Bridges of South Daytona, Florida

CarriesCrossesLocationDesignStatusYear BuiltYear Recon.Span Len.Total Len.ConditionSuff. RatingID
NBI reportUS-1Reed CanalUS-1 over Reed CanalConcrete Slab (4 spans)--1931196023.092.2Fair82.8790012
NBI reportSauls StreetReed CanalAt Reed Canal RoadPrestressed Tee beam--1965--40.040.0Good82.7796518
NBI reportReed Ca Prk Ent RdReed CanalIntrsect w Reed Canal RdWood Stringer/Multi-beam or girder (4 spans)--1983--15.757.1Poor31.9796500
NBI reportSR-5ANova CanalSR-5A over Nova CanalConcrete Culvert (3 spans)--1998--12.138.1Good82.7790177
NBI reportSR-5ANova CanalSR-5A over Nova CanalConcrete Culvert (3 spans)--1998--10.835.1Good98.1790178
NBI reportSR-5ANova Canal0.4 Mi. S. of Beville RdConcrete Culvert (3 spans)--1998--9.829.9Good98.1790183
NBI reportSR-5ANova CanalSR-5A over Nova CanalConcrete Culvert (3 spans)--1998--9.832.2Good80.6790184