Bridges of Salem, Massachusetts

CarriesCrossesLocationDesignStatusYear BuiltYear Recon.Span Len.Total Len.ConditionSuff. RatingID
NBI reportST114 LAFAYETTE STWATER FOREST RIVER1.8 MI S SALEM CENTERSteel Stringer/Multi-beam or girder (2 spans)--1898196527.951.8Fair24.9S0100531MDOTNBI
NBI reportHWY CONGRESS STWATER SOUTH RIVERAT SOUTH RIVERPrestressed Box beam or girders - Multiple (2 spans)NR eligible1917199665.0134.8Good98.1S010042QEMUNNBI
NBI reportHWY JEFFRSON AVHWY PARALLEL STNEXT TO MBTASteel Stringer/Multi-beam or girder--1920--21.024.9Poor36.0S010242QHMUNNBI
NBI reportST107 BRIDGE STRR MBTA (STORAGE TUN).32 KM N SALEM CENTERConcrete Frame--1949--65.0190.0Fair95.7S0101732RDOT634
NBI reportST107 BRIDGE STRR MBTA (MAIN LINE).32 KM N SALEM CENTERConcrete Frame--1949--24.036.1Fair95.7S0101732VDOT634
NBI reportHWY GROVE STWATER NORTH RIVERAT NORTH RIVERConcrete Culvert (3 spans)--1950--7.926.9Fair86.9S010032QGMUNNBI
NBI reportST114 NORTH STWATER NORTH RIVER.16 KM N ST107Concrete Culvert (2 spans)--1952--12.124.0Poor48.3S010012UNDOTNBI
NBI reportST114 NORTH STCOMB ST107/BRG ST&MBTA.1 MI W SALEM CENTERSteel Stringer/Multi-beam or girder (3 spans)--1952--65.9138.1Fair54.8S0101832TDOT634
NBI reportHWY JEFFRSON AVRR MBTA/BMRR.4 MI W OF RTE 1ASteel Stringer/Multi-beam or girder--1953--73.276.1Fair85.6S010062QFMUNNBI
NBI reportST114 /WASHINGTONRR MBTA (TUNNEL)DOWN TOWN SALEMSteel Frame--1955--32.236.1Fair89.9S0101932UDOT634
NBI reportHWY MARCH STCOMB US 1A BYPASS & MBT.1MI W ST 1ASteel Stringer/Multi-beam or girderNR possible1994--87.994.2Good79.4S0100932QDOT634
NBI reportHWY FLINT STWATER NORTH RIVER CANAL.4 MI SW. OF RT114Prestressed Box beam or girders - Multiple--1998--45.345.3Fair81.6S01021AV1MUNNBI