Bridges of Boulder City, Nevada

CarriesCrossesLocationDesignStatusYear BuiltYear Recon.Span Len.Total Len.ConditionSuff. RatingID
NBI reportPARKING LOT ACCESSHEMENWAY WASHBOULDER CITYConcrete Slab--1990--24.029.9Good95.0B1903
NBI reportFAIRWAY DRCHANNELBOULDER CITYConcrete Slab--1998--31.834.1Good97.0B2555
NBI reportGEORGIA AVE.BUCHANAN CHANNELBOULDER CITYConcrete Slab--1998--29.929.9Fair96.9B2552
NBI reportMENDOTA DRIVECHANNELBOULDER CITYConcrete Culvert (2 spans)--1998--9.821.3Good96.8B2554
NBI reportROYAL BIRKDALEBUCHANAN CHANNELBOULDER CITYConcrete Slab--1998--29.929.9Good97.0B2553