Jump to:
Bailey County
| Carries | Crosses | Location | Design | Status | Year Built | Year Recon. | Span Len. | Total Len. | Condition | Suff. Rating | ID |
NBI report | US 70 | PROGRESS DRAW | 1.5 MI NW OF FM 2079 | Concrete Culvert (4 spans) | NR possible | 1968 | -- | 8.9 | 44.0 | Fair | 84.0 | 050090005202024 |
NBI report | US 70 EB | DRAINAGE DITCH | 3.5 MI NW OF FM 2079 | Concrete Culvert (4 spans) | NR possible | 1968 | 1995 | 4.9 | 21.0 | Good | 99.8 | 050090005202022 |
NBI report | US 70 WB | DRAINAGE DITCH | 3.5 MI NW OF FM 2079 | Concrete Culvert (4 spans) | NR possible | 1968 | 1995 | 4.9 | 21.0 | Good | 99.8 | 050090005202023 |
NBI report | SH 214 | DRAINAGE DITCH | 2.8 MI N OF US 70 | Concrete Culvert (4 spans) | -- | 1984 | -- | 4.9 | 21.0 | Good | 100.0 | 050090046107007 |