMINO | Concrete Culvert (2 spans) | -- | 1965 | -- | 17.1 | 35.1 | Fair | 85.9 | 51C0127 |
NBI report | LILAC LN | BUENA VISTA CREEK | NORTH TOLLIS AVE | Concrete Slab | -- | 1965 | -- | 23.0 | 24.9 | Poor | 63.9 | 51C0200 |
NBI report | MOUNTAIN DR | HOT SPRINGS CREEK | AT RIVEN ROCK RD | Concrete Slab | -- | 1965 | -- | 35.1 | 37.1 | Poor | 61.7 | 51C0203 |
NBI report | OAK GROVE DR | BUENA VISTA CREEK | 0.17 MI N OF E VALLEY RD | Concrete Slab | -- | 1965 | -- | 23.0 | 24.9 | Good | 92.0 | 51C0204 |
NBI report | SANTA ROSA ROAD | US HIGHWAY 101 | 05-SB-101-R56.46 | Concrete Box beam or girders - Multiple (4 spans) | -- | 1965 | -- | 61.0 | 175.9 | Good | 89.1 | 51 0223 |
NBI report | STATE ROUTE 192 | SAN YSIDRO CREEK | 05-SB-192-R9.68 | Concrete Slab | -- | 1965 | -- | 32.2 | 34.1 | Fair | 65.7 | 51 0109 |
NBI report | STATE ROUTE 246 | ZACA CREEK | 05-SB-246-26.14 | Concrete Culvert (2 spans) | -- | 1965 | -- | 9.8 | 22.0 | Good | 70.0 | 51 0137 |
NBI report | STATE ROUTE 246 | US HIGHWAY 101 | 05-SB-246-26.27 | Concrete Box beam or girders - Multiple (4 spans) | -- | 1965 | -- | 62.0 | 186.0 | Good | 79.0 | 51 0222 |
NBI report | TORINO DRIVE | ARROYO BURRO CREEK | SOUTH OF BARCELONA DR | Concrete Culvert (2 spans) | -- | 1965 | -- | 12.1 | 27.9 | Fair | 92.5 | 51C0288 |
NBI report | U.S. HIGHWAY 101 | ZACA CREEK | 05-SB-101-R57.41 | Concrete Culvert (3 spans) | -- | 1965 | -- | 7.9 | 32.2 | Good | 70.0 | 51 0016 |
NBI report | US HIGHWAY 101 NB | SANTA YNEZ RIVER | 05-SB-101-R56.64 | Concrete Box beam or girders - Multiple (11 spans) | -- | 1965 | -- | 95.1 | 1000.0 | Fair | 76.7 | 51 0221R |
NBI report | US HIGHWAY 101 SB | SANTA YNEZ RIVER | 05-SB-101-R56.64 | Concrete Box beam or girders - Multiple (11 spans) | -- | 1965 | -- | 95.1 | 1000.0 | Fair | 76.7 | 51 0221L |
NBI report | CLARK AVE | US HIGHWAY 101 | 05-SB-101-82.18 | Prestressed Stringer/Multi-beam or girder (2 spans) | -- | 1966 | -- | 120.1 | 242.1 | Fair | 72.3 | 51 0232 |
NBI report | E CLARK AVENUE | ORCUTT CREEK | JUST WEST OF SR 135 | Concrete Culvert (2 spans) | -- | 1966 | -- | 12.1 | 25.9 | Good | 81.3 | 51C0309 |
NBI report | GLEN ANNIE RD | GLEN ANNIE CREEK | 1.2 MI N/O HOLLISTER AVE | Concrete Culvert (2 spans) | -- | 1966 | -- | 12.1 | 24.9 | Good | 80.6 | 51C0068 |
NBI report | STATE ROUTE 1 | VEHICLE ACCESS (PRIVATE) | 05-SB-001-R32.01 | Steel Arch - Deck | -- | 1966 | -- | 20.7 | 20.7 | Good | 82.0 | 51 0247 |
NBI report | STATE ROUTE 1 | VEHICLE ACCESS (PRIVATE) | 05-SB-001-R32.25 | Steel Arch - Deck | -- | 1966 | -- | 20.3 | 20.3 | Good | 82.0 | 51 0248 |
NBI report | STATE ROUTE 1 | VEHICLE ACCESS (PRIVATE) | 05-SB-001-R33.98 | Steel Arch - Deck | -- | 1966 | -- | 20.3 | 20.3 | Good | 85.2 | 51 0249 |
NBI report | STATE ROUTE 1 NB | ST RTE 135 (@PM 11.72) | 05-SB-001-M36.16 | Prestressed Stringer/Multi-beam or girder (3 spans) | -- | 1966 | -- | 102.0 | 245.1 | Good | 84.0 | 51 0034R |
NBI report | STATE ROUTE 1 NB | ST RT 135 SB (@PM R9.09) | 05-SB-001-R34.76 | Concrete Box beam or girders - Multiple (3 spans) | -- | 1966 | -- | 116.1 | 220.8 | Good | 93.4 | 51 0118R |
NBI report | STATE ROUTE 1 NB | SAN ANTONIO CREEK | 05-SB-001-M33.10 | Concrete Box beam or girders - Multiple (3 spans) | -- | 1966 | -- | 106.0 | 268.1 | Good | 94.3 | 51 0237R |
NBI report | STATE ROUTE 1 SB | SAN ANTONIO CREEK | 05-SB-001-M33.10 | Concrete Box beam or girders - Multiple (3 spans) | -- | 1966 | -- | 106.0 | 268.1 | Good | 96.3 | 51 0237L |
NBI report | STATE ROUTE 135 | HARRIS CANYON CREEK | 05-SB-135-M9.78 | Concrete Culvert (2 spans) | -- | 1966 | -- | 9.8 | 26.9 | Good | 72.1 | 51 0243 |
NBI report | STATE ROUTE 135 | HARRIS CANYON CREEK | 05-SB-135-M9.98 | Concrete Culvert (2 spans) | -- | 1966 | -- | 9.8 | 29.9 | Good | 72.1 | 51 0244 |
NBI report | STATE ROUTE 135 | HARRIS CANYON CREEK | 05-SB-135-M10.72 | Concrete Culvert (2 spans) | -- | 1966 | -- | 9.8 | 24.9 | Good | 75.7 | 51 0246 |
NBI report | STATE ROUTE 135 | ORCUTT CREEK | 05-SB-135-R10.37 | Concrete Culvert (2 spans) | -- | 1966 | -- | 9.8 | 24.0 | Good | 81.4 | 51 0251 |
NBI report | STATE ROUTE 135 NB | RICE RANCH RD | 05-SB-135-R10.00 | Concrete Box beam or girders - Multiple (3 spans) | -- | 1966 | -- | 66.9 | 142.4 | Good | 93.0 | 51 0120R |
NBI report | STATE ROUTE 135 NB | E CLARK AVE | 05-SB-135-R10.41 | Concrete Box beam or girders - Multiple (2 spans) | -- | 1966 | -- | 64.0 | 129.9 | Good | 92.2 | 51 0147R |
NBI report | STATE ROUTE 135 SB | RICE RANCH RD | 05-SB-135-R10.00 | Concrete Box beam or girders - Multiple (3 spans) | -- | 1966 | -- | 66.9 | 143.1 | Good | 92.4 | 51 0120L |
NBI report | STATE ROUTE 135 SB | E CLARK AVE | 05-SB-135-R10.41 | Concrete Box beam or girders - Multiple (2 spans) | -- | 1966 | -- | 64.0 | 129.9 | Good | 93.2 | 51 0147L |
NBI report | 4 TH ST | CARPINTERIA CREEK | IN CARP. ST. PARK | Concrete Tee beam (4 spans) | -- | 1967 | -- | 54.5 | 145.0 | Fair | 49.3 | 51P0002 |
NBI report | FIRESTONE | CARNEROS CREEK | EAST OF AERO CAMINO | Concrete Culvert (2 spans) | -- | 1967 | -- | 17.1 | 36.1 | Fair | 96.9 | 51C0304 |
NBI report | PATTERSON AVENUE | ATASCADERO CREEK | 1.0 MI S HOLLISTER AVE | Concrete Box beam or girders - Multiple (2 spans) | -- | 1967 | -- | 86.9 | 176.8 | Good | 61.0 | 51C0185 |
NBI report | S1-S101 CONNECTOR | GAVIOTA CREEK | 05-SB-001-R0.16 | Concrete Box beam or girders - Multiple (2 spans) | -- | 1967 | -- | 81.0 | 164.7 | Good | 90.6 | 51 0240F |
NBI report | STATE ROUTE 1 | EL JARO CREEK | 05-SB-001-R6.78 | Concrete Box beam or girders - Multiple (5 spans) | -- | 1967 | -- | 87.9 | 400.9 | Good | 74.8 | 51 0090 |
NBI report | STATE ROUTE 1 | EL JARO CREEK | 05-SB-001-R4.38 | Concrete Slab (3 spans) | -- | 1967 | -- | 36.1 | 91.9 | Good | 81.0 | 51 0150 |
NBI report | STATE ROUTE 1 | US HWY 101 (@PM R48.85) | 05-SB-001-R0.01 | Concrete Box beam or girders - Multiple (2 spans) | -- | 1967 | -- | 86.0 | 175.9 | Good | 94.0 | 51 0239 |
NBI report | STATE ROUTE 1 NB | GAVIOTA CREEK | 05-SB-001-R0.16 | Concrete Box beam or girders - Multiple (2 spans) | -- | 1967 | -- | 97.1 | 186.0 | Good | 94.7 | 51 0240R |
NBI report | STATE ROUTE 1 SB | S1-S101 CON & GAVIOTA CR | 05-SB-001-R0.16 | Concrete Box beam or girders - Multiple (3 spans) | -- | 1967 | -- | 119.1 | 313.3 | Good | 84.6 | 51 0231L |
NBI report | STOW CANYON RD | SAN PEDRO CREEK | 0.57 MI W/O FAIRVIEW AVE | Concrete Tee beam | -- | 1967 | -- | 40.0 | 41.0 | Fair | 94.3 | 51C0067 |
NBI report | ZOOLOGICAL GARDEN | SYCAMORE CREEK | AT NINOS DR | Concrete Culvert (3 spans) | -- | 1967 | -- | 7.9 | 25.9 | Fair | 69.5 | 51C0293 |
NBI report | STATE ROUTE 1 SB | SANTA YNEZ RIVER | 05-SB-001-22.52 | Concrete Tee beam (13 spans) | -- | 1967 | 2000 | 63.0 | 732.0 | Good | 83.7 | 51 0097L |
NBI report | LOS CARNEROS RD | CARNEROS CREEK | NORTH OF SR 101 | Concrete Culvert (2 spans) | -- | 1968 | -- | 11.2 | 22.0 | Fair | 81.6 | 51C0169 |
NBI report | PADARO LANE | U.S. HIGHWAY 101 | 05-SB-101-R7.13 | Concrete Box beam or girders - Multiple (2 spans) | -- | 1968 | -- | 97.1 | 193.9 | Good | 89.5 | 51 0227 |
NBI report | PADARO LANE | UP RR & AMTRAK | S OF US 101 | Concrete Tee beam (3 spans) | -- | 1968 | -- | 69.9 | 201.1 | Fair | 93.0 | 51C0161 |
NBI report | PADARO LANE | TORO CREEK | 0.35 MI S OF SR 101 | Concrete Tee beam (3 spans) | -- | 1968 | -- | 40.0 | 100.1 | Good | 84.1 | 51C0163 |
NBI report | PATTERSON AVE | SAN JOSE CREEK | 0.3 MI N CATHEDRAL OAK R | Concrete Tee beam (3 spans) | -- | 1968 | -- | 49.9 | 132.9 | Good | 97.6 | 51C0071 |
NBI report | STATE ROUTE 1 NB | CONSTELLATION ROAD | 05-SB-001-R25.07 | Concrete Box beam or girders - Multiple (3 spans) | -- | 1968 | -- | 84.0 | 154.2 | Good | 93.8 | 51 0236R |
NBI report | STATE ROUTE 1 SB | CONSTELLATION ROAD | 05-SB-001-R25.07 | Concrete Box beam or girders - Multiple (3 spans) | -- | 1968 | -- | 84.0 | 154.2 | Good | 93.8 | 51 0236L |
NBI report | STATE ROUTE 192 | BUENA VISTA CREEK | 05-SB-192-10.53 | Concrete Slab | -- | 1968 | -- | 20.0 | 22.6 | Good | 79.5 | 51 0042 |
NBI report | US HIGHWAY 101 NB | EVANS AVE | 05-SB-101-R8.26 | Concrete Tee beam (3 spans) | -- | 1968 | -- | 55.1 | 115.2 | Fair | 88.5 | 51 0226R |
NBI report | US HIGHWAY 101 NB | SOUTH PADARO LANE | 05-SB-101-R5.28 | Concrete Tee beam (3 spans) | -- | 1968 | -- | 55.1 | 115.2 | Good | 90.1 | 51 0228R |
NBI report | US HIGHWAY 101 SB | EVANS AVE | 05-SB-101-R8.26 | Concrete Tee beam (3 spans) | -- | 1968 | -- | 55.1 | 113.5 | Good | 90.5 | 51 0226L |
NBI report | US HIGHWAY 101 SB | SOUTH PADARO LANE | 05-SB-101-R5.28 | Concrete Tee beam (3 spans) | -- | 1968 | -- | 55.1 | 115.2 | Good | 88.3 | 51 0228L |
NBI report | VALERIO ST | MISSION CREEK | AT CASTILLO ST | Wood Stringer/Multi-beam or girder (5 spans) | -- | 1968 | -- | 18.0 | 86.9 | Good | 55.7 | 51C0290 |
NBI report | VIA REAL | TORO CREEK | 0.1 MI W OF TORO CYN RD | Concrete Tee beam (3 spans) | -- | 1968 | -- | 40.0 | 100.1 | Fair | 76.9 | 51C0162 |
NBI report | LOS CARNEROS ROAD | US HIGHWAY 101 | 05-SB-101-23.72 | Prestressed Stringer/Multi-beam or girder (2 spans) | -- | 1968 | 1993 | 95.1 | 182.1 | Good | 88.8 | 51 0241 |
NBI report | STATE ROUTE 154 | SAN LUCAS CREEK | 05-SB-154-R11.51 | Concrete Slab (3 spans) | -- | 1968 | 1998 | 27.9 | 71.9 | Good | 81.0 | 51 0121 |
NBI report | ALISOS ROAD | HAPPY CANYON CREEK | 0.13 MI S HAPPY CANYON RD | Concrete Slab (4 spans) | -- | 1969 | -- | 27.9 | 116.1 | Good | 91.4 | 51C0190 |
NBI report | CLIFF DRIVE | HILLSIDE | 0.1 M SW OF CASTILLO ST | Concrete Tee beam (23 spans) | -- | 1969 | -- | 16.1 | 395.0 | Good | 78.2 | 51C0383 |
NBI report | FLORADALE AVE | SANTA YNEZ RIVER | 0.8 MI N CENTRAL AVE | Concrete Box beam or girders - Multiple (6 spans) | -- | 1969 | -- | 94.2 | 521.0 | Poor | 89.5 | 51C0006 |
NBI report | HAPPY CANYON RD | HAPPY CANYON CREEK | 3.2 MI E OF ARMOUR RANCH | Concrete Slab (3 spans) | -- | 1969 | -- | 28.9 | 74.2 | Good | 94.5 | 51C0189 |
NBI report | SAN ANTONIO ROAD | SAN ANTONIO CREEK | CONTINUE NORTH ON CA-1 (D | Concrete Slab (2 spans) | -- | 1969 | -- | 40.0 | 80.1 | Fair | 87.3 | AFCAXUMU21320 |
NBI report | ST JOSEPH ST | SAN ANTONIO CREEK | 0.13 MI N OF SH 135 | Concrete Slab (3 spans) | -- | 1969 | -- | 28.9 | 71.9 | Good | 89.5 | 51C0191 |
NBI report | STATE ROUTE 166 | BUCKHORN CREEK | 05-SB-166-R24.07 | Concrete Culvert (2 spans) | -- | 1969 | -- | 14.8 | 29.5 | Good | 90.8 | 51 0055 |
NBI report | STATE ROUTE 166 | MIRANDA PINE CREEK | 05-SB-166-R24.99 | Concrete Tee beam (3 spans) | -- | 1969 | -- | 63.0 | 185.0 | Fair | 72.8 | 51 0056 |
NBI report | STATE ROUTE 166 | ALISO CREEK | 05-SB-166-R25.49 | Concrete Slab (3 spans) | -- | 1969 | -- | 28.9 | 86.0 | Fair | 66.0 | 51 0233 |
NBI report | 13TH STREET | SANTA YNEZ RIVER | 0.5 MILE FROM 13TH STREET | Prestressed Box Beam or girders - Single or Spread (9 spans) | -- | 1970 | -- | 58.1 | 500.0 | Good | 87.1 | AFCAXUMU01115 |
NBI report | BLOSSER ROAD | ORCUTT CREEK | N OF CLARK AVE | Concrete Culvert (2 spans) | -- | 1970 | -- | 11.2 | 23.0 | Good | 89.0 | 51C0180 |
NBI report | CATHEDRAL OAKS RD | SAN PEDRO CREEK | 0.7 MI WEST OF FAIRVIEW | Concrete Tee beam (3 spans) | -- | 1970 | -- | 49.9 | 102.7 | Good | 94.8 | 51C0186 |
NBI report | MCMURRAY RD | ZACA CREEK | AT DAMASSA ST | Concrete Culvert (3 spans) | -- | 1970 | -- | 9.8 | 32.2 | Good | 72.5 | 51C0298 |
NBI report | PARADISE RD | LEWIS CREEK | 4.5 MI EAST OF SR 154 | Concrete Box beam or girders - Multiple | -- | 1970 | -- | 120.1 | 122.4 | Fair | 71.4 | 51C0188 |
NBI report | PARADISE ROAD | LOS LAURELES CREEK | 0.8 MI N SR 154 | Concrete Box beam or girders - Multiple | -- | 1970 | -- | 120.1 | 123.0 | Good | 76.0 | 51C0072 |
NBI report | ALISAL ROAD | SANTA YNEZ RIVER | 0.8 MI S SR 246 | Concrete Box beam or girders - Multiple (9 spans) | -- | 1971 | -- | 100.1 | 853.1 | Poor | 66.9 | 51C0008 |
NBI report | CARPINTERIA AVENUE | SANTA MONICA CREEK | 0.1 MI W SEVENTH ST | Concrete Slab | -- | 1971 | -- | 36.1 | 38.1 | Good | 97.5 | 51C0143 |
NBI report | CATHEDRAL OAKS RD | CARNEROS CREEK | 0.15 MI W LOS CARNEROS R | Concrete Box beam or girders - Multiple | -- | 1971 | -- | 80.1 | 83.0 | Good | 95.0 | 51C0192 |
NBI report | HOT SPRINGS RD | MONTECITO CREEK | 0.65 MI N OF US 101 | Concrete Slab | -- | 1971 | -- | 35.1 | 36.1 | Fair | 83.8 | 51C0041 |
NBI report | SR 150 (RINCON RD) | US HWY 101 (@PM R0.63) | 05-SB-150-R0.01 | Concrete Box beam or girders - Multiple (2 spans) | -- | 1971 | -- | 102.0 | 205.1 | Fair | 95.3 | 51 0230 |
NBI report | STATE ROUTE 154 | ALAMO PINTADO CREEK | 05-SB-154-R2.55 | Concrete Tee beam (3 spans) | -- | 1971 | -- | 44.0 | 116.1 | Fair | 87.3 | 51 0076 |
NBI report | STATE ROUTE 154 | SANTA AGUEDA CREEK | 05-SB-154-R9.97 | Concrete Box beam or girders - Multiple (2 spans) | -- | 1971 | -- | 101.1 | 202.8 | Fair | 78.9 | 51 0078 |
NBI report | STATE ROUTE 154 | SANTA INEZ RIVER | 05-SB-154-R10.12 | Concrete Box beam or girders - Multiple (10 spans) | -- | 1971 | -- | 107.0 | 1017.1 | Good | 80.9 | 51 0079 |
NBI report | TALLANT ROAD | MISSION CREEK | 0.05 MI WEST ALAMAR | Prestressed Slab | -- | 1971 | -- | 29.9 | 32.2 | Good | 64.8 | 51C0303 |
NBI report | US HIGHWAY 101 NB | UP RR & AMTRAK | 05-SB-101-R0.25 | Concrete Box beam or girders - Multiple (3 spans) | -- | 1971 | -- | 116.1 | 274.9 | Fair | 77.0 | 51 0229R |
NBI report | US HIGHWAY 101 SB | UP RR & AMTRAK | 05-SB-101-R0.26 | Concrete Box beam or girders - Multiple (3 spans) | -- | 1971 | -- | 106.6 | 276.3 | Fair | 77.9 | 51 0229L |
NBI report | ALVIN AVE | US HWY 101 & BRADLEY CHN | 05-SB-101-89.13-SMRA | Prestressed Stringer/Multi-beam or girder (3 spans) | -- | 1972 | -- | 108.9 | 306.1 | Good | 80.4 | 51 0040 |
NBI report | JUNIPERO STREET | MISSION CREEK | WEST OF ALAMAR AVE | Prestressed Slab | -- | 1972 | -- | 31.2 | 35.1 | Fair | 67.4 | 51C0302 |
NBI report | SALVAR RD | STATE ROUTE 154 | 05-SB-154-R31.20 | Prestressed Box beam or girders - Multiple (2 spans) | -- | 1972 | -- | 124.3 | 248.7 | Good | 87.0 | 51 0259 |
NBI report | STATE ROUTE 154 | LA COLINA RD | 05-SB-154-R32.07 | Prestressed Box beam or girders - Multiple | -- | 1972 | -- | 110.9 | 113.9 | Poor | 64.9 | 51 0256 |
NBI report | STATE ROUTE 154 | PRIMAVERA RD | 05-SB-154-R31.82 | Prestressed Box beam or girders - Multiple | -- | 1972 | -- | 108.9 | 109.9 | Poor | 66.6 | 51 0257 |
NBI report | STATE ROUTE 154 | STATE ROUTE 192 | 05-SB-154-R31.54 | Concrete Box beam or girders - Multiple (2 spans) | -- | 1972 | -- | 105.0 | 198.2 | Good | 94.0 | 51 0258 |
NBI report | STATE ROUTE 166 | CUYAMA RIVER | 05-SB-166-R34.95 | Prestressed Stringer/Multi-beam or girder (4 spans) | -- | 1972 | -- | 104.0 | 416.0 | Fair | 56.5 | 51 0041 |
NBI report | LILLINGSTON CYN RD | CARPINTERIA CREEK | 0.08 MI N OF SR 192 | Steel Arch - Deck | -- | 1973 | -- | 36.1 | 37.1 | Good | 83.5 | 51C0201 |
NBI report | LOS CANEROS ROAD | PEDESTRIAN ACCESS | NORTH EL COLEGIO RD | Concrete Frame | -- | 1973 | -- | 24.0 | 27.9 | Good | 92.2 | 51C0195 |
NBI report | SINALOA DR | OAK CREEK | 0.1 MI E OF SAN YSIDRO RD | Concrete Slab | -- | 1973 | -- | 21.0 | 24.3 | Fair | 85.0 | 51C0241 |
NBI report Bridgehunter | REFUGIO BEACH ROAD | CANADA DEL REFUGIO | REFUGIO STATE PARK | Concrete Culvert (2 spans) | -- | 1974 | -- | 14.1 | 29.9 | Good | 80.0 | 51P0005 |
NBI report | REFUGIO RD-N101 ON | CANADA DEL REFUGIO | 05-SB-101-R36.65 | Concrete Box beam or girders - Multiple | -- | 1974 | -- | 97.1 | 99.1 | Fair | 98.0 | 51 0030S |
NBI report | STATE ROUTE 166 | CUYAMA RIVER | 05-SB-166-R30.37 | Prestressed Stringer/Multi-beam or girder (3 spans) | -- | 1974 | -- | 89.9 | 274.0 | Fair | 74.2 | 51 0218 |
NBI report | STATE ROUTE 166 | CUYAMA RIVER | 05-SB-166-R30.73 | Prestressed Stringer/Multi-beam or girder (4 spans) | -- | 1974 | -- | 90.9 | 365.2 | Fair | 73.2 | 51 0219 |
NBI report | US HIGHWAY 101 NB | REFUGIO ROAD | 05-SB-101-R36.62 | Concrete Box beam or girders - Multiple (2 spans) | -- | 1974 | -- | 167.0 | 336.0 | Poor | 67.8 | 51 0215R |
NBI report | US HIGHWAY 101 SB | REFUGIO ROAD | 05-SB-101-R36.62 | Concrete Box beam or girders - Multiple (2 spans) | -- | 1974 | -- | 167.0 | 336.0 | Poor | 58.0 | 51 0215L |
NBI report | STATE ROUTE 135 | BRADLEY CHANNEL | 05-SB-135-17.55-SMRA | Concrete Culvert (5 spans) | -- | 1974 | 1985 | 4.9 | 30.8 | Fair | 68.8 | 51 0238 |
NBI report | TURNPIKE ROAD | US HIGHWAY 101 | 05-SB-101-20.06 | Prestressed Box beam or girders - Multiple (2 spans) | -- | 1975 | -- | 125.0 | 245.1 | Good | 91.1 | 51 0099 |
NBI report | RANCHO VERDE ST | BLOSSER CHANNEL | @ BLOSSER ROAD | Concrete Slab | -- | 1975 | 1991 | 32.8 | 33.8 | Poor | 67.7 | 51C0332 |
NBI report | TAYLOR STREET | BLOSSER CHANNEL | @ BLOSSER ROAD | Concrete Slab | -- | 1975 | 1991 | 33.5 | 35.4 | Good | 97.8 | 51C0333 |
NBI report | MALIBU DR | FRANKLIN CREEK | BTWN STERLING & TOMOL DR | Concrete Slab | -- | 1976 | -- | 35.1 | 41.0 | Poor | 65.6 | 51C0295 |
NBI report | PEDESTRIAN WALKWAY | LOMA ALTA DRIVE | 0.1 MI N SHORELINE DR | Wood Stringer/Multi-beam or girder | -- | 1976 | -- | 69.9 | -- | -- | -- | 51C0316 |
NBI report | TURNPIKE ROAD | SAN ANTONIO CREEK | @ CATHEDRAL OAKS RD | Concrete Tee beam | -- | 1976 | -- | 49.9 | 52.5 | Fair | 93.8 | 51C0266 |
NBI report | CARPINTERIA AVE | FRANKLIN CREEK | 0.1 MI W OF HOLLY AVE | Concrete Tee beam | -- | 1977 | -- | 58.1 | 62.0 | Fair | 97.3 | 51C0142 |
NBI report | SEVENTH ST | FRANKLIN CREEK | 0.15 MI E OF CARP. AVE | Concrete Slab | -- | 1977 | -- | 41.3 | 46.6 | Fair | 85.7 | 51C0050 |
NBI report | STATE ROUTE 192 | CARPINTERIA CREEK | 05-SB-192-R19.09 | Prestressed Box beam or girders - Multiple | -- | 1977 | -- | 115.2 | 115.2 | Good | 91.2 | 51 0115 |
NBI report | US HIGHWAY 101 SB | TORO CREEK | 05-SB-101-R6.79 | Concrete Tee beam | -- | 1977 | -- | 32.5 | 35.1 | Good | 89.2 | 51 0054L |
NBI report | ALAMO PINTADO RD | ALAMO PINTADO CREEK | 0.3 MI S BASE LINE AVE | Concrete Box beam or girders - Multiple | -- | 1978 | -- | 66.9 | 73.2 | Fair | 83.6 | 51C0078 |
NBI report | CAMPGROUND ROAD | ALISO CREEK | .5 MI FROM RIVER XING | Prestressed Slab | -- | 1978 | -- | 40.0 | 42.0 | Good | 85.0 | 050754000001010 |
NBI report | STOKES AVENUE | BRADLEY CHANNEL | 0.2 MI N OF E ALVIN | Concrete Culvert (2 spans) | -- | 1978 | -- | 14.1 | 28.5 | Good | 100.0 | 51C0364 |
NBI report | JAMES FOWLER ROAD | SAN PEDRO CREEK | WEST OF FAIRVIEW AVE | Concrete Slab (3 spans) | -- | 1980 | -- | 32.2 | 80.1 | Fair | 65.0 | 51C0261 |
NBI report | STATE ROUTE 154 | SAN ANTONIO CREEK | 05-SB-154-30.21 | Concrete Box beam or girders - Multiple (3 spans) | -- | 1980 | -- | 80.1 | 200.1 | Good | 93.5 | 51 0084 |
NBI report | STATE ROUTE 166 | COTTONWOOD CREEK | 05-SB-166-R51.41 | Concrete Box beam or girders - Multiple (2 spans) | -- | 1980 | -- | 89.9 | 180.1 | Fair | 65.0 | 51 0059 |
NBI report | STATE ROUTE 166 | CUYAMA RIVER | 05-SB-166-R69.94 | Concrete Box beam or girders - Multiple (7 spans) | -- | 1980 | -- | 86.0 | 560.1 | Fair | 78.0 | 51 0066 |
NBI report | ARMOUR RANCH ROAD | SANTA AQUEDA CREEK | 0.4 MI E SR 154 | Concrete Box beam or girders - Multiple | -- | 1981 | -- | 100.1 | 103.0 | Fair | 88.5 | 51C0074 |
NBI report | NORTH AVENUE | SAN MIGUELITO CHANNEL | @ V STREET | Concrete Slab (3 spans) | -- | 1981 | -- | 21.0 | 63.0 | Good | 95.6 | 51C0317 |
NBI report | CENTRAL AVE | SAN MIGUELITO CHANNEL | AT V STREET | Concrete Culvert (2 spans) | -- | 1982 | -- | 20.0 | 41.0 | Good | 83.2 | 51C0320 |
NBI report | ISLAY ST | MISSION CREEK | AT CASTILLO ST | Concrete Slab (2 spans) | -- | 1982 | -- | 30.8 | 53.2 | Poor | 39.8 | 51C0289 |
NBI report | PINE AVENUE | SAN MIGUELITO CHANNEL | AT V STREET | Concrete Culvert | -- | 1982 | -- | 22.0 | 22.0 | Good | 96.8 | 51C0319 |
NBI report | CALLE DE LOS AMIGO | ARROYO BURRO CREEK | 0.15 MI S PORTOFINO WAY | Concrete Culvert (2 spans) | -- | 1983 | -- | 22.0 | 47.9 | Fair | 95.9 | 51C0308 |
NBI report | HARRIS GRADE ROAD | SAN ANTONIO CREEK | 0.2 MI S OF SR 135 | Concrete Slab (3 spans) | -- | 1984 | -- | 25.9 | 80.1 | Good | 94.1 | 51C0310 |
NBI report | JALAMA RD | JALAMA CREEK | 10.1 MI W OF SH 1 | Concrete Box beam or girders - Multiple | -- | 1984 | -- | 98.1 | 100.1 | Good | 91.1 | 51C0091 |
NBI report | PRIMAVERA ROAD | CIENEGUITAS CREEK | 0.1 MI E OF SR 154 | Concrete Slab (3 spans) | -- | 1984 | -- | 27.9 | 72.5 | Fair | 76.6 | 51C0355 |
NBI report | STATE ROUTE 192 | SAN ROQUE CANYON | 05-SB-192-1.77-SB | Prestressed Box beam or girders - Multiple (3 spans) | -- | 1984 | -- | 200.1 | 487.9 | Good | 94.2 | 51 0104 |
NBI report | STATE ROUTE 225 | UP RR & AMTRAK | 05-SB-225-0.02-SB | Prestressed Slab | -- | 1984 | -- | 68.9 | 68.9 | Fair | 82.4 | 51 0220 |
NBI report | FOXEN CANYON RD | ZACA CREEK | 4.88 MI N OF S.H. 246 | Concrete Slab (3 spans) | -- | 1985 | -- | 34.1 | 88.9 | Good | 98.5 | 51C0086 |
NBI report | REFUGIO ROAD | SANTA YNEZ RIVER | 1.52 MI S SR 246 | Concrete Box beam or girders - Multiple (8 spans) | -- | 1985 | -- | 106.0 | 799.9 | Good | 95.1 | 51C0217 |
NBI report | SHIRRELL WAY | LAS VEGAS CREEK | 0.2 MI W FAIRVIEW AVE | Concrete Slab | -- | 1985 | -- | 24.9 | 27.9 | Good | 97.1 | 51C0315 |
NBI report | ALAMO PINTADO ROAD | ALAMO PINTADO CREEK | 1.6 MI N SR 246 | Concrete Box beam or girders - Multiple | -- | 1986 | -- | 80.1 | 80.1 | Good | 93.5 | 51C0077 |
NBI report | BASELINE AVE | ALAMO PINTADO CREEK | 0.2 MI E ALAMO PINTADO RD | Concrete Slab (3 spans) | -- | 1987 | -- | 44.0 | 86.9 | Good | 97.8 | 51C0079 |
NBI report | BECKSTEAD OC | US HIGHWAY 101 | 05-SB-101-44.82 | Concrete Box beam or girders - Multiple (2 spans) | -- | 1987 | -- | 107.9 | 209.0 | Poor | 71.0 | 51 0234 |
NBI report | US HIGHWAY 101 SB | GAVIOTA CREEK | 05-SB-101-47.90 | Prestressed Box beam or girders - Multiple (2 spans) | -- | 1987 | -- | 95.8 | 191.3 | Good | 96.3 | 51 0023L |
NBI report | FOXEN CANYON ROAD | CAT CANYON CREEK | 0.15 MI E PALMER RD | Concrete Slab (3 spans) | -- | 1988 | -- | 40.0 | 100.1 | Good | 97.0 | 51C0102 |
NBI report | HOPE AVENUE | ARROYO BURRO CREEK | 0.1 MILE S OF STATE ST | Concrete Culvert (2 spans) | -- | 1988 | -- | 16.1 | 35.4 | Good | 99.0 | 51C0357 |
NBI report | SANTA ROSA ROAD | E BRANCH SALSIPUEDES CRK | 0.47 MI EAST OF SH 1 | Prestressed Box beam or girders - Multiple | -- | 1988 | -- | 144.0 | 144.0 | Poor | 64.5 | 51C0020 |
NBI report | SHEFFIELD DR | BUENA VISTA CREEK | 0.3 MI N SAN LEANDRO LANE | Concrete Culvert | -- | 1988 | -- | 23.0 | 24.9 | Good | 91.7 | 51C0049 |
NBI report | LOS CARNEROS RD | TECOLOTITO CREEK | 0.1 MI N HOLLISTER AVE | Concrete Box beam or girders - Multiple | -- | 1989 | -- | 64.0 | 68.9 | Good | 89.5 | 51C0240 |
NBI report | SAN ANTONIO ROAD | SAN ANTONIO CREEK | 0.3 MI W OF SR 135 | Concrete Slab (2 spans) | -- | 1989 | -- | 37.1 | 74.2 | Fair | 82.5 | 51C0032 |
NBI report | SOLOMON ROAD | ORCUTT CREEK | 1.2 MI W BLOSSMER RD | Concrete Slab (2 spans) | -- | 1989 | -- | 29.9 | 60.0 | Fair | 84.2 | 51C0181 |
NBI report | MAGELLAN DRIVE | BRADLEY CHANNEL | 0.2 MI N OF E DONOVAN RD | Concrete Culvert (2 spans) | -- | 1990 | -- | 11.5 | 24.6 | Good | 100.0 | 51C0363 |
NBI report | U.S. HIGHWAY 101 | QUARANTINA STREET | 05-SB-101-13.01-SB | Prestressed Box beam or girders - Multiple (3 spans) | -- | 1990 | -- | 82.0 | 162.1 | Good | 86.7 | 51 0271 |
NBI report | U.S. HIGHWAY 101 | SALSIPUEDES STREET | 05-SB-101-13.14-SB | Prestressed Box beam or girders - Multiple (3 spans) | -- | 1990 | -- | 82.0 | 166.0 | Good | 87.8 | 51 0272 |
NBI report | US HIGHWAY 101 NB | GARDEN STREET | 05-SB-101-13.49-SB | Prestressed Box beam or girders - Multiple | -- | 1990 | -- | 96.1 | 100.4 | Fair | 80.1 | 51 0273R |
NBI report | US HIGHWAY 101 NB | STATE STREET | 05-SB-101-13.79-SB | Prestressed Box beam or girders - Multiple | -- | 1990 | -- | 83.0 | 85.3 | Good | 90.8 | 51 0276R |
NBI report | US HIGHWAY 101 NB | MISSION CREEK | 05-SB-101-13.96-SB | Concrete Slab | -- | 1990 | -- | 38.1 | 40.0 | Good | 92.9 | 51 0277R |
NBI report | US HIGHWAY 101 SB | GARDEN STREET | 05-SB-101-13.49-SB | Prestressed Box beam or girders - Multiple | -- | 1990 | -- | 96.1 | 100.4 | Fair | 77.0 | 51 0273L |
NBI report | US HIGHWAY 101 SB | STATE STREET | 05-SB-101-13.79-SB | Prestressed Box beam or girders - Multiple | -- | 1990 | -- | 83.0 | 85.0 | Good | 90.8 | 51 0276L |
NBI report | US HIGHWAY 101 SB | MISSION CREEK | 05-SB-101-13.96-SB | Concrete Slab | -- | 1990 | -- | 39.0 | 41.0 | Good | 92.9 | 51 0277L |
NBI report | PEDESTRIAN WALKWAY | STATE ROUTE 135 | 05-SB-135-15.65-SMRA | Concrete Stringer/Multi-beam or girder | -- | 1991 | -- | 79.1 | -- | -- | -- | 51 0301 |
NBI report | RAILROAD AVENUE | BRADLEY CHANNEL | @ CANAL STREET | Concrete Slab | -- | 1991 | -- | 43.3 | 45.3 | Good | 97.8 | 51C0334 |
NBI report | STATE STREET | MISSION CREEK | 0.01 MI INTX RTE 225 | Concrete Slab (2 spans) | -- | 1991 | -- | 46.3 | 92.5 | Good | 95.3 | 51C0260 |
NBI report | PATTERSON AVE | US HIGHWAY 101 | 05-SB-101-21.15 | Prestressed Box beam or girders - Multiple (2 spans) | -- | 1992 | -- | 107.0 | 208.0 | Fair | 92.3 | 51 0165 |
NBI report | PATTERSON AVE | UP RR & AMTRAK | S OF U.S. HWY 101 | Prestressed Box beam or girders - Multiple | -- | 1992 | -- | 128.9 | 133.9 | Good | 95.5 | 51C0155 |
NBI report | U.S. HIGHWAY 101 | CHAPALA ST EQUALIZER | 05-SB-101-13.89-SB | Concrete Culvert (11 spans) | -- | 1992 | -- | 5.9 | 62.0 | Good | 70.6 | 51 0303 |
NBI report | US HIGHWAY 101 NB | MISSION CREEK | 05-SB-101-13.93-SB | Concrete Slab | -- | 1992 | -- | 44.0 | 44.0 | Good | 92.9 | 51 0298R |
NBI report | US HIGHWAY 101 SB | MISSION CREEK | 05-SB-101-13.93-SB | Concrete Slab | -- | 1992 | -- | 44.0 | 44.0 | Good | 91.8 | 51 0298L |
NBI report | COLLEGE AVE | SAN MIGUELITO CHANNEL | AT V STREET | Concrete Culvert | -- | 1993 | -- | 22.0 | 22.0 | Good | 96.8 | 51C0318 |
NBI report | NOGAL DRIVE | CIENEGUITAS CREEK | 0.25 MI S HOLLISTER AVE | Concrete Slab | -- | 1993 | -- | 30.5 | 33.1 | Good | 82.3 | 51C0216 |
NBI report | US HIGHWAY 101 SB | DOS PUEBLOS CRK & CYN RD | 05-SB-101-30.07 | Concrete Box beam or girders - Multiple (3 spans) | -- | 1993 | -- | 92.9 | 224.1 | Good | 92.4 | 51 0033L |
NBI report | STATE ROUTE 1 | EL JARO CREEK | 05-SB-001-9.89 | Prestressed Stringer/Multi-beam or girder | -- | 1994 | -- | 96.1 | 101.1 | Good | 81.9 | 51 0091 |
NBI report | STATE ROUTE 1 | YTIAS CREEK | 05-SB-001-10.11 | Prestressed Stringer/Multi-beam or girder | -- | 1994 | -- | 108.9 | 109.9 | Good | 81.9 | 51 0092 |
NBI report | YANONALI STREET | LAGUNA DRAINAGE CHANNEL | 0.1 MI EAST OF GARDEN ST | Concrete Slab (2 spans) | -- | 1994 | -- | 27.6 | 57.7 | Good | 91.2 | 51C0323 |
NBI report | HOLLISTER AVENUE | SAN PEDRO CREEK | 0.05 MI W FAIRVIEW AVE | Prestressed Slab (2 spans) | -- | 1995 | -- | 41.0 | 82.0 | Good | 89.8 | 51C0131 |
NBI report | BATH ST | MISSION CREEK | BETWEEN ORTEGA AND COTA | Concrete Culvert | -- | 1996 | -- | 27.9 | 28.9 | Poor | 70.0 | 51C0325 |
NBI report | MISSION CANYON RD | MISSION CREEK | 0.4 MI N OF SR192 | Prestressed Slab | -- | 1996 | -- | 44.0 | 49.9 | Fair | 61.3 | 51C0052 |
NBI report | ALAMO PINTADO RD | ALAMO PINTADO CREEK | 4.16 MI N OF SH 246 | Concrete Box beam or girders - Multiple | -- | 1997 | -- | 59.7 | 62.7 | Good | 96.4 | 51C0080 |
NBI report | BETTERAVIA ROAD | US HIGHWAY 101 | 05-SB-101-86.59 | Prestressed Box beam or girders - Multiple (2 spans) | -- | 1997 | -- | 103.4 | 196.9 | Good | 95.1 | 51 0306 |
NBI report | EAST CABRILLO BLVD | SYCAMORE CREEK | 0.02 MI WEST OF NINOS DR | Prestressed Slab | -- | 1997 | -- | 58.1 | 58.4 | Good | 91.0 | 51C0328 |
NBI report | FIGUEROA MTN ROAD | ALAMO PINTADO CREEK | 4.2 MI NE OF SH 154 | Concrete Slab | -- | 1997 | -- | 34.5 | 37.1 | Good | 93.3 | 51C0084 |
NBI report | LA CUMBRE ROAD | US HIGHWAY 101 | 05-SB-101-17.78-SB | Prestressed Box beam or girders - Multiple (2 spans) | -- | 1997 | -- | 101.1 | 193.9 | Good | 82.0 | 51 0304 |
NBI report | LA CUMBRE ROAD | UP RR, AMTRAK, MODOC RD | 0.1 MI S S.R. 101 | Prestressed Box beam or girders - Multiple (2 spans) | -- | 1997 | -- | 105.0 | 209.0 | Fair | 86.7 | 51C0321 |
NBI report | MAIN ST-N101 ON RP | BRADLEY CHANNEL | 05-SB-101-88.68-SMRA | Concrete Culvert (2 spans) | -- | 1997 | -- | 12.1 | 101.7 | Fair | 94.2 | 51 0310S |
NBI report | N101-MAIN ST OFF | BRADLEY CHANNEL | 05-SB-101-88.54-SMRA | Concrete Culvert (2 spans) | -- | 1997 | -- | 9.8 | 21.7 | Fair | 97.3 | 51 0309S |
NBI report | NO DATA ENTERED | OSO CREEK | NO DATA ENTERED | Prestressed Slab | -- | 1997 | -- | 30.8 | 32.2 | Good | 67.5 | 050754000003007 |
NBI report | PATTERSON-S101 ON | MARIA YGNACIO CREEK | 05-SB-101-20.95 | Concrete Box beam or girders - Multiple (3 spans) | -- | 1997 | -- | 63.0 | 162.1 | Good | 85.0 | 51 0162K |
NBI report | STORKE ROAD | US HIGHWAY 101 | 05-SB-101-24.77 | Prestressed Box beam or girders - Multiple (2 spans) | -- | 1997 | -- | 118.8 | 219.8 | Good | 81.4 | 51 0307 |
NBI report | STORKE ROAD | UP RR & AMTRAK | 0.1 MI STH OF HWY 101 | Prestressed Stringer/Multi-beam or girder | -- | 1997 | -- | 82.0 | 82.0 | Good | 93.4 | 51C0322 |
NBI report | STOWELL RD | US HIGHWAY 101 | 05-SB-101-87.60 | Prestressed Box beam or girders - Multiple (2 spans) | -- | 1997 | -- | 100.4 | 191.3 | Fair | 92.1 | 51 0199 |
NBI report | U.S.HIGHWAY 101 | TECOLOTITO CREEK | 05-SB-101-24.71 | Prestressed Box Beam or girders - Single or Spread | -- | 1997 | -- | 58.4 | 58.4 | Poor | 78.6 | 51 0302S |
NBI report | US HIGHWAY 101 SB | MARIA YGNACIO CREEK | 05-SB-101-20.95 | Concrete Box beam or girders - Multiple (3 spans) | -- | 1997 | -- | 60.0 | 149.9 | Good | 85.0 | 51 0162L |
NBI report | SAN MARCOS RD | SAN ANTONIO CREEK | 0.2MI N EL CAMINO REAL RD | Concrete Tee beam | -- | 1998 | -- | 48.6 | 49.9 | Good | 95.5 | 51C0070 |
NBI report | SANTA MARIA MESA | SISQUOC RIVER | 0.6 MI E FOXEN CANYON RD | Prestressed Box beam or girders - Multiple (4 spans) | -- | 1998 | -- | 168.0 | 603.0 | Poor | 93.8 | 51C0095 |
NBI report | STATE ROUTE 154 | US HWY 101 (@PM 18.36) | 05-SB-154-32.27 | Concrete Stringer/Multi-beam or girder (2 spans) | -- | 1998 | -- | 98.8 | 200.1 | Good | 91.3 | 51 0308 |
NBI report | EAST CABRILLO BLVD | LAGUNA CHANNEL | 0.1 MI E STA. BARBARA ST | Concrete Box beam or girders - Multiple | -- | 1999 | -- | 45.3 | 50.2 | Fair | 94.2 | 51C0339 |
NBI report | CARLOTTI DRIVE | BRADLEY CHANNEL | 0.2 MI S SEAWARD DRIVE | Concrete Slab | -- | 2000 | -- | 43.3 | 46.3 | Good | 100.0 | 51C0335 |
NBI report | FAIRVIEW AVE | UP RR & AMTRAK | JUST S/O U.S. HWY 101 | Prestressed Stringer/Multi-beam or girder | -- | 2000 | -- | 74.2 | 74.2 | Fair | 80.3 | 51C0330 |
NBI report | STATE ROUTE 154 | US HWY 101 (@PM 63.30) | 05-SB-154-0.50 | Prestressed Box beam or girders - Multiple (2 spans) | -- | 2000 | -- | 106.6 | 213.3 | Good | 85.7 | 51 0329 |
NBI report Bridgehunter | STATE ROUTE 246 | SANTA ROSA CREEK | 05-SB-246-R20.22 | Prestressed Box beam or girders - Multiple | -- | 2000 | -- | 206.7 | 206.7 | Fair | 71.0 | 51 0139 |
NBI report | DONOVAN RD | US HIGHWAY 101 | 05-SB-101-89.69-SMRA | Prestressed Box beam or girders - Multiple (2 spans) | -- | 2001 | -- | 108.3 | 216.5 | Good | 97.9 | 51 0202 |
NBI report | FAIRVIEW AVE | U.S. HIGHWAY 101 | 05-SB-101-22.53 | Prestressed Box beam or girders - Multiple (2 spans) | -- | 2001 | -- | 107.0 | 208.3 | Fair | 79.3 | 51 0328 |
NBI report | LAUREN LANE | BRADLEY CHANNEL | 0.15 MI S SEAWARD DRIVE | Concrete Slab | -- | 2001 | -- | 43.3 | 47.2 | Good | 100.0 | 51C0336 |
NBI report | PEDESTRIAN WALKWAY | U.S. HIGHWAY 101, UP RR | 05-SB-101-R14.51-SB | Concrete Box beam or girders - Multiple | -- | 2001 | -- | 104.7 | -- | -- | -- | 51 0325 |
NBI report | STATE ROUTE 154 | HILLSIDE | 05-SB-154-29.60 | Prestressed Box beam or girders - Multiple (3 spans) | -- | 2001 | -- | 131.2 | 320.9 | Fair | 68.5 | 51 0300 |
NBI report | SUEY CROSSING RD | SANTA MARIA RIVER | EAST OF SUEY PARK | Steel Other (11 spans) | -- | 2001 | -- | 62.0 | 403.6 | Fair | 64.6 | 51C0331 |
NBI report | BONITA SCHOOL ROAD | SANTA MARIA RIVER | 0.3 MI N SR 166 | Steel Other (9 spans) | -- | 2002 | -- | 62.0 | 323.2 | Fair | 65.6 | 51C0230 |
NBI report | CALLE REAL | SAN JOSE CREEK | 0.7 MI E FAIRVIEW AVE | Concrete Slab (3 spans) | -- | 2002 | -- | 40.0 | 101.4 | Good | 77.3 | 51C0156 |
NBI report | EL RANCHO ROAD | SAN ANTONIO CREEK | FROM MAIN GATE: TAKE CALI | Prestressed Stringer/Multi-beam or girder (19 spans) | -- | 2003 | -- | 113.9 | 2100.5 | Good | 94.0 | AFCAXUMU01803 |
NBI report | MICHELTORENA ST | US HWY 101,UP RR,MISSION | 05-SB-101-R15.26-SB | Prestressed Box beam or girders - Multiple (3 spans) | -- | 2003 | -- | 154.5 | 373.7 | Good | 98.5 | 51 0327 |
NBI report | UNIVERSITY DRIVE | MARIA YGNACIA CREEK | 0.2 MI E PATTERSON AVE | Concrete Box beam or girders - Multiple | -- | 2003 | -- | 100.1 | 101.7 | Fair | 85.9 | 51C0219 |
NBI report | BELL ST | SAN ANTONIO CREEK | 0.5 MI N OF SR 135 | Prestressed Box beam or girders - Multiple | -- | 2004 | -- | 113.2 | 113.2 | Good | 94.8 | 51C0157 |
NBI report | SANJA COTA ROAD | SANJA DE COTA CREEK | 0.1 MI S SR246 OFF EDISON | Prestressed Box Beam or girders - Single or Spread | -- | 2004 | -- | 90.9 | 96.1 | Good | 91.9 | 51C0354 |
NBI report | BLOSSER ROAD | BLOSSER CHANNEL | AT BATTLES ROAD | Concrete Arch - Deck | -- | 2005 | -- | 48.2 | 50.2 | Good | 84.6 | 51C0367 |
NBI report | COX LANE | BLOSSER CHANNEL | AT N BLOSSER ROAD | Concrete Slab | -- | 2005 | -- | 27.9 | 32.8 | Good | 100.0 | 51C0366 |
NBI report | MATTHEWS STREET | SAN PEDRO CREEK | JUST WEST OF FAIRVIEW | Prestressed Slab | -- | 2005 | -- | 65.0 | 69.9 | Poor | 65.5 | 51C0351 |
NBI report | N JAMESON LN | ROMERO CREEK | 0.7 MI E SAN YSIDRO RD | Prestressed Box Beam or girders - Single or Spread | -- | 2005 | -- | 83.7 | 88.6 | Good | 94.4 | 51C0341 |
NBI report | N JAMESON LN | SAN YSIDRO CREEK | 0.45 MI E SAN YSIDRO RD | Prestressed Box Beam or girders - Single or Spread | -- | 2005 | -- | 75.5 | 80.4 | Good | 94.4 | 51C0342 |
NBI report | N JAMESON LN | OAK CREEK | 0.35 MI E SAN YSIDRO RD | Prestressed Box Beam or girders - Single or Spread | -- | 2005 | -- | 51.5 | 56.4 | Fair | 83.5 | 51C0343 |
NBI report | OLD COAST HIGHWAY | NOJOQUI CREEK | 0.6 MI S SR 101 | Prestressed Box Beam or girders - Single or Spread | -- | 2005 | -- | 119.4 | 121.4 | Fair | 86.6 | 51C0346 |
NBI report | STATE ROUTE 150 | RINCON CREEK | 05-SB-150-1.09 | Prestressed Box beam or girders - Multiple | -- | 2005 | -- | 101.7 | 105.3 | Fair | 87.5 | 51 0316 |
NBI report | STATE ROUTE 150 | RINCON CREEK | 05-SB-150-R1.55 | Prestressed Box beam or girders - Multiple | -- | 2005 | -- | 96.8 | 99.4 | Good | 94.8 | 51 0317 |
NBI report | W DONOVAN ROAD | BLOSSER CHANNEL | AT N BLOSSER ROAD | Concrete Slab | -- | 2005 | -- | 29.2 | 36.1 | Good | 100.0 | 51C0365 |
NBI report | JONATA PARK ROAD | ZACA CREEK | 2.4 MI N S.R. 246 | Prestressed Box beam or girders - Multiple | -- | 2008 | -- | 89.9 | 95.8 | Good | 92.8 | 51C0347 |
NBI report | DE LA VINA ST | MISSION CREEK | INTX DE LA VINA & HALEY | Concrete Slab | -- | 2010 | -- | 56.8 | 59.1 | Good | 96.1 | 51C0348 |
NBI report | TEPUSQUET ROAD | SISQUOC RIVER | 0.4 MI N FOXEN CANYON RD | Prestressed Box beam or girders - Multiple (5 spans) | -- | 2010 | -- | 152.9 | 689.0 | Fair | 98.0 | 51C0353 |
NBI report | CATHEDRAL OAKS RD | US HIGHWAY 101 | 05-SB-101-26.79 | Prestressed Box beam or girders - Multiple (2 spans) | -- | 2011 | -- | 96.1 | 185.4 | Good | 92.0 | 51 0331 |
NBI report | CATHEDRAL OAKS RD | UP RR & AMTRAK | AT HOLLISTER AVENUE | Concrete Box beam or girders - Multiple | -- | 2011 | -- | 162.4 | 169.0 | Good | 98.5 | 51C0344 |
NBI report | ORTEGA STREET | MISSION CREEK | BTWN CASTILLO AND BATH | Prestressed Slab | -- | 2011 | -- | 46.9 | 53.2 | Fair | 98.0 | 51C0349 |
NBI report | US HIGHWAY 101 | SYCAMORE CREEK | 05-SB-101-12.30 | Concrete Slab (3 spans) | -- | 2011 | -- | 37.4 | 86.9 | Fair | 73.0 | 51 0332 |
NBI report | SOUTH REFUGIO ROAD | QUIOTA CREEK | 2.0 MI S SANTA YNEZ RIVER | Concrete Arch - Deck | -- | 2012 | -- | 60.0 | 60.0 | Good | 80.0 | 51C0380 |
NBI report | US HIGHWAY 101 | MILPAS STREET | 05-SB-101-12.73 | Prestressed Slab (2 spans) | -- | 2012 | -- | 71.2 | 140.8 | Good | 84.0 | 51 0333 |
NBI report | US HIGHWAY 101 | CACIQUE STREET | 05-SB-101-12.60 | Concrete Slab (3 spans) | -- | 2012 | -- | 44.9 | 112.5 | Fair | 71.0 | 51 0335 |
NBI report | US HIGHWAY 101 | CACIQUE STREET | 05-SB-101-12.61 | Prestressed Slab (3 spans) | -- | 2012 | -- | 42.0 | 104.0 | Good | 89.5 | 51 0336 |
NBI report | CHAPALA STREET | MISSION CREEK | AT WEST YANONALI STREET | Concrete Slab | -- | 2013 | -- | 54.1 | 60.0 | Good | 96.9 | 51C0368 |
NBI report | SOUTH REFUGIO ROAD | QUIOTA CREEK | 2.5 MI S SANTA YNEZ RIVER | Concrete Arch - Deck | -- | 2013 | -- | 60.0 | 60.0 | Good | 80.0 | 51C0378 |
NBI report | SOUTH REFUGIO ROAD | QUIOTA CREEK | 2.4 MI S SANTA YNEZ RIVER | Concrete Arch - Deck | -- | 2013 | -- | 47.9 | 47.9 | Good | 80.0 | 51C0379 |
NBI report | UNION VALLY PKWAY | US HIGHWAY 101 | 05-SB-101-83.45 | Prestressed Box beam or girders - Multiple (2 spans) | -- | 2013 | -- | 142.1 | 263.8 | Fair | 90.5 | 51 0338 |
NBI report | BLACK ROAD | SOLOMON CANYON CREEK | 0.2 MI N STATE ROUTE 1 | Prestressed Box beam or girders - Multiple | -- | 2014 | -- | 94.2 | 94.2 | Good | 94.6 | 51C0369 |
NBI report | JONATA PARK RD | ZACA CREEK | 3 MI N SH 246 | Prestressed Stringer/Multi-beam or girder | -- | 2014 | -- | 118.1 | 118.1 | Good | 87.3 | 51C0356 |
NBI report | KINEVAN RD | SAN JOSE CREEK | 0.9 MI W SR 154 | Prestressed Slab | -- | 2014 | -- | 44.9 | 44.9 | Fair | 81.9 | 51C0372 |
NBI report | PUNTA GORDA ROAD | PUNTA GORDA CREEK | 0.3 KM SW OF SALINAS ST | Prestressed Slab | -- | 2014 | -- | 52.8 | 60.0 | Good | 96.9 | 51C0376 |
NBI report | SOUTH REFUGIO ROAD | QUIOTA CREEK | 1.5 MI S SANTA YNEZ RIVER | Prestressed Arch - Deck | -- | 2014 | -- | 53.2 | 57.7 | Good | 97.9 | 51C0388 |
NBI report | LOS CARNEROS ROAD | UP RR & AMTRAK | SOUTH OF RTE 101 PM 23.7 | Prestressed Stringer/Multi-beam or girder | -- | 2015 | -- | 75.1 | 77.8 | Good | 94.3 | 51C0340 |
NBI report | SOUTH REFUGIO ROAD | QUIOTA CREEK | 2.1 MI S SANTA YNEZ RIVER | Concrete Arch - Deck | -- | 2015 | -- | 52.8 | 57.7 | Good | 80.0 | 51C0387 |
NBI report | CATHEDRAL OAKS RD | SAN ANTONIO CREEK | @ TURNPIKE ROAD | Prestressed Box beam or girders - Multiple | -- | 2016 | -- | 70.5 | 75.1 | Good | 97.8 | 51C0373 |
NBI report | JALAMA RD | JALAMA CREEK | 8.8 MI WEST OF S.H. I | Prestressed Stringer/Multi-beam or girder | -- | 2016 | -- | 155.8 | 160.1 | Good | 82.7 | 51C0371 |
NBI report | S101-FAIRVIEW AVE | LAS VEGAS CREEK | 05-SB-101-22.57 | Concrete Slab | -- | 2016 | -- | 43.0 | 46.9 | Good | 97.2 | 51 0339K |
NBI report | SOUTH REFUGIO ROAD | QUIOTA CREEK | 2.2 MI S SANTA YNEZ RIVER | Concrete Arch - Deck | -- | 2016 | -- | 53.8 | 58.7 | Good | 80.0 | 51C0389 |
NBI report | U.S. HIGHWAY 101 | LAS VEGAS CREEK | 05-SB-101-22.57 | Concrete Slab | -- | 2016 | -- | 43.0 | 46.9 | Good | 85.0 | 51 0339 |
NBI report | U.S. HIGHWAY 101 | SAN PEDRO CREEK | 05-SB-101-22.80 | Concrete Slab | -- | 2016 | -- | 43.0 | 46.9 | Good | 88.9 | 51 0341 |
NBI report | SANDSPIT ROAD | GOLETA SLOUGH | AT GOLETA BEACH | Concrete Box beam or girders - Multiple (2 spans) | -- | 2017 | -- | 96.5 | 168.0 | Good | 97.2 | 51C0358 |
NBI report | SR 246 | SR 246 | 05-SB-246-R15.00 | Concrete Culvert (2 spans) | -- | 2018 | -- | 12.1 | 26.6 | Good | 69.9 | 51 0347 |